TextToCAD
C400P2-MEDIA-TZ-01 / 1.0
14.11.2026 · Русский · PDF

C400P2 / Media specification

01 / C.400 P.2 packaging and media production brief

C400P2-MEDIA-TZ-01 / 1.0 / 14 Nov 2026. Produce a coherent TextToCAD package explaining the historical craft, reconstruction revisions R1–R5, modeled joints and verification limits. Execution delivers texts, explanatory sheets, a 42 s animation, an 8:30 film with Russian narration, a catalogue and an offline RU/EN archive.

Requirement / itemContent
BasisLatest located TURBOLET chat brief: TURBOLET-MEDIA-TZ-01/1.0, 14 Nov 2026; local brief_content.json and the five latest chat turns.
SubjectSNECMA C.400 P.2, Atar Volant; target state: free flight in 1957, project designation F-ZWUZ. An experimental flying craft.
ScopePackaging, explanation, media recording and acceptance. Design changes, manufacturing drawings, physical tests and construction belong to a separate engineering release.
PublicationPrepare files and copy for open distribution. Track actual website/YouTube upload separately; never claim a public link exists before upload.

02 / Analysis of the TURBOLET source brief

The source defines 20 sections, 12 work packages, eight deliverable groups, nine sheets and 14 acceptance criteria. Its strength is a continuous source-to-CAD-to-voice/video-to-archive process. The latest inspected chat turn is marked interrupted; local HTML/PDF and structured brief files exist. This establishes the brief, not completion of the future film.

Requirement / itemContent
RetainRU/EN, three text lengths and FAQ, native views, short animation, desktop player, nine chapters/8:30, Russian voice, RU/EN subtitles, QA, archive and sources.
ReplaceReplace TURBOLET tail/surface, RD-9 and battery stories with the elevated pilot station, annular tank, Atar, mounts, four landing legs and touchdown roller.
Add4100/5250 diagonal alternatives, provenance of the 180 mm stroke, conditional R4 calculation, physical interface revision R4→R5, R5 spreadsheet rebuild and original-photo comparison. Ten sheets are required.
Correct transfer riskThe rotor and combustor internals are undeveloped in R5; the outer Combustor casing exists. Any new internal mechanism diagram is a separately sourced schematic derivative.
Freeze sequenceValidate a sample scene and voice before bulk production; complete the script before full recording. Preserve the source sequence; prepare the entry pages alongside editing.

TMR and LLTV inform this document through the analysis already present in the TURBOLET brief. This task does not claim a fresh full reading of those two chats. Their geometry, part counts, history and prices are not transferred.

03 / Two histories: the craft and the digital project

Requirement / itemContent
Historical narrativeAtar Volant explored vertical flight using jet lift and gas-jet control. Anchor event: first free flight on 14 May 1957 at Melun-Villaroche, Auguste Morel; H02, pp. 20–22.
Separate statesP.1, piloted P.2, P.3 and C.450 are distinct craft/stages. Label tethered tests, free flight and later museum display separately.
R1 — initial reconstructionFrom the task and available images to an overall information model and initial FeedBack package.
R2 — photo comparisonRefinement of landing gear, forks and pilot station; comparison with original imagery. Keep old shots as history, not current R5 views.
R3 — integrationCombined strut/fork/roller motion, mounts and routing, surrogate seating, access and rebuilding. Captions retain each test’s actual scope.
R4 — loads and upper jointsCalculation using 2600 kg and 180 mm stroke; modeled upper clevises, pins and backing plates. Two landing-gear variants.
R5 — connected interfacesLower stays, knee joints, forks, axles, pipe supports and roller; interface and motion checks. These changes answer the user’s reports of disconnected-looking mounts.
14 Nov 2026 — Spec_R515 systems, 473 CAD entries, descriptions, readiness and Russia/Texas cost scenarios. An R5 data supplement, not geometric revision R6.

The film distinguishes historical research from model development. Original flight dates do not date digital checks; new editing does not renew an old engineering calculation.

04 / Frozen baseline and readiness limits

Requirement / itemContent
R5 modelR5/C400P2_R5.FCStd and R5/C400P2_R5_5250.FCStd; STEP, BOM, reports and views. 473 geometric entries and 877 solids; CAD count is not a purchasing count.
Interfaces342 named checks per variant; scope covers gear and associated rings/shell/supports. Do not extend the result to all craft systems.
R5 motion0–180 mm, 0–360°; continuous envelopes and 228 states per leg ×4 legs ×2 variants =1824 transform checks, not whole-craft combinations. Roller arm 0–45° with between-sample bounds.
Different clearances43 mm is a scoped moving-to-fixed clearance; 0.25 mm is designed radial guide clearance; 9.825 mm is a lower bound for the touchdown mechanism. These are not one craft-wide minimum.
FeedBackPlan ac37b448-f324-456b-baad-0ad67e56a7a2: files generated. engineering/production_release remain unapproved. File completeness is not engineering approval.
Open in R5Fresh original-photo comparison, spreadsheet-driven parameter rebuild in R5, updated strength/CG and whole-assembly access validation. Latest table test: R4 at 4300 mm.
Existing catalogueSpec_R5: RU/EN HTML, XLSX, CSV, JSON and 33 price sources. Public values come from estimate_data.json rather than separate manual recalculation.

At execution start, verify inputs against this brief’s sources/input_manifest.json. Preserve R1–R5 and Spec_R5 archives; presentation changes use new derivative files.

05 / Configurations and evidence

Requirement / itemContent
CFG_1957_4100Main narrative: reconstructed 1957 state, 4100 mm support diagonal inferred from imagery. Label as a reconstruction choice.
CFG_1957_5250Alternative based on published 5250 mm dimension. Without established dimension endpoints, do not label it proven correct or wrong.
Diagonal ≠ trackShow A–C/B–D reference points and the actual parameter meaning. Do not convert diagonal into transverse track without confirmed support layout/contact points.
180 mm and 2600 kg2600 kg is the adopted calculation mass; 180 mm is assumed model travel, not an established factory stroke. Record compression, fork angle and variant for each motion shot.
RegistrationF-ZWUZ retains project identity. H02 also prints F-ZWWZ; record this discrepancy rather than silently correcting it or creating a new modeled aircraft.
Control schemeDistinguish main lift, jet-direction mechanism and tangential jets. Define axes and moment signs in model coordinates; verify historical terminology against H02.
StatusesDOCUMENTED: evidence; RECONSTRUCTED: inferred shape; ASSUMED: calculation assumption; OPEN: unavailable data. QA is separate: PASS/FAIL/NOT_RUN, date and scope.

W02 outputs configuration.json and claims.csv: claim_id, RU/EN wording, configuration, revision, CAD Name, evidence_id, precise locator, evidence status, units/conditions, image rights and action. An unknown may remain open when clearly disclosed.

06 / Plain explanation and the role of TextToCAD

Requirement / itemContent
80–120 words RU/ENIdentify the craft, purpose of vertical-jet experimentation, digital result and one open question: gear diagonal.
350–500 words RU/ENBottom to top: four legs and roller, load rings and engine, annular tank and bleed air, instruments, seat and two controls. Explain lift through jet direction and force.
900–1200 words RU/EN1950s research problem → free flight → systems → R1–R5 reconstruction → a mount correction → checks and limits → open materials.
FAQ: 10 questionsWhat is it? How does it lift? How is it controlled? Why the elevated pilot? What does the roller do? Why two gear sizes? What is verified? What precedes manufacturing? How does TextToCAD help? Why share?
Process exampleDisconnected-mount observation → interface faces/axes → backing plate, clevis and pin → corrected model → check → FeedBack. Use actual R4/R5 shots with matched cameras.
Why shareTechnical heritage, learning, independent review and better evidence. Invite specific contributions: gear dimension references, joint drawings, instrument identification or issues with CAD Name/view.

Do not revive the mistaken “production car” comparison: the user clarified “craft”. Compare with a production aircraft in purpose, documentation, verification and repeatability. CAD appearance does not establish speed, range, endurance or flight readiness.

07 / Future deliverables

Requirement / itemContent
D01 / PassportJSON/CSV and RU/EN overview: configurations, sources, history, limits, hashes and rights. One claim register across formats.
D02 / TextsThree lengths and 10 FAQs RU/EN; TXT/JSON/HTML and terminology glossary. Presentation text must not invent performance.
D03 / 10 sheets20 PNG at 2400×1800 and 20 editable SVG, two RU/EN PDF albums and gallery. Native raster views may be embedded; labels/callouts remain editable.
D04 / 42 secondsTwo RU/EN MP4 files, 1920×1080/24, 1008 frames each; offline player with six stages and deterministic time seeking.
D05 / Recording and editingRU/EN script, nine chapters/510 s, shot list, timeline.json, pronunciation glossary, voice sample and scene capture plan.
D06 / FilmOne 8:30 MP4 with Russian narration; Full HD/24; 12,240 frames. RU/EN SRT and VTT, WAV, utterances and reproducible editing.
D07 / Entry pointindex_RU.html/index_EN.html: video, chapters, sheets, history, catalogue, costs, sources, downloads and contacts. Desktop-first, with mobile accessibility.
D08 / HandoffBoth CAD/STEP variants, public FeedBack derivative, Spec_R5 data, instructions, QA, licences and ZIP. Redact personal metadata paths with a log; preserve original FeedBack separately. R1–R4 provide history.

English narration, PPTX and standalone social cards are optional extensions. The baseline includes a film thumbnail, RU/EN YouTube description, nine chapter timecodes and credits.

08 / Ten explanatory sheets

Requirement / itemContent
L01 / OverviewEntire craft and 8–12 callouts: pilot, engine, tank, four legs, jet lines and roller. Label revision/configuration.
L02 / Inside the shellRemoved shell: engine, rings, tank and equipment shelf. Show actual R5 casings; separate schematic Atar cycle.
L03 / Lift and controlDownward jet, upward thrust and weight; jet direction and tangential outlets. Each arrow has evidence and a defined axis.
L04 / Gear 4100/5250Matched scale/camera and floor datum, diagonal endpoints. Travel at 0/90/180 mm; fork steering distinct from wheel rotation.
L05 / Load pathEngine bearer → ring → upper joint/stay → damper → fork → axle → wheel. Show actual interfaces, pins and retention.
L06 / Lower jointsClose-ups of lower stay, knee, cuff, eyes, spacers and axles. Matched R4/R5 pair; contact geometry does not establish strength.
L07 / Touchdown rollerPivot, arm, fork and roller, 0–45°; meaning of pilot indication. Return spring, switch and circuit are open items.
L08 / Pilot stationOriginal and R5 in comparable views: seat, feet, panel, two controls, sightlines and clearance. Identify the R3 surrogate; broad pilot accommodation is unverified.
L09 / Routes and accessAnnular/feeder tanks, bleed air, eight pipe supports, penetrations and access zones. Identify incomplete oil and electrical systems.
L10 / Project statusR1→R5→Spec_R5; readiness across 15 systems, conditional calculations and unpriced entries. Link full catalogue and open questions.

For photo comparisons record camera_id, projection, scale and landmarks. With unknown lens data, claim a comparable view, not exact registration. Replace uncleared archival reproductions with links and original diagrams.

09 / CAD preparation and scene capture

Requirement / itemContent
Native derivativesCreate presentation/native and presentation/animation per variant. Preserve original_Name, system, units, axes, source hash and visibility map.
Engine cutawayENG has 17 outer-layout entries, including Combustor casing and centerbody. Rotor and combustor internals are undeveloped. Show casings/cycle; internal geometry is a separately sourced teaching model.
MotionStrut, fork, wheel and roller use independent groups and absolute-time poses. For cutaways preserve complete rotating parts; mask only stationary casing.
Matched viewsUse R5/qa/cameras.json for R4/R5 comparison; add camera_id for original/R5 comparisons. Do not rescale gear variants independently.
CaptureNative PNG without cursor/selection or service panels; deliberate UI capture only for the TextToCAD process case. Record FreeCAD version, viewport, camera, pose, layers and frames.
Export and disassemblyMeshes may be simplified with a log while retaining critical interfaces. An exploded illustration is not a validated removal path. Do not relabel the R3 engine-removal check as R5.
Outputcamera_manifest.json, motion_manifest.json, capture_log.json, source PNG/meshes and geometry log. Reopen both derivatives and compare critical parts against masters.

10 / Short animation and desktop player

Requirement / itemContent
00:00–00:06Whole C.400 P.2; 1957, elevated pilot, reconstruction label.
00:06–00:14Shell reveal, Atar casings, annular tank and qualitative airflow diagram.
00:14–00:20Jet, weight and thrust; schematic lift-off, not computed flight dynamics.
00:20–00:28Pilot station → jet control → tangential outlets. One action at a time; label hypotheses.
00:28–00:350–180 mm compression with fork/roller motion; both diagonals shown at unchanged scale.
00:35–00:42Actual R4/R5 joint close-up, return to full craft, TextToCAD role and catalogue link.

RU/EN exports: 1920×1080, 24 fps, exactly 1008 frames/42.000 s; H.264, yuv420p, faststart. Mechanism motion follows geometry; illustrative arrows do not constitute CFD or stability analysis.

Player: pause, six stages, timeline, 0.5×/1×, fullscreen; Space, arrows, Home/End, 1–6, F and visible focus. Support ?t=15&paused=1. Leave text-input keys alone. ready/setTime(t) reproduces identical poses; preserve language and pause state.

Priority: desktops at 1920×1080 and 1366×768; also test 390 px and 200%. Support reduced motion, deliberate audio start and MP4 fallback. If a local server is required, supply a launcher needing no environment installation; viewing must work offline.

11 / 8:30 film outline

Requirement / itemContent
01 / 00:00–00:40What is this craft? An engine lifting itself and its pilot. Show the whole machine and introduce control without a conventional wing.
02 / 00:40–01:30Atar Volant history, 1957 free flight and Auguste Morel. Distinguish tethered tests and museum photographs from the target state.
03 / 01:30–02:25Bottom-up systems: gear, structure, engine, tank, equipment and pilot station. External shell and internal view.
04 / 02:25–03:30Vertical Atar: air, combustion and exhaust. Separate actual R5 casing geometry from illustrative internal processes.
05 / 03:30–04:30Thrust and jet control; two controls, elevated pilot and touchdown roller. Do not imply an implemented autopilot.
06 / 04:30–05:30Gear: two diagonals, full adopted travel, forks, stays, pins and pipe supports. Explain the scoped clearance results.
07 / 05:30–06:30TextToCAD R1–R5 history: photo comparison → mount issue → connected joints → checks → FeedBack. Authentic before/after.
08 / 06:30–07:3015 systems; complete and open work; conditional R4 loads; priced scope in Russia/Texas, date and exclusions.
09 / 07:30–08:30Why share, what to download and how to contribute. Gear measurements, evidence, documentation and the next engineering stage. Credits and contacts.

510 s / 12,240 frames at 24 fps. Every shot records shot_id, in/out, camera_id, configuration, revision, pose, layers, action, RU/EN text, evidence_id, asset_id and cue_id. No chapter gaps; render long shots for the narration rather than mindlessly repeating the short loop.

12 / Voice recording and historical inserts

Requirement / itemContent
Pre-recording glossaryC.400 P.2, Atar Volant, SNECMA, TextToCAD, F-ZWUZ, Auguste Morel, Melun-Villaroche; 4100/5250 and 180 mm. Freeze spelling and spoken form before synthesis.
20–30 s sampleInclude difficult names, numbers and a long sentence. A reviewer listens and records issues; absent listening, status is NOT_LISTENED.
Russian trackWAV PCM 48 kHz; 120–145 words/minute in spoken portions, with viewing pauses. Measure utterance lengths; do not globally speed speech to fit 8:30.
Final audioAAC 48 kHz; internal targets −16 LUFS ±1.5 and true peak ≤−1 dBTP. Music optional. Credit synthetic narration; do not imitate historical people’s voices.
RU/EN subtitlesSRT/VTT; up to two lines, target 42 characters/line and 12–20 characters/s. Manually review terminology, timing and translated qualifications.
Complete listeningListen to the entire final encoded MP4. voice_review.json records reviewer, date, 100% coverage, issue timecodes and fixes. ASR does not replace listening.
Historical insertsDate/period, configuration, archive/author, URL/page and use terms. H02 restricts reproduction: absent permission, include a reference and original explanation instead of scans.
Voice correctionsUpdate WAV/MP4, SRT/VTT, script, timeline, player and manifest. Relisten to edited sections and check the complete final file.

13 / TextToCAD visual design

Use authentic full RU/EN logos, green #10B742, orange #EF4511, paper #FFF8F4, ink #130D0C and peach #FFC2B0. Montserrat 800–900 headings and Manrope body text; include font licences and identity provenance. Contacts: texttocad.org and texttocad@gmail.com.

Requirement / itemContent
ViewsCurrent native R5 geometry and palette. Bright internal groups may be used in derivatives with a legend; colour does not imply temperature or material.
2400×1800 sheetsStart with 65–80% image area, labels ≥30 px and headings ≥56 px. Preserve the full silhouette; use separate close-ups for details.
1920×1080 videoBody text ≥32 px, subtitles ≥42 px and 5% safe margins as targets. Brief on-screen attribution, full credits elsewhere. Test actual-screen readability.
DiagramsDistinguish air, fuel, hot exhaust, electrical links and force by arrow shape/colour. Routes cannot pass through closed walls without penetrations.
InterfaceBlack text on bright panels, horizontal table rules, help on demand. Translate user-facing labels; preserve CAD Names.
Two editionsCheck RU/EN separately: desktop, 390 px, 200%, light/dark and print. No missing images, incorrect callout targets or stale shots under new revision labels.

14 / Readiness and cost with explicit scope

Describe geometry, kinematics, historical evidence, calculations and production documentation separately; assign no overall percentage. Casings/interfaces exist; engine internals, damper hydraulics, oil, electrical systems, actuation and working restraint still require development.

R4 assumptions: small angles, three degrees of freedom, fully sprung mass; no thrust, drag, tyre compliance or unsprung masses. Adopted CG height 4.3965 m and Ixx=Iyy=8000 kg·m². R5 mounts have no new strength substantiation.

Requirement / itemContent
R4 calculation2600 kg, four legs, 180 mm travel, 60 mm sag and ζ=0.55 give k≈106.239 N/mm and c≈9140.94 N·s/m per leg. Equivalent linear model, not original oleopneumatic hardware data.
Landing casesLevel 2 m/s: 113.9 mm, n≈2.934. At 2° tilt, azimuth 0° and 2 m/s: n≈3.316/3.405 for 4100/5250, above assumed n=3. The level 4 m/s case reaches 180 mm. Here n is peak total support reaction / mg.
Spec_R5 scope473 rows: 376 manufacturing estimates, 43 catalogue analogues, 31 reference entries and 23 quote requests. 419 priced rows; 13 additional open functional packages are outside the total.
4100 / RussiaBase RUB 2,828,930; range RUB 1,451,030–6,561,550. Priced scope only, one set, dated 14 Nov 2026.
4100 / TexasBase USD 118,966; range USD 59,227–261,754. Local rates and US catalogues; this estimate does not establish local stock.
5250 / both currenciesRussia: base RUB 2,840,050, range 1,456,910–6,579,990. Texas: base USD 119,362, range 59,517–262,270. Alternatives must not be summed.

Excluded: operational engine, unpriced equipment, final assembly, design, tooling, tests and shipping; tax bases vary. Unique-part prices are scenario estimates, not statistical market means. Unknowns stay null/quote required, never zero. Review possible overlap between a complete wheel analogue and separately priced hub.

15 / W01–W04: baseline and sample

W01 / Freeze inputs

Release owner · Dependencies: —

Verify both R5 files, archives, Spec_R5 and reports; record hashes/versions.

Output: Input manifest, inventory, OPEN list.

Acceptance: 473/877 counts and sources match; preserve masters.

W02 / Resolve history and configurations

Editor / engineer · Dependencies: W01

Review 1957/museum states, diagonals, registration, control scheme and image rights.

Output: claims.csv, configuration.json, rights.csv.

Acceptance: Every disputed claim is resolved or explicitly OPEN.

W03 / Prepare text and voice sample

Writer / narrator · Dependencies: W02

Draft D02, nine-chapter outline and glossary; record 20–30 s.

Output: RU/EN texts, glossary, voice_sample, review.

Acceptance: Terms/sample checked; disclose any missing listening review.

W04 / Capture and check CAD sample

CAD / visualisation · Dependencies: W02

Create derivatives, overview, internal view and 5–10 s gear motion. Test an R5 spreadsheet parameter change on a copy and restore it.

Output: Native sample, camera/motion logs, R5 rebuild report.

Acceptance: No missing parts; test pertains to R5. Log failure and preserve master.

16 / W05–W08: images and recording

W05 / Produce ten sheets

Engineer / designer · Dependencies: W03, W04

Capture L01–L10, fresh original/R5 comparisons, matched R4/R5 and 4100/5250 cameras.

Output: D03, source-image manifest and photo comparison.

Acceptance: 20 PNG/SVG and two PDFs; image revisions match labels.

W06 / Build 42 s animation and player

Animator / developer · Dependencies: W04, W05

Six stages, independent mechanisms, setTime, RU/EN capture; review both variants throughout travel.

Output: D04, exporter and reference frames.

Acceptance: 1008 frames; deterministic poses, desktop UI and fallback work.

W07 / Freeze edit script

Director / editor · Dependencies: W03, W05, W06

Break 510 s into sourced shots, narration and actions; review insert rights.

Output: D05, shot list, timeline, narration text.

Acceptance: Nine gapless chapters; each shot has an asset or capture task.

W08 / Record narration and subtitles

Narrator / editor · Dependencies: W07

Record utterances, measure timing, create RU/EN SRT/VTT and listen.

Output: WAV, narration_manifest, subtitles, voice_review.

Acceptance: No name errors, clipped endings or repetitions; record actual listening coverage.

17 / W09–W12: release

W09 / Edit film

Editor / audio engineer · Dependencies: W05, W06, W07, W08

Capture missing long shots; combine narration, CAD, history, titles and audio.

Output: D06, edit project/script and media-info.

Acceptance: 12,240 frames/510 s; meaningful synchronization and clean full decode.

W10 / Assemble shell and data

Developer / release owner · Dependencies: W05, W06, W07

Build RU/EN shell, Spec_R5 catalogue and two models; attach final film after W09. Exclude partial obsolete FeedBack.

Output: D07/D08 draft, relative links, credits.

Acceptance: Offline viewing from a fresh folder; currencies/variants remain separate.

W11 / Accept media

Engineer / editor / listener · Dependencies: W09, W10

Run Q01–Q18, final listening, cost, image and interface checks; recheck fixes.

Output: acceptance.json, issues.csv, visual/audio reviews.

Acceptance: No blocking defects; NOT_RUN never becomes PASS without execution.

W12 / Seal and write package

Release owner · Dependencies: W11

Write new folder/ZIP and manifest/hashes; extract cleanly, open and verify. Copy to the original project folder and verify that copy.

Output: C400P2_MEDIA_R5_M1_YYYYMMDD, ZIP, receipt.

Acceptance: Handoff verified; old archives unchanged. External upload has separate status.

18 / Sequence and stage gates

Requirement / itemContent
G0 / After W01–W02Freeze inputs, historical configuration, both diagonals and claim rules. An unresolved dimension permits two explicitly labeled alternatives.
G1 / After W03–W04Review overview, internal view, 5–10 s movement and voice sample. Record R5 rebuild status. Only then scale production.
G2 / After W07The 510 s script has assets, rights and text; the workflow can proceed to full recording without approval rituals for each shot.
G3 / Rough cutFull duration assembled. Review meaning, movement, pilot layout, variant consistency and claims about undeveloped parts.
G4 / After W11Q01–Q18 have recorded outcomes. Engineering OPEN items disclosed; factual, rights, audio, visual geometry and file defects fixed.
G5 / After W12Package and backup checked after writing/extraction; hashes match. Local delivery complete, external publication tracked separately.

Dependencies: W01→W02→(W03 ∥ W04)→W05→W06→W07→W08→W09; W10 starts after W07, W11 waits for W09/W10, and W12 seals the release. Research, translation and shell work may run in parallel. Estimate dates after G1 using measured capture/render performance.

Log geometry defects by issue_id; master changes require a separate engineering revision. Editorial changes, cameras, colours and voice advance media revision M. Successful packaging does not close engineering gaps.

19 / Q01–Q09: facts and images

Requirement / itemContent
Q01 / BaselineBoth master hashes unchanged; 473 entries/877 solids, retained QA links and actual test dates.
Q02 / HistoryEvery external numeric claim has a claim_id/locator; no mixed 1957/museum/P.1/P.2 states.
Q03 / Diagonals4100/5250 shown at equal scale with dimension endpoints; variant labeled throughout.
Q04 / InterfacesL05/L06 show actual contacts, pins and retention; matched R4/R5 cameras without hidden joints.
Q05 / KinematicsBoth variants, 0–180 mm/0–360°, independent 0–45° roller; reference poses match native states. Collision scope recorded.
Q06 / Pilot/photosComparable original/R5 views; identify surrogate, pose and R3 test limits. Fresh photo comparison has its own report.
Q07 / R5 rebuildOn a copy change diagonal through the sheet to a chosen test value, recompute, save/reopen, verify and restore. If FAIL, withdraw the R5 rebuild claim and retain OPEN.
Q08 / Sheets/cutaway20 PNG +20 SVG +2 PDFs; trace every view, preserve silhouette. Clearly distinguish R5 casings from new schematic internals.
Q09 / Animation2×1008 frames/42 s; setTime and MP4 match at reference times; correct independent axes.

These are future execution criteria, not tests performed merely by drafting this brief. Retain original R5 report dates; record new results separately.

20 / Q10–Q18: recording and handoff

Requirement / itemContent
Q10 / Film1920×1080/24, 12,240 frames/510 s, nine chapters, clean full decode; inspect starts, ends and transitions.
Q11 / SynchronizationTarget cue/action error ≤2 frames after review; narrated part visible unless a transition is intentional.
Q12 / VoiceListen to 100% of final MP4; glossary verified; no open designation/stress/clipping errors. Store ASR separately.
Q13 / SubtitlesValid RU/EN SRT/VTT match final audio and avoid critical details; qualifications fully translated.
Q14 / InterfaceBoth languages at 1920/1366, 390 px, 200%, light/dark/print; links, chapters, keys, pause and MP4 fallback work.
Q15 / Costs15 systems/473 rows, 419 priced; both variants match Spec_R5; exclusions adjacent to totals; null is not zero.
Q16 / RightsEvery included image, font, voice, CAD and code asset has provenance and use terms. No blanket licence conceals uncertainty.
Q17 / Archive/copyClean extraction, offline opening, CRC and SHA-256; backup matches. No tokens, transcripts, temporary files or private absolute paths.
Q18 / Accurate statusPASS/FAIL/NOT_RUN with evidence, date and reviewer; complete FeedBack is not production approval; a brief is not a completed film.

Factual, visual geometry, pricing, rights, link and voice defects block final media release. An unresolved historical dimension or incomplete production design may remain when clearly labeled.

21 / Written package structure and version control

Future release: C400P2_MEDIA_R5_M1_YYYYMMDD. R5 identifies engineering input; M1 identifies media. This brief is C400P2-MEDIA-TZ-01/1.0. A voice revision advances M rather than relabeling R5 as R6.

Requirement / itemContent
index_RU/EN.htmlSingle entry point, status, film/chapters, sheets, catalogue, sources and contacts.
model/4100; model/5250FCStd/STEP for both alternatives, configuration, date, source and hash.
feedback; catalogPublic FeedBack/Spec_R5 copies: preserve data/status, sanitize metadata. New manifest, change log and references to source-package hashes.
guide; animation; exportsSVG/PNG/PDF; 42 s interactive; MP4, SRT/VTT, thumbnail and YouTube metadata.
storyboard; audio; buildScripts, timeline, cameras, WAV/utterances; build scripts with pinned dependencies, without node_modules.
sources; rights; qaPublic evidence/locators, rights, reports and open issues. Chat transcripts remain only in internal analysis.
README; manifest; SHA256RU/EN viewing/rebuild instructions; model→view→sheet→frame→video map; file hashes, ZIP hash in external receipt.

Write to a fresh CONCEPT/C400P2 folder. Copy delivery to the original “C.400 P.2, свободный полёт 1957 года (рег. F-ZWUZ)” project folder. Internal links are relative; test a fresh path with spaces/Cyrillic and then verify the backup hashes.

Preserve original native FeedBack unchanged internally. Its manifest contains personal absolute paths. Create an explicitly labeled public derivative: sanitize paths/service data, record redaction_log and new hashes. Do not label the modified manifest original. Apply the same rule to catalogue metadata.

Change chain: issue_id → CAD Name/claim → decision → revision → dependent image/text/audio rebuild → QA → new archive. Exclude working transcripts, obsolete FeedBack plans and service profiles from public ZIP.

22 / Traceability and first execution step

Requirement / itemContent
T01 / MethodTURBOLET/COMMUNICATION_BRIEF_20261114/brief_content.json, 1.0; source request 01a1db02-5179-7190-8f86-9ee6fe67d24c. Format transfer: deliverables, short-animation, film, voice, release.
C01 / Request historyR2 photo comparison; loaded gear; R4 180 mm/2600 kg calculation; real upper/lower interfaces; production, project purpose, sharing and TextToCAD questions.
C02 / Current baselineC400P2/R5/README.md, C400P2_chk.md, qa/gear_audit.json, full_motion.json, feedback.json; cameras and paired views.
C03 / CatalogueC400P2/Spec_R5/estimate_data.json, system_base.json, open_items.json, manifest.json and CSV/XLSX. All 15 systems are included in D07.
H01 / MuseumMusée de l’Air et de l’Espace, S.N.E.C.M.A C 400 P-2 ATAR Volant page: engine, vertical lift and gas-jet stabilization. URL in sources/public_sources.json.
H02 / AAMSPrendre l’Air, special issue 3, November 2022, Auguste Morel; pp. 20–22: flight, layout and pilot; p. 2: reproduction terms. Retain PDF link, do not automatically embed scans.
B01 / Brandingtexttocad-brand-workflow/SKILL.md and references/materials.md; authentic logos/fonts. Source hashes in input_manifest.

H01 — museum collection entry
Checked 14 Nov 2026; operating-principle context.

H02 — AAMS, Auguste Morel, November 2022
Checked 14 Nov 2026; printed pp.20–22, reproduction terms on p.2.