Technical and economic parameters
Dimensions, masses, working fluid, flight, landing, turnaround and costs.
R6E5 pairs are ordered 4100 / 5250 mm. RR-H1 pairs are ordered 6 / 12 ms. Exceptions are noted in their rows.
A dash means this column has no separate figure. 'Open' identifies parameters requiring confirmation. Estimates retain their source dates.
No matching rows.
| Parameter / unit | C.400 P.2 · archive | C.400 P.2 · R6E5 | Roadster · R5/C6I |
|---|---|---|---|
| Layout and dimensions | |||
| Propulsion architecture | Vertical Atar 101 D.V jet Historical A | One turbojet with C3 bleed jet control CAD C | Cold-gas nozzles, dry air |
| Aircraft heightmSee the next row for the full selected CAD envelope. | 8.34 Historical A | — | — |
| Selected 3D envelope X × Y × ZmC.400 includes the probe and projecting parts. Roadster is the saved R07 mesh, while dynamics uses C6I. | — | 4.840 × 4.342 × 8.740 / 5.999 × 5.492 × 8.740 CAD M | 4.605 × 2.164 × 2.100 CAD M |
| Fairing diameter × heightm | 1.50 × 4.295 Historical A | — | — |
| Gear diagonalmm | 5 250 Historical A | 4 100 / 5 250 CAD G | See the vehicle envelope for the wheeled chassis N/A |
| Pilot positions | 1 Historical A | 1 Model input S | RR-H1 payload is set in the model Open D |
| Wheel count | 4 Historical A | 4 CAD G | 4 |
| Mass, kerosene and air | |||
| Mass without working fluidkgP0/P1 dry mass excludes the pilot. C6I is the equipped local model without gas. | 2 150 Historical A | 2 000 Model input S | 3 311.93 Model input R |
| Pilot or additional payload masskg | 100 Historical A | 100 Model input S | 0 additional load |
| Fully charged initial masskgThe archival masses and listed components do not reconcile. P1 uses a 2,600 kg model input balance. | 2,600 in narrative / 2,640 in table Historical A | 2 600 | 3 547.20 Model input R |
| Full kerosene chargekg | 500 Historical A | 500 Model input P | Working fluid is dry air N/A |
| Liquid fuel volume and tank layout | 680 L · annular tank in the drawing Historical A | Annular CAD envelope · usable volume open | C6I uses no kerosene tank N/A |
| Full dry air chargekg | Kerosene turbojet provides lift N/A | C3 bleed supplies controls N/A | 235.27 Model input R |
| Main reservoirs T400 and T200LEffective model volumes, separate from a certified vessel capacity. | — | No stored-air propulsion charge specified N/A | 399.89 / 199.94 Model input G2 |
| Total effective reservoir volumeL | — | — | 599.83 Derived G2 |
| Nominal pressures T400 / T200bar abs.Thermodynamic model inputs. Prepared states in the run differ. | — | — | 300.0 / 689.5 Model input G2 |
| Certified vessel pressure and life | — | — | No verified specification Open G2 |
| Gas scenario initial temperature°C | — | — | 20 Model input R |
| Thrust and control | |||
| Reference Atar thrustkN | ≈28.44 (2,900 kgf) Historical A | 28.44 Model input S | — |
| Thrust-to-weight at full mass | 1.11 Historical A | 1.115 | — |
| Atar engine masskg | 915 Historical A | — | — |
| Atar length × diametermm | 3667 × 920 Historical A | — | — |
| Atar shaft speedrpm | 8300 Historical A | — | — |
| Reference Atar airflowkg/s | 52 Historical A | — | — |
| Turbine inlet temperature°C | 870 Historical A | — | — |
| Compressor / turbine stages | 7 / 1 Historical A | — | — |
| C3 bore and fuel-volume clearancemmClearance in the verified pose. Flow and thermal deformation are separate questions. | — | Ø24 / 23 CAD C | — |
| Acceleration and flight | |||
| Horizontal speedkm/hRR-H1 begins at the specified speed. Ground acceleration time is unverified. | 60 · published maximum Historical A | 54 · P1 target Model input P | 18 · RR-H1 initial speed |
| Peak longitudinal acceleration during accelerationm/s²Change in horizontal speed between consecutive 0.1 s samples in the P1 acceleration phase. | No acceleration telemetry identified Open A | 0.499 / 0.499 | RR-H1 does not simulate acceleration from zero Open D |
| Sampled P1 acceleration phase durationsFrom 0 to 14.99 m/s between the phase's first and last samples. | — | 56.2 Derived TR | — |
| Airborne time to first contacts | 255 · first free flight Historical A | 415.03 / 415.03 Simulation P | 0.628 / 0.613 |
| Endurance or conditional upper boundsThe C6I bound with equal vertical endpoint speeds and a 10% air reserve is a budget result. | 420–480 · published endurance Historical A | — | ≤2.98 · impulse budget Simulation R |
| Horizontal displacement at restmRR-H1 displacement includes ground movement. | — | 4 511.4 / 4 511.4 Simulation P | 11.88 / 11.64 |
| Height in the stated scenariomP1 and RR-H1 use peak lowest-wheel clearance. Historical altitude uses a different reference. | up to 600 · reported altitude Historical A | 5.001 / 5.001 Simulation P | 0.149 / 0.112 |
| Landing and reserve | |||
| Downward COM speed at first contactm/s | — | 0.089 / 0.090 Simulation P | 0.367 / 0.335 |
| Settled rest from starts | — | 424.95 / 424.95 Simulation P | 4.344 / 4.308 |
| Minimum rigid-part ground clearancemm | — | P1 uses wheel contacts, without a separate hard-part check Open P | 18.78 / 34.13 |
| Acceptance of five valve profiles | — | — | 10 of 10 · 5 profiles at 6 and 12 ms Simulation V |
| Required reserve at restkg | — | 60 · 50 usable + 10 unusable Model input P | 23.53 Model input R |
| Working fluid at restkgC.400 uses kerosene and Roadster uses air. | — | 65.06 / 65.07 Simulation P | 180.68 / 174.96 |
| Long route with early landing at waypoint 3 | — | Rest at 342.30 s · 145.33 kg at rest Simulation W | — |
| XY error at rest, long routemm | — | 0.66 / 0.77 Simulation W | — |
| Refilling and turnaround | |||
| Working fluid used through restkg | — | 434.94 / 434.93 Simulation P | 54.59 / 60.31 |
| Actual refill rateL/min or kg/min | Fuel dispenser flow is unreported Open A | Ground refuelling rate is open Open P | Station flow and cooling at the working pressure difference are unverified |
| Actual turnaround timemin | Published endurance refers to flight Open A | No measured ground cycle Open P | Actual duration and station profile are open Open G2 |
| Reversible work for full reservoir fillkWhIsothermal lower bound from ambient at 20 °C, T400 and T200 only. Wall energy is separate. | — | — | 26.81 Derived G2 |
| Reversible AIR_NOMINAL top-up workkWhDifferent C6I trace from the RR-H1 landing case. | — | — | 13.39 Derived G2 |
| Ideal minimum duration at 15 kWminReversible work divided by illustrative constant power. Actual station, losses, cooling and flow limits are excluded. | — | — | 107.2 Derived G2 |
| Costs and estimate scope | |||
| Base unit estimate, RussiaRUB millionC.400 is the 14 Nov 2026 R5 geometry estimate. Roadster is the 21 Nov 2026 R07 commercial model. Scope differs. | — | 2.829 / 2.840 Estimate E | 302.05 Estimate E |
| Base unit estimate, TexasUSD thousandMarkets and FX are dated inputs. Amounts are separate from current vendor quotations. | — | 118.97 / 119.36 Estimate E | 4 316.42 Estimate E |
| Base unit estimate, GermanyEUR thousand | — | — | 3 842.87 Estimate E |
| Base one-time program cost, RussiaRUB million | — | Outside the R5 geometry estimate Open E | 1 898.62 Estimate E |
| Operating cost per cycleThe calculator allows editable tariffs and assumptions. Costs are kept in their respective currencies. | — | Tariff, maintenance, ground equipment and component life remain open Open E | Measured wall energy and service rates are unavailable |
Sources
A· AAMS, pp. 21–22, 34–36C· Native C3 verificationD· RR-H1 landing · 6 msD2· RR-H1 landing · 12 msE· Dated budgets and assumptionsG· R6E5 gear datumsG2· Reservoirs and energy estimatesM· Mesh bounds and native hashesP· P1 full-fuel summaryQ· Sources and open parametersR· Roadster C6I budgetS· R6E5 inputsTR· P1 trace · 5250TR4· P1 trace · 4100V· Five valve profilesW· R6E5 waypoint runs
