Release checklist
Open the provenance file. Verify R10, R07 and the date and SHA-256 of the LLTV guide. Record individual locators for the flight, clip and local CAD.
Four evidence lines are recorded. Missing measurements are marked open.
Open the materialSwitch through the three R8 heights. At the end of the slider, check 32 s and 190 m for each case. Locate the phase boundaries at 9 s and 23 s.
The common endpoint is reproduced. The profile is attached to its modelled scenario.
Open the materialOpen Kickflip. Check PTS₃ − PTS₂ and PTS₄ − PTS₁ in the CSV and identify where contact is obscured. Check initial support and the completion criterion for each vehicle.
2.878–5.506 s on the clip clock. The Ludion fog episode stays separate from the 190 m flight.
Open the materialSet one region and the same work scope for both scenarios. Clear duration in a scenario whose time is unknown.
Cost per second stays blank. Acceptance rate and attempt count are visible.
Open the materialChange the quantity and restore its starting value. Cross-check one row with the calculator. Locate the separate blank fields for actual costs.
The workbook recalculates. Region, currency, estimate scope and rate source are visible.
Open the materialOpen both models. Select a group, isolate it, separate the assembly and restore the whole view. Check the static mode.
Each model has eight display groups. The separated positions are illustrative.
Open the materialCompare the three intervals with the evidence PDF and film. After extraction, run the integrity check in the launch instructions.
Links open and the checksums match. Dates, revisions and open fields are visible.
Open the material