TextToCADReport · C.400 P.2 / Roadster RocketRU

Vertical flight and an airborne vehicle manoeuvre

Comparison of the C400 P2 and Roadster Rocket

The C.400 P.2 completed a piloted free flight of 4 min 15 s. Roadster Rocket footage records short airborne episodes after movement on wheels or release from a ramp. Compare initial support, the direction of forces, release, attitude, first contact and the end of each case.

C.400 P.2 R6E5
C.400 P.2 · R6E5 4100
Roadster R07
Roadster · CAD R07
First free flight255 sAAMS · 14 May 1957
Fuel-volume clearance23 mmR6E5 4100 and 5250
Local DEV25 series0 / 4Digital 5 m attempts

RR-H1 coupled simulation

The coupled RR-H1 reaches first contact. The finer run touches down at 1.44 m/s downward, with -2.60° roll and 0.63° pitch. It retains 207.91 kg at solver termination. Rest and its reserve require a run that passes the contact gates.

QuantityCoarse stepFiner step
Gas step, ms126
Airborne time, s0.5390.488
Horizontal displacement to contact, m2.702.44
First wheelRLRR
Downward contact speed, m/s1.631.44
Roll at contact, °0.76-2.60
Pitch at contact, °1.490.63
Air at solver end, kg206.73207.91
10% reserve, kg23.5323.53
TerminationDamper rod speed exceeded the domainDamper rod speed exceeded the domain

Coupled run animation · Results and protocol

Roadster short flight RR-H1

The level-landing model gives 0.645 s airborne, 3.22 m to touchdown and about 15 cm peak clearance. Displacement to rest is 9.53 m. Remaining air is 183.97 kg nominal and 171.00 kg adverse against a 23.53 kg reserve. Roll, pitch and individual support dynamics remain outside the model.

Animation · Calculation and assumptions

Roadster short flight RR-H1

Roadster landing reserve

The Roadster R5/C6I model starts with 235.27 kg of dry air and protects 23.53 kg by mass. At a 54 km/h speed cap, the conditional impulse bound is 2.98 s and 44.7 m airborne. It allows 54 km/h at release and assumes equal endpoint vertical velocities.

ScenarioAirborneDisplacementFluid at rest
R6E5 P1 4100 mm415.03 s4.511 km to rest65.06 kg kerosene
R6E5 P1 5250 mm415.03 s4.511 km to rest65.07 kg kerosene
Roadster R5/C6I≤2.98 s impulse bound≤44.7 m airborneLanding result unknown

AIR_NOMINAL records 1.33 s and 1.05 m from release to its last sample. The system contains 134.68 kg at solver stop. Last-sample moment-balanced thrust is 25.52 kN against 33.80 kN weight. Post-landing inventory and displacement to rest remain unknown.

Roadster landing reserve

Calculation and assumptions · JSON · CSV

Full-fuel mission P1

With 500 kg of fuel, both assemblies cover 4.51 km and spend 6 min 55 s airborne. Straight-leg speed is 54 km/h. Braking starts with 148 kg on board. About 83 kg is used from braking to rest, leaving about 65 kg. The scenario holds 50 kg of usable reserve and treats 10 kg as unusable.

Quantity4100 mm5250 mm
Airborne, s415.03415.03
Displacement at rest, km4.5114.511
Gross fuel at rest, kg65.0665.07
Displacement and remaining fuel over time

The higher fuel-flow and drag run gives 3.88 km and 6 min 13 s with reserve retained. Physical range depends on fuel flow, drag and the location of the drag centre.

Range and fuel reserve describe the C.400 P.2 simulation. Roadster evidence covers Tesla clip-clock intervals and separate DEV25 trials. A comparable range mission and its fuel budget remain open.

Player for both assemblies · MP4 · Assumptions · Results and checks

10× playback. The 43.4 s video covers 7 min 14 s of simulated time and shows both assemblies together.

R6E5 virtual flight

P0 runs from static supports to rest after touchdown. Compare phase definitions and support conditions. The historical sortie lasted 255 s. Tesla clips supply clip-clock bounds.

Diagonal, mm41005250
Airborne, s50.69050.636
Clearance, m1.8011.801
Transfer, m4.1024.093
COM descent speed at touch, m/s0.0770.080
Rest time, s61.44061.385

Steps of 2.5 and 5 ms at a 20 ms controller period. 2 of 6 sensitivity cases meet the numerical gates.

Mission playback and wheel reactions · Assumptions register · Plots

Configurations and scope

Auguste Morel piloted the C.400 P.2 on its first free flight at Melun-Villaroche on 14 May 1957. The rig used a vertically installed Atar 101 D.V. AAMS lists about seven to eight minutes of endurance. The narrative lists 680 L for a full fill and the table lists 500 kg of fuel. Fuel use during that flight is open.

RecordWhat it establishes
C.400 P.2 / historical airframeThe museum record describes a wingless test vehicle with gas jet control. AAMS records the piloted flight and gives its duration.
C.400 P.2 / R6E5Native 4,100 and 5,250 mm chassis assemblies establish reconstruction geometry, including the C3-to-collector duct.
Tesla / 15 October 2026 revealTesla’s quarterly update establishes the reveal date. The official selected clips establish observable events in each edit.
Roadster / R07 and R5/C6IR07 is the local layout and costing CAD. R5/C6I and DEV25 are separate digital trials with their own criteria.

Forces on the support and in the air

PrincipleEngineering result and verification
C.400 P.2 · vertical thrustAtar 101 D.V. carries weight after release. Gas jet control uses compressor bleed. Compare vertical force and independent control moments by axis.
Roadster · ramp contactElectric drive provides the run-up. Tesla shows fan-assisted downforce and wheel contact on the ramp. Check contact phase, normal reaction and the release event.
Roadster · after releaseTesla attributes attitude changes to gas impulses. Isolating their contribution would need time-aligned masses, forces, moments and footage. The video markers establish events.

AAMS historical diagram · Tesla Roadster event, The Ramp and Kickflip chapters · Tesla Roadster Event

AAMS, pp. 21–22 and 36 · Musée de l’Air et de l’Espace · Tesla Q3 2026, p. 4

Motion phases and video markers

Use one visible shot per clip. Four presentation timestamps mark the last selected supported frame, the first visible gap, the last certainly airborne frame and confirmed rolling. The lower bound is t₃ − t₂ and the upper bound is t₄ − t₁. Rolling bounds contact when the instant is obscured.

EpisodeObservation and value
C.400 P.2Vertical takeoff, controlled motion and return in the test flight. 255 s is the reported sortie duration. Separate takeoff, manoeuvre and first-contact times remain open.
Ramp 2.503–6.006 s PTSThe ramp is part of the entry condition. After release, footage shows an attitude change and later rolling.
Kickflip 2.878–5.506 s PTSInversion is visible during the crossing. The angle, axis and exact first contact need separate measurement.
Encore 2.544–5.756 s PTSRelease and attitude change are visible. Glare and the cloud limit observation of the first contact.

RR-PTS · Tesla primary clips · preserved LLTV package frame markers

Tesla clip-clock bounds

Intervals in seconds on the edited clip clock. Physical airborne duration remains open.

07 s

Clip-clock interval

  • Before release
  • First visible gap
  • Last airborne frame
  • Confirmed rolling
Open source clip

Forces geometry and digital checks

Atar reference thrust of 28.439 kN and weight of 25.497 kN at 2,600 kg give a static ratio of 1.115. The 2,640 kg table value gives about 1.098. A fully resolved motion model needs time histories for force, control, mass, inertia, centre of mass and support contact. A closed-loop R6E5 P0 mission was simulated. Time histories for the historical flight remain open.

CheckVerified result
R6E5 4100 and 5250The C3-to-collector passage was checked against native BRep. Each assembly has 14 sections, an open area of 452.389 mm² and 23 mm clearance to the fuel volume in the saved pose.
R6E1 and R6E4The steady cycle and CFD are tied to their input assumptions. The R6E4 response is for the earlier numerical domain. It does not measure the hardware response after R6E5.
Roadster R5/C6I DEV25The principal 5 m series accepted 0 of 4 cases. In a separate 2 m attempt, centre-of-mass rise was 2.268 m and first contact occurred at 1.770 s. The trace stopped 29.5 ms after contact and lacks the 0.5 s dwell.
Forces geometry and digital checks

Interactive 3D · Current assembly sections

P2-R6E5 · P2-R6E4 · RR-DEV25 · reproducible static and PTS checks

Resources and programme economics

A comparable scenario aligns fleet size, attempts, time horizon, currency, tax basis and work scope. Track initial loading, event consumption and refill separately. Published C.400 P.2 fuel figures belong in the configuration record. Actual usage for the first sortie remains open.

MetricCalculation scope
Programme costDevelopment + fleet production + fixed costs + attempt costs. Missing prices and unconfirmed rates remain editable inputs.
Attempt and accepted caseAttempt cost divides programme cost by attempts. Expected accepted-case cost uses a scenario success fraction. A zero fraction leaves the result blank.
Airborne secondA result is available when the chosen phase has a known physical duration. Tesla clips supply PTS bounds. The cost output remains blank for an unknown physical duration.
Dated estimatesThe 14 Nov 2026 C.400 Spec R5 covers the priced portion of manufacture with key quotes open. The 21 Nov 2026 R07 estimate is a local commercial scenario for ten units. Each estimate retains its own scope.

Figures with different scopes. Spec R5 for the 4,100 mm variant prices the assessed manufacturing portion at RUB 2,828,930 in Russia and USD 118,966 in Texas. In the local ten-unit R07 commercial scenario the target unit prices including tax are RUB 817,887,019, USD 11,748,623 and EUR 11,158,009 for the respective markets.

Calculator · Formula workbook

Spec R5 · R07 · formula workbook and calculator use common inputs

Reproduction and acceptance

The LLTV method supplies the sequence from configuration records to publication evidence. For each revision, pin inputs and hashes, log the visible events and separate calculation conditions. Repeat the PTS and static reference checks. Regenerate dependent views and narration when an input changes.

MaterialVerification
EvidenceRead evidence/comparison.json and evidence/sources.csv. Check historical documents, native geometry, footage and simulation in their respective scope. Each numerical statement has a source locator.
Calculator and workbookChange fleet size and check allocated development. An unknown physical duration leaves the price per airborne second blank. Rates and currencies keep their date.
Interactive 3DSelect the assembly and a system, toggle isolation and explosion, rotate and reset. Exploded offsets explain assembly content. Native geometry is tied to a file hash.
Publication packageHTML, PDF and DOCX point to the same records. The overview and engineering walkthrough have their own narration and subtitles. Check deliverables against the package manifest.

Method source: Comparative Materials for LLTV and Roadster Rocket, Analyse the LLTV Project chat.