Modeled hop · 22 November 2026
VEKTOR R12E flight
From liftoff to first contact with a flat surface. The animation moves the geometry of the saved R12E along the computed flight trace.
Scenario assumptions
Electric acceleration is assumed complete at liftoff. Horizontal speed is prescribed at 100 km/h throughout the airborne segment. The climb uses the archived full-charge scenario. Thrust is switched off at the apex in the model, followed by passive descent. Body attitude is held fixed relative to the surface.
The model predicts no liftoff at a flow factor of 0.70. Airborne time and horizontal distance are both zero in that case.
First ground contact
Downward speed at first contact is 4.26 m/s. The trace ends at this event. Suspension impact, stable wheel support and a complete stop still require measured inputs and verification.
Calculation and source material
The geometry comes from R12E. Mass and lift inputs use the assumptions documented for R11P. The result describes one scenario on that basis.