Argon R11 specifications
Technical and economic parameters for V1 panel_fit and V2 rear_cover. Each row shows where the value comes from and what needs confirmation.
Tesla comparison and +20% target
The reference is the 15 October 2026 Roadster event and published information for the relevant trim. Higher-is-better targets use ×1.2. Time uses the brief's 20% reduction, ×0.8. Five obstacles, one rotation and the touchdown limit remain individual criteria. Overall Rocket parity is still open. Tesla Q3 2026
| Metric | Tesla / baseline | Argon target | V1 | V2 | Improve / measure |
|---|---|---|---|---|---|
| Road range | 2026 Roadster family, 498.9–515.0 km. Cycle and Rocket-specific value are open. | 598.7–618.0 km on the same cycle | Indicative gap 184.3 kmIndicative shortfall 414.4–433.7 km at 90 km/h. Energy equivalent at unchanged consumption 182–188 kWh | Indicative gap 209.8 kmIndicative shortfall 388.8–408.2 km at 90 km/h. Energy equivalent at unchanged consumption 160–165 kWh | Verify usable battery capacity, measure road load and consumption on an agreed cycle. Recalculate mass for any pack change.Top Gear · 16.10.2026 · R11 · JSON |
| Rocket · 0–60 mph with gas | 0.59 s — Tesla's estimate as reported in the briefing | ≤ 0.472 s | Indicative gap 10.916 sAbove target by 10.444 s | Indicative gap 7.404 sAbove target by 6.932 s | Agree timing and rollout. On a closed test setup, measure grip, power curves, downforce and actual rear thrust over time.Top Gear · 16.10.2026 · R11 · JSON |
| Thrust · 0–60 mph with gas | < 1 s. The Thrust trim claim. | < 0.8 s from the advertised ceiling | Indicative gap 10.916 sOver the bound by more than 10.116 s | Indicative gap 7.404 sOver the bound by more than 6.604 s | Align trim and test protocol. The Argon R11 calculation has fan downforce off.Tesla · R11 · JSON |
| Electric 0–100 km/h | Rocket's EV-only time is open | After the baseline is known | Open 13.842 s | Open 8.772 s | Record mass, SOC, temperature, tyres and start timing, then repeat with gas disabled.R11 · 0–100 · Tesla |
| Road top speed | 370.1 km/h · 1 MW family, briefing figure | ≥ 444.2 km/h · reference | Open — | Open — | Confirm the specific Rocket limit and verify Argon tyres, gearing, cooling and stability limits.Top Gear · 16.10.2026 |
| Peak drive power | 1,000 kW · Performance family | ≥ 1,200 kW · reference | Indicative gap 248 kWR3 shaft model. Gap if measured on the same basis 952 kW | Indicative gap 248 kWR3 shaft model. Gap if measured on the same basis 952 kW | Verify Tesla's power measurement point. Measure Argon DC and shaft curves at matched SOC, temperature and duration.Top Gear · 16.10.2026 · R3 |
| Battery charging | Family, up to 500 kW and <15 min over 15–80% SOC | <12 min at matched conditions; confirm the power curve | Open — | Open — | Confirm battery and thermal design. Capture energy and power on the same SOC window.Top Gear · 16.10.2026 |
| Gas vessel volume | 600 L · Rocket, briefing figure | Set by the manoeuvre and mass budgets | Open 1,251.2 LModel equivalent | Open 331.1 LModel equivalent | Verify internal vessel capacity, total and usable air mass, and bench flow data. Capacity alone does not qualify a pass.Top Gear · 16.10.2026 · R11 |
| Dimensions, laden mass and battery capacity | Like-for-like Rocket values are open | Set limits for the common configuration | Open 3,849.4 kgModeled mass with gas | Open 2,856.8 kgModeled mass with gas | Weigh the agreed build with and without driver. Confirm envelope and usable battery energy while retaining GasR2 and A GUIv4.R11 · Top Gear · 16.10.2026 |
| Kickflip · five obstacles | Demonstration above five vehicles. Dimensions need calibration. | 5/5, then +20% clearance against a calibrated baseline | Passes in model 5/5Minimum clearance lower bound 0.225 m | Gap 2/53 sequential obstacles short | Calibrate reference dimensions and trajectory. Reassess V2 entry and restore a stable flight path over the entire row.Tesla Q3 2026 · R11 |
| Kickflip · one rotation | One complete rotation in the demonstration | 360° within tolerance, with recovery | Passes in model 357.7°Unwrapped model angle | Gap 606.6°Unwrapped model angle | Check tolerance and attitude against full angle traces. Resolve V2 over-rotation and verify wheels-down recovery.Tesla Q3 2026 · R11 |
| Kickflip · first touchdown | Tesla touchdown speed is open | Tyre first, downward ≤0.5 m/s · Argon criterion | Gap 7.905 m/sAbove limit by 7.405 m/s | Gap 11.114 m/sAbove limit by 10.614 m/s. V2 uses a wheel sphere and is not upright. | Measure the delivery curve and descent braking margin. Verify V2 contact with detailed tyre and body geometry.R11 |
| Kickflip · height, time and airborne distance | Calibrated Tesla time series is open | +20% on verified metrics at matched entry | Open 4.70 m / 2.842 s / 47.76 mLowest assembly-point clearance | Open 4.18 m / 2.050 s / 34.22 mV2 trace continues freely after a possible obstacle overlap | Recover scale, frame timing, lowest-point height, lift-off and contact for the reference run.Tesla Q3 2026 · R11 |
| Encore · tyre touchdown | Reference touchdown speed is open | Tyre first, downward ≤0.5 m/s · Argon criterion | Passed in archive 0.261 m/sR08 · separate charge | Passed in archive 0.228 m/sR08 · separate charge | Repeat with the common R11 configuration and check residual air for the next episode.R08 |
| Inverted ramp and hover | Tesla describes inversion and nozzle control. Holding duration is open. | Full sequence, then +20% on measured margin | Open — | Open — | Verify a dynamic ramp ascent and wheel reactions. Set hover tolerance, wind and duration, then measure air left.Tesla · Tesla Q3 2026 |
| Gas refill and repeatability | Rocket's complete recharge cycle is open | After measuring baseline: time ×0.8 under matched conditions | Open — | Open — | Measure kg/min, station kWh and readiness time with thermal soak. Verify the stunt sequence on one fill.Tesla |
The historical 620 mi belongs to the early concept (998 km). The separate target from that baseline is 1,197 km. The comparison above uses the October 310–320 mi range. Historical Tesla page
Dimensions and layout
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| Length | mm | 5,432.6 | 5,351.0 | CAD CAD R06 Visible R06 assembly envelope retained in R11. The new study volumes lie inside it. |
| Width | mm | 2,389.2 | 2,360.0 | CAD CAD R06 Visible R06 assembly envelope retained in R11. The new study volumes lie inside it. |
| Height | mm | 1,578.0 | 1,336.8 | CAD CAD R06 Visible R06 assembly envelope retained in R11. The new study volumes lie inside it. |
| Wheelbase | mm | 3,205 | 3,205 | CAD CAD R06 |
| Front track | mm | 1,920 | 1,920 | CAD CAD R06 |
| Rear track | mm | 1,975 | 1,975 | CAD CAD R06 |
| Tyre envelope diameter | mm | 700 | 700 | CAD CAD R06 |
| Modeled nozzles, vertical / side / rear | 12 / 12 / 4 | 12 / 12 / 4 | Model R11 · waypoints |
Mass and balance
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| Unladen mass, without crew or gas | kg | — | — | Open D02 Requires a reconciled build and weighing in the specified condition. |
| Calculated gas-free mass at the same loadout | kg | 3,356.1 | 2,679.7 | Model R11 R11 load case with the assumed 200 kg package. Equipment and crew require D02 loadout reconciliation. |
| Modeled fully charged mass | kg | 3,849.4 | 2,856.8 | Model R11 R11 load case with the assumed 200 kg package. Equipment and crew require D02 loadout reconciliation. |
| Dry mass of the added package | kg | 200 | 200 | Model R11 |
| Fully charged centre of mass X | mm | 4.8 | -37.0 | Model R11 Coordinates and axes of the source CAD assembly. |
| Fully charged inertia IXX | kg·m² | 8,169.8 | 5,183.7 | Model R11 Coordinates and axes of the source CAD assembly. |
| Fully charged centre of mass Y | mm | 3,145.6 | 2,674.4 | Model R11 Coordinates and axes of the source CAD assembly. |
| Fully charged inertia IYY | kg·m² | 2,160.1 | 1,195.3 | Model R11 Coordinates and axes of the source CAD assembly. |
| Fully charged centre of mass Z | mm | 689.4 | 439.5 | Model R11 Coordinates and axes of the source CAD assembly. |
| Fully charged inertia IZZ | kg·m² | 9,000.9 | 6,096.2 | Model R11 Coordinates and axes of the source CAD assembly. |
| Rated payload | kg | — | — | Open D02 Requires a reconciled build and weighing in the specified condition. |
Battery and electric drive
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| Installed gross battery capacity | kWh | — | — | Open D02 Requires the R11 battery datasheet and module configuration. |
| Installed usable battery capacity | kWh | — | — | Open D02 |
| Usable capacity in the historical R3 model | kWh | 56.16 | 56.16 | Reference R3 |
| Open-circuit voltage in the run-up model | V | 540 | 540 | Reference R3 |
| Current limit in the run-up model | A | 700 | 700 | Reference R3 |
| Shaft power at start / after 10 s | kW | 248 / 136 | 248 / 136 | Reference R3 |
| DC auxiliary load in the manoeuvre model | kW | 7.5 | 7.5 | Reference R3 |
| Battery charging power | kW | — | — | Open |
| Battery charge time 10–80% | min | — | — | Open |
Road range
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| Range at 60 km/h | km | 185.1 | 210.9 | Model R11 · DC Level road, no wind, gas assist or fan downforce. Fully gas-charged R11 mass at steady speed, with the R3 assumptions of 56.16 usable DC kWh and 7.5 kW auxiliaries. |
| Range at 90 km/h | km | 184.3 | 209.8 | Model R11 · DC |
| Range at 120 km/h | km | 163.2 | 182.9 | Model R11 · DC |
| DC consumption at a steady 90 km/h | kWh/100km | 30.48 | 26.76 | Model R11 · DC |
| Measured range on an agreed cycle | km | — | — | Open Measure usable battery energy, road load, consumption, temperature and SOC limits. |
Gas, capacity and replenishment
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| Confirmed internal volume of installed vessels | L | — | — | Open R07 |
| Outer upper-bound estimate of principal stock vessels | L | 1,601.6 | 379.3 | Reference R07 |
| Rear GasR2 outer-envelope volume | L | 94.6 | 94.6 | Reference R07 |
| Total R11 add-on envelope volume | L | 73.09 | 115.12 | CAD R11 |
| R11 equivalent added volume | L | 51.16 | 80.58 | Model R11 Equivalent volume for the gas model. The addition is assumed to be 70% of the envelope volume. |
| Total equivalent volume in the gas model | L | 1,251.2 | 331.1 | Model R11 Equivalent volume for the gas model. The addition is assumed to be 70% of the envelope volume. |
| Air mass at full modeled charge | kg | 493.30 | 177.04 | Model R11 |
| Usable air mass down to cutoff | kg | 257.84 | 96.36 | Model R11 |
| Air remaining at cutoff | kg | 235.46 | 80.67 | Model R11 |
| Initial absolute pressure in the model | bar | 400 | 700 | Model R11 |
| Absolute pressure cutoff in the model | bar | 80 | 80 | Model R11 |
| Common delivery cap in the model | kg/s | 160 | 160 | Reference R3 |
| Mean air replenishment rate | kg/min | — | — | Open Requires the station delivery curve versus pressure and thermal soak data. |
| Refill time from modeled cutoff to full charge | min | — | — | Open Requires the station delivery curve versus pressure and thermal soak data. |
| Station energy per refill cycle | kWh | — | — | Open Requires the station delivery curve versus pressure and thermal soak data. |
0–100 km/h run-up
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| 0–100 km/h · Electric | s | 13.842 | 8.772 | Model R11 · 0–100 R3 ground model with R11 mass, CG and gas inventory. Standing start, level road, fan downforce off. |
| Run-up distance · Electric | m | 216.48 | 123.37 | Model R11 · 0–100 |
| Run-up DC energy · Electric | kWh | 0.5442 | 0.3877 | Model R11 · 0–100 |
| 0–100 km/h · Electric + rear pneumatic assist | s | 11.832 | 7.743 | Model R11 · 0–100 R3 ground model with R11 mass, CG and gas inventory. Standing start, level road, fan downforce off. |
| Run-up distance · Electric + rear pneumatic assist | m | 187.08 | 116.22 | Model R11 · 0–100 |
| Run-up DC energy · Electric + rear pneumatic assist | kWh | 0.5179 | 0.3639 | Model R11 · 0–100 |
| Air used during assisted run-up | kg | 20.15 | 20.53 | Model R11 · 0–100 |
| Measured 0–100 km/h | s | — | — | Open |
| Verified road top speed | km/h | — | — | Open |
| Stopping distance from 100 km/h | m | — | — | Open |
Hop and flight
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| Ballistic hop apex without thrust after lift-off | m | — | — | Open Requires a separate run from a measured launch state. The R06 powered hop is listed below. |
| R06 takeoff speed | km/h | 60.00 | 59.99 | Reference R06 · 60 Historical R06, 60 km/h entry with a lift command. Clearance is measured from the lowest assembly point. |
| R06 airborne time | s | 2.555 | 2.291 | Reference R06 · 60 |
| R06 forward range | m | 43.21 | 38.26 | Reference R06 · 60 |
| R06 maximum assembly clearance | m | 5.41 | 5.17 | Reference R06 · 60 Historical R06, 60 km/h entry with a lift command. Clearance is measured from the lowest assembly point. |
| R06 datum rise from lift-off | m | 5.63 | 5.23 | Reference R06 · 60 |
| R06 maximum datum height above ground | m | 6.34 | 5.67 | Reference R06 · 60 |
| R06 mean forward speed in the air | km/h | 60.89 | 60.12 | Reference R06 · 60 |
| R06 downward speed at first contact | m/s | 3.91 | 10.06 | Reference R06 · 60 |
| R06 horizontal speed at first contact | km/h | 65.04 | 59.95 | Reference R06 · 60 |
| R11 Kickflip airborne time | s | 2.842 | 2.050 | Model R11 R11 Kickflip, 60 km/h entry. The trace after a possible obstacle overlap continues freely to the plane. |
| R11 Kickflip range | m | 47.76 | 34.22 | Model R11 |
| R11 Kickflip maximum assembly clearance | m | 4.70 | 4.18 | Model R11 |
| R11 Kickflip air used | kg | 257.84 | 96.36 | Model R11 |
| R11 Kickflip onboard DC energy | kWh | 0.006119 | 0.004404 | Model R11 |
| R11 Kickflip mean forward speed | km/h | 60.49 | 60.09 | Model R11 |
| R11 obstacles cleared in sequence from entry | 5/5 | 2/5 | Model R11 | |
| R11 Kickflip first-contact descent speed | m/s | 7.905 | 11.114 | Model R11 R11 Kickflip, 60 km/h entry. The trace after a possible obstacle overlap continues freely to the plane. |
| R11 Kickflip peak braking thrust shortfall | kN | 351.37 | 66.09 | Model R11 |
| Soft tyre touchdown target | m/s | ≤ 0.5 | ≤ 0.5 | Target R11 Both R11 runs miss the criterion. |
| R11 waypoint flight, reference route | 2/2 | 1/2 | Model R11 · waypoints Open scenario | |
| Reference waypoint-run duration | s | 1.800 | 1.961 | Model R11 · waypoints |
| Air used in the reference waypoint run | kg | 144.18 | 96.36 | Model R11 · waypoints |
| Onboard DC energy in the reference waypoint run | kWh | 0.003750 | 0.004085 | Model R11 · waypoints |
Costs and operation
| Parameter | Unit | V1 | V2 | Evidence and conditions |
|---|---|---|---|---|
| Prototype build cost | — | — | Open Requires the approved BOM, labour hours and quotes. | |
| Battery and BMS cost | — | — | Open R11 pack and supplier remain open. | |
| Vessels, fittings and charging equipment cost | — | — | Open Requires selected hardware and supplier quotes. | |
| Cost per refill cycle | — | — | Open Requires station energy, tariff and service costs. | |
| Operating cost per complete run | — | — | Open Requires electricity, air replenishment, labour and wear costs per run. | |
| Turnaround time between runs | min | — | — | Open Requires timed refilling, cooldown and inspection. |
| Vessel and valve service interval | cycles | — | — | Open Requires hardware datasheets and cycle inspections. |
