E‑26 / R12J / 23.11.2026
VEKTOR engineering atlas
The VEKTOR E‑26 R12J with its new driver’s seat. The atlas covers the assembly, cockpit, suspension and AIR R01 service. Each calculation identifies its source revision.


Contents 24 sheets
E‑26 / 0101 Assembly overview
Horizontal overview of the E‑26. The transparent body reveals the main assemblies.
E‑26 / 0202 Front three-quarter view
Front lighting, wheel arches and packaging visible through the shell.
E‑26 / 0303 Rear three-quarter view
Rear panels, fan surrounds and the positions of the acceleration nozzles.
E‑26 / 0404 Cockpit and driver’s seat
A one-piece bucket with thigh and shoulder support, four pads and four harness slots. Two longitudinal adapters sit on the existing cockpit crossmembers.
Nominal CAD check: 240 pairs with cockpit and assembly parts, 0 solid interferences. Driver fit, harness routing and mount strength are pending.
Source evidence · R12J check · References and design
E‑26 / 0505 Chassis reference structure
Frame and mounts in chassis context. Four rear nozzles and two fans remain visible.
CAD names · Acceleration_A1–A4 · FanHub_1 · FanHub_2
E‑26 / 0606 Underbody plan
Underbody perimeter, skirt, wheel positions and frame geometry in an underside projection.
E‑26 / 0707 Open chassis
The main systems are isolated for comparison. Body panels are hidden for this view.
E‑26 / 0808 Frame and base mounts
First layer of the assembly sequence. Sheets 08–14 share the same camera.
E‑26 / 0909 Vessels and mounts
Vessels and mounts are added to the frame. Colours and transparency come from the FCStd.
E‑26 / 1010 Drivetrain and suspension
This layer adds electric drive, rockers, pushrods and struts. R12I details appear on sheets 18 and 19.
E‑26 / 1111 Wheels and brakes
Wheels and brake components are added, showing their placement in the assembly.
E‑26 / 1212 Air and electrical systems
AIR R01, downforce ducts, cooling and electric components are added at the same scale.
E‑26 / 1313 Cockpit and controls
Seat, steering and pedals are added. Sheet 04 provides the cockpit close-up.
E‑26 / 1414 Body and lighting
Production-intent panels and lighting return at the same camera as the preceding layers.
E‑26 / 1515 Rear transverse section
Plane X = −1675 mm. The view keeps X ≥ −1675 mm. Orange contours are taken from the BRep at the cut.
E‑26 / 1616 Front axle transverse section
Plane X = +1200 mm. The view keeps X ≤ +1200 mm, showing the frame, front suspension and wheels.
E‑26 / 1717 Routing and drive systems from above
The overhead view locates the ducts, cooling lines, batteries and electric drive in their spatial context.
E‑26 / 1818 Rear Ø28 joint
Close-up of the Ø28 lower pin and its retaining ring. The pushrod view locates the joint in the assembly.
E‑26 / 1919 Chassis load transfer
Rear-left strut and rocker reactions reach the frame through the longitudinal tie and diagonal braces.
In the R12I beam model, chord axial load reaches 209.2 kN. The critical brace exceeds the assumed yield reference. Status HOLD.
Source evidence · Structural screen
E‑26 / 2020 R12E flight and first contact
Historical, conditional R12E flight at 100 km/h. Markers identify lift-off, apex and modeled touchdown.
The trajectory and numerical values come from the R12E calculation through first contact.
Source evidence · R12E · JSON · Trace CSV
E‑26 / 2121 Landing, strength and clearances
R12I landing from first contact to stable support, with modeled loads, stopping and open items.
| Metric | R12I screen |
|---|---|
| Nominal stop | 7.16 s / 107.65 m |
| Stop at grip 0.35 | 10.01 s / 146.76 m |
| Nominal touchdown mass | 1508.4 kg |
| Peak axial strut load | 168.8 kN |
| Nominal rear joint clearance | 2.40 mm |
| Clearance with tolerances and deflection | −0.018 mm |
| Strength and rig qualification | HOLD |
Combining independent worst values gives −1.504 mm of clearance. Modeled residual ring engagement under the assumed vibration is 0.82 mm. Rig qualification remains open.
Source evidence · Landing · Strength · Clearance · Vibration
E‑26 / 2222 Longitudinal section
Plane Y = 0 mm. The view keeps Y ≥ 0 mm and shows the central floor and cabin package.
E‑26 / 2323 First open in FreeCAD
R12J as first opened in FreeCAD, before any camera or visibility commands.
Source evidence · R12J · PID 11244 · FreeCAD 1.1.4 · TextToCADWorkbench
E‑26 / 2424 AIR R01 service interfaces
Cover, duct and access inserts in the installed geometry, with both filter cartridges shown separately. Removal evidence is from R12E.
Historical R12E check. The lower clearance bound for complete extraction was 0.541 mm for the fine cartridge and 0.526 mm for the coarse one. Twenty tool operations were checked geometrically.
Source evidence · AIR R01 · R12E



























