Argon · V2 touchdown and V1 / V2 exploded assemblies
At 60 km/h entry, the tuned low hop of V2 rear_cover R06 ends with the front left tyre touching first. Peak clearance is 0.625 m and the contact point is moving downward at 0.257 m/s. The calculation meets the 0.5 m/s criterion.

| V2 metric | Original | Low hop |
|---|---|---|
| Airborne time | 2.291 s | 1.018 s |
| Forward travel | 38.26 m | 16.96 m |
| Peak assembly clearance | 5.175 m | 0.625 m |
| Contact point downward speed | 10.065 m/s | 0.257 m/s |
| Pitch | −2.269° | −0.325° |
| Roll | 1.498° | 0.351° |
| Splitter clearance at contact | 39 mm | 76 mm |
| Air used per run | 72.91 kg | 60.82 kg |
| Air remaining in vessels | 61.04 kg | 73.13 kg |
| Usable air down to the 80 bar cutoff | 0.00 kg | 12.09 kg |
Reducing hop height left air for braking with the underbody nozzles. Side nozzles correct heading. Geometry, mass and initial modelled air inventory match the original run. At the original 5.175 m peak, usable air was exhausted before braking. A 0.5 ms rerun gave 0.250 m/s and the same first tyre.
Verification ends at first contact. Soft touchdown from the original height, suspension loads, transition to all four tyres and rollout remain open.
Exploded views of the R07 assemblies
The 3D view separates the two models using subsystem bounds. Select V1, V2 or both, adjust separation and view angle, and select a numbered group to highlight it. The guide lines lead back to the assembled positions. GasR2 service parts are available in the service view. Offsets are illustrative. Physical removal sequence requires a separate check.

- Bodywork
- Cockpit
- Air vessels
- Load-bearing frame
- Wheels and suspension
- Nozzles
- Lines and equipment
8 · GasR2 service parts in the service view.