# XJ314 R11 · F/R blockage in the 1954 Hucknall reconstruction **TEXTTOCAD · long-duration 6DOF comparison** [3D comparison at ×20](flight/index_en.html) · [Русский](flight/index.html) · [Plots](comparison_en.png) · [Original reconstruction](../historical/README_EN.md) Choose a case and press Play. At ×20 the full ten-minute run takes about 30 seconds. The event controls, plot and touchdown jump help inspect the quarter-second input independently of playback speed. The blue aircraft shows the nominal pose at the same time. Both assemblies use the native CAD scale. ## Results The first pulse starts at **2:35.450**, as the lateral movement begins. The landing pulse starts at **9:52.510**, 0.320 s before first touchdown in the nominal run. Height and roll differences during the lateral movement compare states at the same time. | P1 pressure history | Peak CG drop during lateral motion | Peak roll difference during lateral motion | First contact after the descent pulse | CG speed downward at first contact | | --- | ---: | ---: | ---: | ---: | | Nominal | 0 mm | 0° | 9:52.830 | 0.01265 m/s | | Clean bleed-source decay | 14.90 mm | 0.000052° | 9:52.670 | 0.01554 m/s | | Full F/R blockage | 18.31 mm | 0.000067° | 9:52.625 | 0.02074 m/s | | Repeated F/R blockage | 15.91 mm | 0.000057° | 9:52.650 | 0.01644 m/s | The lateral-motion pulse preserves the first-touchdown time on the 5 ms grid. Comparing at the same times with the clean profile gives up to **3.83 mm** of additional drop for full blockage and **1.16 mm** for repeated blockage. The plotted and numerical roll readouts show the small differences at native scale. With the descent pulse, full blockage advances touchdown by **205 ms** relative to nominal and **45 ms** relative to clean decay. Repeated blockage advances it by **180 ms** and **20 ms**, respectively. All three contacts occur within the P1 pressure window. All four supports carry load through the last second of every run. Halving the maximum full-blockage integration step from 2.5 to 1.25 ms preserved the first-touchdown time on the 5 ms evaluation grid. [Full metrics](calculation/metrics.json) ## Source data The base is the long XJ314 R11 Hucknall reconstruction, including movement over the pad, the H190 fuel burn scenario and return to four compliant wheel supports. The nominal run lasts 600 s, with 590.215 s between all wheels clear and first touchdown. [Nominal metrics](../historical/calculation/metrics.json) · [Native anchors and axes](../cad/anchors.json) The inputs are clean bleed-source decay, full port and screen blockage, and repeated screen blockage at 0→95→0→95%. The curves use the P1 common-collector pressure over 250 ms, at 64 cells per line with the exact-zero area rule. They are applied in separate runs at the start of lateral motion and during descent. The clean case provides the effect of source decay by itself. F and R give identical common-collector pressure histories. [P1 report](../../R11_P1_RUNS/20261121_r11_transient_blockage_01/ПРОТОКОЛ_P1_НАГРЕВ_И_ЗАСОРЕНИЕ_F_R.md) · [Source trace audit](../qa/pressure_sources.json) ## Coupling The factor η divides the current gauge pressure above 100 kPa by its pre-event value. It scales the 2,918/36,031 control thrust share and the three realized mathematical control moments. Core thrust, variable mass and the compliant wheels follow the long nominal model. Individual nozzle allocation and asymmetric nozzle pressures remain open. After 250 ms an assumed exponential model returns η toward one with a 0.30 s time constant. Engine thrust response, the transfer to individual reaction nozzles and actual recovery require measurements. The results apply to the stated numerical reconstruction and its coupling assumptions. ## Files [Scenarios and trajectories](calculation/flight_fr.json) · [Full metrics](calculation/metrics.json) · [Reproduction](calculation/README.md) · [Telemetry verification](calculation/verification.json) · [Independent audit](qa/independent.json) · [3D playback verification](flight/checks/browser.json)