IMPULSE R06 · test programme
HP‑A bench test
Hydro‑Pac LX C12‑40‑10500LX · Ten cycles. Verify that supply, thermal state and leak integrity are restored within 20 minutes after each sprint.
Test programme prepared. Physical records are pending. 0 of 10 cycles completed.
10-cycle log CSV · Approval sheet JSON · Series status JSON · Station sizing and selection
Cycle matrix
| Cycle | Conditions | Result |
|---|---|---|
| 01 | First cycle from the agreed initial state at nominal supply. | Not run |
| 02 | Nominal repeat. Start after the previous cycle without an artificial thermal reset. | Not run |
| 03 | Nominal repeat. Start after the previous cycle without an artificial thermal reset. | Not run |
| 04 | Nominal repeat. Start after the previous cycle without an artificial thermal reset. | Not run |
| 05 | Nominal repeat. Start after the previous cycle without an artificial thermal reset. | Not run |
| 06 | Warm repeat at the minimum approved source pressure. | Not run |
| 07 | Warm repeat at the minimum approved source pressure. | Not run |
| 08 | Warm repeat at the minimum approved source pressure. | Not run |
| 09 | Warm repeat at the minimum approved source pressure. | Not run |
| 10 | Confirmation at the agreed thermal and supply boundary. | Not run |
The order is fixed. Keep all first ten attempts, including stops, failures and omissions. Changes to hardware, safeguards, instrumentation or fill control require a separate series. Commissioning runs have their own log.
Approval and configuration
Use a qualified bench that represents R06 HP‑A, including T101 and T102, production-intent or approved equivalent vessels, routing, supports, enclosures and airflow obstructions. Record the Hydro‑Pac LX C12‑40‑10500LX and vessel serials, safety-critical hardware, station configuration, software and calibrations. Applying one result to AWD and RWD requires signed equivalence of HP‑A hardware, gas interfaces, thermal installation and release controls. Otherwise, the result applies to the tested installation.
The test authority signs the approval sheet before pressurisation. Define the qualified vessel and line pressure–temperature envelope, station operating range, representative draw tolerance, final charge and imbalance, stabilisation criteria, leak method, leak limit, dwell time, environmental boundaries and safety provisions. The working limits need approval. The model reference is 54.04 kg in 130 L, equivalent to 49.05 MPa absolute at 20 °C.
Verify approved shutdown and interlocks, ventilation, oxygen monitoring, gas discharge handling, barriers, remote observation, calibration and common timestamps before scoring. The facility authorises pressure testing. Unexpected trips, envelope excursions, defects, leaks or data loss stop the attempt and inhibit release.
One cycle
- On the approved bench, reproduce the agreed draw profile for one base sprint, with 11.62 kg as the design reference. Log residual inventory and the state of each vessel before connection. Verify the actual starting state against its approved profile.
- Start t₀ at the end of the representative draw or base sprint. A full run log includes return to the station. A stationary bench log adds the approved return allowance of at least 60 s, or the higher measured worst-case time. Pauses and top-ups stay on the same clock.
- Connect under the approved bench procedure. Record first and last transfer, net nitrogen delivered, end-of-fill flow and source pressure. The selected station targets 2.40 kg/min net average through restoration, at the 2,000 psig suction reference. The approved operating envelope governs safety.
- Log both vessels during cooldown and stabilisation. T101 and T102 must separately satisfy the approved band and drift limits over a common stable window. Record the start of the window and each vessel’s minimum and maximum temperature and upper absolute drift. Continue monitoring until release. The cooling budget is 6 min.
- After stabilisation, isolate HP‑A under the approved procedure and run the leak check. Allow 4 min in the planning budget, subject to demonstrated sensitivity. Check final inventory, both vessel states, interlocks and disconnection. Record signed release.
- Stop the clock at signed HP‑A release after the station is disconnected. The result concerns gas system readiness. Vehicle propulsion, battery and tyres have separate release criteria.
Measurements and leak test
| Channel | Record |
|---|---|
| Station and delivery | Inlet and outlet pressure, absolute pressure at the charge point, net mass flow and its integral, inlet gas temperature, valve state and cooling mode. Terminal delivery is the average over the final 10% of added mass. Interruptions between first and last transfer are included in mean delivery. |
| T101 and T102 | Absolute pressure, bulk gas temperature from the approved measurement method, wall and cooling medium temperature for each vessel. Document temperature sensor lag and suitability for the leak check. |
| Timing and safety | UTC t₀, common monotonic seconds from t₀, trips, oxygen reading, operator witness and one raw file per cycle. Approve acquisition rates, timestamp alignment and measurement uncertainty before scoring. |
If pressure decay is used, evaluate temperature-compensated inventory with absolute pressure, gas temperature for each test volume and the approved real-gas and vessel-compliance models. Near full charge a 1 °C drift can shift HP‑A pressure by roughly 0.265 MPa. Demonstrate sensitivity and dwell with a qualified reference leak or flow standard and a tight control volume. Account for isolated dead volume, valve and fixture leakage. The upper leak estimate including uncertainty must meet the approved limit. Unresolved thermal drift invalidates the check. ASTM E2930-26 is a sensitivity and dwell reference. Its scope uses ideal gas and excludes deformable vessels. The authority determines which standards apply to this assembly.
Acceptance and evidence pack
Pass requires 10/10. Each of the first ten attempts must meet the 1,200 s upper time limit with clock uncertainty and the return allowance included. Each attempt must meet the representative draw, ready inventory, net flow and suction, individual vessel stability, leak, operating envelope and interlock requirements. A timeout, abort, invalid record or missing attempt counts against acceptance. Report the longest elapsed time, smallest margin and causes of failed checks.
Keep signed approval, one raw time series per cycle, the completed CSV, calibrations, uncertainty assessment and signed decision. CSV names with _U_ designate expanded uncertainty. Evaluate upper bounds for durations and leakage where applicable, and lower bounds for delivered flow and inventory. Enter YES in the four gate fields with evidence, and use RECORDED, ABORT, INVALID or NOT_RUN for the outcome. Record t₀ in UTC ISO 8601 and use a distinct raw file under the register folder for each attempt. The checker scores the submitted entries and records source hashes. The test authority signs equipment release.
Register checker · Log template · Approval sheet
Copy the CSV and approval sheet alongside the raw files. After signing, the authority sets approval status to APPROVED_FOR_TEST and enters the limits. Run the checker on the completed copies from the showcase folder.
python -B -X utf8 source/calculation/hpa_bench_evaluate.py path/to/cycles.csv path/to/approval.json --output path/to/result.json