# IMPULSE R06 · HP‑A nitrogen station [Technical data EN](../index_EN.html#technical) · [Русский](HPA_STATION_RU.md) · [Calculation JSON](../data/r06_hpa_station.json) · [Source register](../evidence/hpa_station_sources.json) ## Station selection The preferred candidate is a stationary package based on the **Hydro‑Pac LX C12‑40‑10500LX**, with a 40 hp motor (about 30 kW). The nitrogen chart places it in the 12,000 psig discharge class (82.7 MPa gauge). It lists 83 scfm at 2,000 psig suction (13.79 MPa gauge), roughly 2.74 kg/min using 20 °C and 1 atm for conversion. At 1,500 psig the catalogue gives 60 scfm (roughly 1.98 kg/min on the same basis). The quote must confirm the scfm basis and the current application curve. [Hydro‑Pac nitrogen data, p. 5](https://www.hydropac.com/literature/LX%20Capacity%20Chart%20N2%20scfm%2010-2008.pdf) At 2,000 psig the 20 hp Hydro‑Pac gives 36 scfm (roughly 1.19 kg/min) and a cycle of about 23.8 min before station losses. The archived MAXIMATOR VP/120/500/300 gives up to 400 normal L/min at 300 bar suction, about 0.5 kg/min. The current nitrogen product page specifies 415 bar for the /N2 station. BAUER GIB 26.12‑160‑520 is a larger industrial option with a 160 kW motor and 500 bar in the model table. [MAXIMATOR archive](https://maximator.com.br/catalogos/booster-de-gas/MAXIMATOR-Gas-Boosters.pdf) · [MAXIMATOR current page](https://www.maximator.de/en/Products-0611344961.html) · [BAUER GIB 26](https://www.bauer-kompressoren.de/en_en/gi-26-baureihe1) Request a complete station with ≥2.40 kg/min net average into HP‑A, source pressure maintained at the 2,000 psig reference operating point and confirmation of flow near end of fill. Require temperature conditioning and evidence for both vessels, mass and temperature logging, safety controls and a factory acceptance run on an HP‑A equivalent. Intensifier cooling protects the compressor. Onboard cooling requires separate validation. Price, lead time and support require a quote. [Hydro‑Pac cylinder-filling systems](https://www.hydropac.com/cylinder-filling.html) ## Recovery from one sprint AWD and RWD each require 11.62 kg. The reference state is 54.04 kg of nitrogen in the two HP‑A vessels (130 L total), equivalent to 49.05 MPa absolute at 20 °C. Time starts at completion of the sprint and ends at release after the HP‑A check. [Sprint model](SPRINT_REFILL_EN.md) | Stage | Budget, min | |---|---:| | Return to station and secure vehicle | 1.00 | | Connection and pre-check | 2.00 | | Transfer at 2.40 kg/min | 4.84 | | Cooling and stabilisation | 6.00 | | Leak check on isolated HP‑A | 4.00 | | Disconnect and release | 1.00 | | **Total / margin** | **18.84 / 1.16** | With 14 min outside transfer the minimum net rate is 1.94 kg/min. A 2.00 kg/min station gives 19.81 min, 1.50 kg/min gives 21.75 min and 1.00 kg/min gives 25.62 min. At 2.40 kg/min the maximum allowable thermal allocation is 7.16 min. Any additional top-up or waits count towards the total. ## Cooling and leak check The Span equation of state gives 42.42 kg immediately after the base pulse at −27.3 °C and 25.0 MPa. At 20 °C the same residual mass reaches 33.36 MPa. A rigid adiabatic vessel model with 20 °C inlet gas gives a hypothetical full-inventory state of 28.9 °C and 51.41 MPa for the cold residual or 65.7 °C and 61.05 MPa for the warm residual. These values test sensitivity to the initial state. The supplier must validate the pressure and temperature envelope. The fill and heat removal must stay within it throughout. [Span equation of state](https://www.nist.gov/publications/reference-equation-state-thermodynamic-properties-nitrogen-temperatures-63151-1000-k) The cooling sensitivity assumes a 20 °C heat sink. From 28 °C and an assumed thermal time constant of 4 min, cooling to 22 °C takes 5.55 min. From 35 °C with an 8 min time constant it takes 16.12 min and the whole cycle takes 28.96 min. At 30 °C ambient, passive cooling cannot reach 22 °C. The 22 °C point illustrates approach to the reference state. Acceptance uses verified mass and the equivalent state at 20 °C. The real thermal response of the two vessels remains unmeasured. A one-degree change at full inventory changes sealed-bank pressure by about 0.265 MPa. A leak check must account for temperature and measurement uncertainty. Four minutes is the budget for the validated between-run check. The method, minimum dwell and acceptance limits are set by the test authority and supplier. Qualification and mandatory inspections follow separate procedures. Standards applicability depends on the vessel, assembly and jurisdiction. [ISO 24431](https://www.iso.org/standard/63063.html) · [ISO 11755](https://www.iso.org/standard/35969.html) **Status.** The calculation fits 20 min under its stated conditions. Acceptance is open pending the qualified HP‑A envelope, measured end-of-fill flow, both vessels' thermal response and leak-check sensitivity. Time repeat cycles including a warm start. Record total refill mass, temperature and pressure in both vessels, leak-check result and any aborts. To reproduce the screening, run `python -B -X utf8 source/calculation/r06_hpa_station.py --output ./data` from the showcase.