# C.400 P.2 and Roadster Rocket Two coupled RR-H1 step settings reach touchdown beyond the soft-contact threshold. Both stop at the damper speed domain. [Traces and protocol](../roadster-coupled/RESULTS_EN.md). ## RR-H1 short flight The level landing model reaches rest with 0.645 s airborne and 3.22 m to touchdown. The DEV25 five-metre case retains its own criteria. [Calculation and playback](../roadster-hop/RESULTS_EN.md). ## Roadster R5/C6I full charge The impulse budget gives a conditional 2.98 s and 44.7 m at 15 m/s with a 10% reserve. The retained run stops before touchdown. [Calculation and assumptions](../roadster-budget/RESULTS_EN.md). ## Full-fuel mission P1 Both R6E5 assemblies cover a modelled 4.51 km with 415.03 s airborne at a 54 km/h target. About 65 kg remains at rest, including 50 kg of usable reserve and 10 kg treated as unusable. Tesla evidence gives clip-clock intervals. Comparable Roadster mission range and reserves remain open. [Plots and results](../full-fuel/RESULTS_EN.md). ## R6E5 P0 virtual flight The new closed-loop 4,100 mm case has 50.690 s airborne. The mission was also integrated for 5,250 mm. Time-resolved proof for the original sortie remains open. [Trajectory, reactions and assumptions](../flight/flight_EN.html). TextToCAD evidence brief · 21 November 2026 · C400P2-RRK-20261121. C.400 P.2’s first free flight lasted 255 s on 14 May 1957, with Auguste Morel at Melun-Villaroche. The archival account describes controllable vertical flight and the use of a vertical Atar 101 D.V engine. Published mass values are 2,600 kg and 2,640 kg in the prose and table respectively. Reported full fuel is 680 L in prose and 500 kg in the table. The load for the first flight remains open. [AAMS, printed pp. 21–22](https://aams.museum/wp-content/uploads/revues/AAMS-Auguste-Morel-pilote-dessai-HS-n-3-Nov-2022.pdf#page=21) · [Air and Space Museum](https://www.museeairespace.fr/aller-plus-haut/collections/s-n-e-c-m-a-c-400-p-2-atar-volant/) Tesla unveiled the Next Gen Roadster on 15 October 2026. The public footage, the local R07 visualization and the local R5/C6I simulation have separate provenance and applicability. The R07 graphical export includes 246 selected shapes across eight systems. The principal local SC03 series records 0/4 accepted cycles. [Tesla Q3 report](https://assets-ir.tesla.com/tesla-contents/IR/TSLA-Q3-2026-Update.pdf) · [Evidence sources and SHA-256](sources.csv) | What was checked | Result and scope | | --- | --- | | C.400 static force | 2,900 kgf = 28.439 kN. Ideal static thrust-to-weight ratio 1.115 or 1.098 for the two published mass scenarios. The R6E1 static model gives 28.762 kN and 0.949 kg/s of fuel at its own inputs. | | C.400 earlier jet models | R6E3 single-finest-sector transverse force magnitude 219.907 N in solver coordinates. Actual body moment remains open. R6E4 A_FAST_FINE calculated jet peak 0.477°, axial change low −251.6 N. The jet and force half-response times are 3.624 and 7.818 ms. | | C.400 landing | R4 peak reaction divided by weight at 2 m/s, 2° initial tilt, I = 8,000 kg·m² is 3.32 and 3.41 for the two diagonals. The conditional comparison uses 3.0. | | C.400 current CAD | R6E5 is continuous from C3 to the collector in both saved configurations. Fourteen sections per master, approximately 452.389 mm² open area and 23 mm minimum fuel clearance. The upstream CAD result leaves flow validation open. | | Tesla Ramp | Selected air-window bounds 2.503–6.006 s on the clip clock. Initial ramp support and the subsequent ground roll are included as observations. | | Tesla Kickflip and Encore | Bounds 2.878–5.506 s and 2.544–5.756 s on each clip clock. The exact first-contact frames and physical clock remain open. | | Roadster independent B2 model | 2.26808 m of centre-of-mass rise, 23.26° at first contact on model clock 1.770 s. A skirt-rate veto ended the retained trace 29.5 ms thereafter. The 0.5 s hold remains open. | The four PTS markers bracket detachment and contact in the selected view. The lower bound subtracts the first visible gap from the last confirmed airborne marker. The upper bound subtracts the final selected pre-release support from confirmed subsequent surface motion. Both calculations use exact presentation ticks with a 1/24000 s time base. The release independently hashes the local Ramp clip. Kickflip and Encore retain the file identifiers and marker positions in the archived LLTV table. [PTS chart](pts_en.png) · [Frame markers](pts.csv) · [Maneuver matrix](maneuver_matrix.csv) The statics and checks of saved component cases run from the pinned inputs. A reconstruction of the 1957 trajectory needs synchronized mass, centre of mass, inertia, force and moment response, commands, environment, support response and flight trajectory. [Engineering charts](engineering_en.png) · [Machine-readable comparison](comparison.json) · [Acceptance matrix](acceptance_matrix.csv)