# IMPULSE R06 · acceleration and nitrogen refill [Technical data EN](../index_EN.html#technical) · [Русский](SPRINT_REFILL_RU.md) · [Calculation JSON](../data/r06_sprint_refill.json) · [Sprint trace CSV](../data/r06_sprint_trace.csv) ## Standing-start 0–100 km/h | Mode | AWD, base | RWD, base | AWD, adverse | RWD, adverse | |---|---:|---:|---:|---:| | EV power, s | 2.89 | 4.34 | 4.23 | 6.74 | | EV power + rear pneumatic boost, s | 2.56 | 3.88 | 3.86 | 6.17 | | HP-A nitrogen used per pulse, kg | 11.62 | 11.62 | 8.86 | 8.86 | **Start.** Level track, no wind, downforce fans off, 98 kg driver. Sprint model start masses are 2,318.45 kg AWD and 2,218.97 kg RWD. The R06 mass ledger carries a 125 kg stock nitrogen allowance. The Span EOS gives 116.40 kg at 49.05 MPa and 20 °C. The sprint model corrects mass and CG by 8.60 kg at the four vessel centres. The nose bank is already modelled using Span. [Mass ledger](../evidence/technical_mass_inputs.json) · [R06 results](../data/r06_results.json) | Assumption | Base | Adverse | |---|---:|---:| | Tyre friction coefficient μ | 1.00 | 0.70 | | Rolling coefficient | 0.015 | 0.022 | | CdA, m² | 0.90 | 1.20 | | Low-speed wheel force cap AWD / RWD, kN | 42 / 21 | 25 / 12.5 | | Wheel power cap AWD / RWD, kW | 894 / 485 | 625 / 340 | | Initial rear thrust / gas flow, kN / kg/s | 16.78 / 25.12 | 11.75 / 17.58 | **Powertrain.** CAD labels show four 250 kW motors for AWD and two rear 250 kW motors for RWD. The DC budget assumes 1,000 kW less 20 kW for auxiliaries, 94% efficiency to the shaft and 97% gear efficiency. The adverse case assumes 70% of base power and 70% of base HP-A thrust and discharge at the same gas state. It is a sensitivity case. [Earlier R11B assumptions](../library/questions/evidence/extra/r11b_seven_scenarios.json) · [Electrical budget](../library/brief/SOURCES/S07_R11B_fan_budget.json) **Model.** Axle load transfer uses a 2.70 m wheelbase, approximately 0.343 m CG height and a 0.490 m rear thrust line above ground. The model incorporates each driven axle's torque, power and grip limits, aerodynamic drag, rolling resistance, gas consumption and CG movement. AWD can allocate torque up to these limits. Production traction control, rotating inertia, valve transients and BMS limits remain to be evaluated. **HP-A.** Four rear nozzles, two 14.3 mm CAD feed IDs, a discharge coefficient of 0.80 and the archived equivalent nozzle geometry. Pressure and temperature fall in the Span isentropic blowdown model. Pulse ends at 0.6 s or the 25 MPa model cutoff. The base case reaches the cutoff at 0.584 s. The adverse pulse ends at 0.600 s at about 29.48 MPa. HP-B and the nose bank remain isolated. Halving the time step changes sprint time by less than 0.001 s. ## Refilling Both variants have the same storage volumes and calculated refill times. Table rates are assumed net averages into the vessels. Gas-transfer time equals the refill mass divided by average net flow. | Case | Nitrogen, kg | 0.5 kg/min | 1 kg/min | 2 kg/min | |---|---:|---:|---:|---:| | HP-A after one base pulse | 11.62 | 23.2 min | 11.6 min | 5.8 min | | HP-A after one adverse pulse | 8.86 | 17.7 min | 8.9 min | 4.4 min | | HP-A, 130 L, from 25 MPa | 19.85 | 39.7 min | 19.8 min | 9.9 min | | HP-B, 150 L, from 25 MPa | 22.90 | 45.8 min | 22.9 min | 11.5 min | | Stock 280 L from 25 MPa | 42.75 | 85.5 min | 42.8 min | 21.4 min | | 31.29 L nose bank from 25 MPa on a separate bench | 4.78 | 9.6 min | 4.8 min | 2.4 min | For refill from 25 MPa both endpoints use a stabilised 20 °C and the final absolute pressure is 49.05 MPa. Span densities are 263.02 and 415.70 kg/m³. The 42.75 kg top-up and 25.04 kg usable stock at adiabatic blowdown to 25 MPa refer to different temperatures. Refilling after a pulse replaces the mass used. The nose collector is capped in CAD, so its row is a separate bench calculation. Pressures are model state points. Station performance up to the final pressure, actual net flow and full turnaround require measurement. Full turnaround includes connection, thermal stabilisation, leak checks and disconnection. Launch validation requires electrical limits under load, tyre grip and measured HP-A thrust. ## Reproduction From the showcase folder with the [dependencies](../source/calculation/requirements.txt) installed, run `python -B -X utf8 source/calculation/r06_sprint_refill.py --output ./data`. JSON records input hashes and assumptions. CSV contains time histories and both sides of the boost cutoff.