TEXTTOCADXJ314 · ROADSTER · 21 NOV 2026

Test programme economics

Estimate the full cost of an attempt, fleet and production programme. Missing inputs or denominators are marked OPEN.

Summary

Programme budget

Cost itemAmount

Outcomes and duration

MetricValue

Edit rates and budget inputs

Formulas, assumptions and sources

Programme = development + vehicles × (unit production + initial fill + annual cost × term) + attempts × variable cost.

Cost per attempt = programme cost / attempts. Cost per expected success = programme cost / (attempts × assumed success rate). Cost per airborne second = cost per attempt / interval midpoint. The upper and lower durations give the cost range. Results are rounded to two decimal places after calculation.