RR‑H1 valve lab
Five C6I profiles at 6 and 12 ms. Compare landings and select an interval to calculate the gas budget.
Lift-off, landing and rollout with a 10 mm clearance check, individual wheel loads and remaining air.
Static FreeCAD view. The timeline and plot still work.
Drag to orbit. Use the wheel or plus and minus keys to zoom. Space toggles playback and the arrow keys step through the trace.
Move the slider, click the plot or select an event.
Exhaust valves and gas supply
6 vs 12 ms comparison
| Metric | 6 ms | 12 ms |
|---|
| Branch | Command, % | Opening, % | Flow, kg/s | Thrust, kN | Δp, MPa | Jet mass, kg | Impulse, kN·s | Flow enthalpy, MJ |
|---|
The first five numeric columns show the current step. Jet mass, impulse and enthalpy are integrated over the selected interval.
Telemetry
Scenario Summary
Individual wheel reactions
| Wheel | Contact | Peak, kN | Rest, kN |
|---|
Evidence and materials
C3 to collector · Ø24 mm passage · 23 mm tank clearance. The P1 route is compressed 160× in the scene. Charts, time and telemetry use the original scales.
Source trace · Scene FCStd · RR-H1 landing report · PDF report · Comparative dossier · 3D assembly atlas · Cost calculator · Start and models
