TextToCAD
RU

ROADSTER ROCKET · C6I / V1 · DEV50-REFILL-01

AIR replenishment

25 November 2026

Current C6I and planned V1 compared at the same refill station.

C6I and V1 replenish the same mass. The matched V1 calculation reduces dry mass and retains the same rear AIR pulse and gas use.

ParameterCurrent C6IPlanned V1
AIR to replenish33.398 kg33.398 kg
Mean delivered flow0.80 kg/min0.80 kg/min
Refill delivery time41.7 min41.7 min
Ready-to-repeat time66.7 min66.7 min
Mean station power during delivery20.16 kW20.16 kW
Delivery electricity14.03 kWh14.03 kWh
Standby and check electricity0.62 kWh0.62 kWh
Station electricity per cycle14.65 kWh14.65 kWh
AIR replenishment cost146.52 RUB146.52 RUB

Station assumptions

Defaults are illustrative. Mean flow covers mass delivered over the entire replenishment stage. Specific energy covers station equipment during delivery. The readiness model treats the stages as sequential.

Calculation boundary

Measurements to replace assumptions

Delivered mass and time for each branch, station electricity meter, actual settling and release time at restored states, tariff and other costs.

C6I AIR use · V1 AIR use · DEV44 low return

U.S. DOE · Compressed Air Sourcebook · CoolProp · Air EOS