R13 · Unified configuration
Each R13 branch carries one mass, centre of mass and gas state throughout. Structural status is HOLD. Earlier revisions remain below with their original conditions.

From acceleration to stable stop
| Scenario | 0–100, s | Lift-off | Height, m | Airborne, s | From touchdown or start of road braking phase to stable stop, s / m | Frame, MPa |
|---|---|---|---|---|---|---|
| EV sprint, nominal | 2.808 | Yes | 0.597 | 1.428 | 7.206 / 105.82 | 3 434 |
| Rear boost, 100% | 1.488 | No | 0.000 | 0.000 | 7.258 / 107.65 | 440 |
| EV sprint, landing μ = 0.35 | 2.808 | Yes | 0.597 | 1.428 | 10.022 / 144.09 | 3 434 |
| EV sprint, vertical supply 70% | 2.808 | No | 0.000 | 0.000 | 7.261 / 107.65 | 453 |
| Rear boost, 70% | 1.660 | No | 0.000 | 0.000 | 7.259 / 107.65 | 442 |
| −20 kg, tilt and softer tires | 2.785 | Yes | 0.685 | 1.497 | 7.207 / 105.70 | 3 412 |
| +20 kg, tilt and softer tires | 2.831 | Yes | 0.517 | 1.361 | 7.215 / 105.93 | 2 987 |
Mass and axes
The ledger combines R11P allocations with a verified steel increment of 67.60 kg and other CAD-derived deltas using assumed densities. 55.37 kg in the legacy dry ledger remains unallocated. Some group Z positions are estimates. Dimensions, seat and load path are inherited from R12J. Native geometry was checked after saving.
Mission model
200 L and 99.63 kg are the inherited model fill. The flight uses horizontal drag and fixed attitude. The nominal run transfers velocities, mass, CG and gas inventory into a four-corner contact solver. Two sensitivity cases impose touchdown tilt. Active descent and takeoff suspension transitions remain open.
Structural limits
Nominal touchdown exceeds both V01 vertical-speed limits. The linear frame screen of 3.43 GPa exceeds the 355 MPa yield reference. The screened road-only branches also exceed 355 MPa. The positive rear pivot clearance requires a qualified load path. Damper maps, welds and bench loads remain open.
