ROADSTER ROCKET · C6I / V1 · DEV50-REFILL-01
AIR replenishment
25 November 2026
Current C6I and planned V1 compared at the same refill station.
Calculation boundary
- Delivery time = Δm / q. Readiness time adds connection and disconnection, settling and checks.
- Energy = Δm × specific energy + standby power × idle hours. Cost = energy × tariff + the entered additional cost.
- The cycle restores AIR from end-of-run inventory to the starting mass. Readiness time is a planning allowance. Actual readiness depends on settling, leak checks and authorised release.
- Cost covers AIR replenishment. Traction energy, capital cost, labour and service can only enter through the separately shown additional cost.
- The energy scale check gives 4.92 kWh of reversible isothermal work for a separate nominal T200 vessel calculation. Station electricity depends on the actual installed equipment.
Measurements to replace assumptions
Delivered mass and time for each branch, station electricity meter, actual settling and release time at restored states, tariff and other costs.