TextToCAD
RU

ROADSTER ROCKET · C6I / V1 · DEV51-AIR-STATION-01

AIR station options

25 November 2026

Equipment, turnaround and bench acceptance for C6I and V1.

What to put in the RFQ

S1 is the preferred RFQ for initial full C6I and V1 cycles. Consider S2 for regular repeats if the rig verifies doubled delivery. S0 is for separate T400 qualification.

C6I maps use 30.00 MPa absolute for T400 and 68.95 MPa absolute for T200. BAUER PE 500-VE is rated for 420 bar, with an 11 kW motor and a catalogue charging figure of 500 L/min. T200 needs a separate booster. BAUER · PE-VE

Haskel Q45-45 is the lead booster candidate, with a catalogue maximum of 1,034 bar. Maximator EHB is a second RFQ candidate. Both need written confirmation for AIR, upper-end delivery and actual cooling. A single catalogue maximum does not establish the duty point. Haskel · Q-Drive · Maximator · EHB

Equipment, power and budget

ParameterS0S1S2
PurposeSeparate T400 test rigC6I and V1 refill · one precompressorRepeated runs · two precompressors
Equipment to quote1 × BAUER PE 500-VE1 × BAUER PE 500-VE + Q45-452 × BAUER PE 500-VE + Q45-45
Modelled mean delivery rate0.45 kg/min0.45 kg/min0.90 kg/min
BAUER motor ratings11 kW11 kW22 kW
Mean station power T400 / T2008.64 / — kW8.64 / 11.34 kW17.28 / 22.68 kW
Precompressors at public price excluding VAT30.75 kEUR30.75 kEUR61.50 kEUR
Booster package · budget allowance0–0 kEUR50–110 kEUR75–150 kEUR
Rig, metering, guarding and interfaces8–16 kEUR15–30 kEUR27–50 kEUR
Equipment, excluding VAT38.75–46.75 kEUR95.75–170.75 kEUR163.5–261.5 kEUR
Installed and commissioned, excluding VAT43.75–56.75 kEUR105.75–190.75 kEUR179.5–291.5 kEUR

The 0.45 and 0.90 kg/min allowances are below the 0.60 and 1.20 kg/min scale check from 500 L/min at 20 °C and 101.325 kPa. Actual end-pressure flow requires verification. Site input rating, inrush current and kVA depend on the quoted configuration.

Public BAUER listing starts at EUR 36,592.50 with 19% VAT, excluding shipping (checked 25 Nov 2026). The budget uses EUR 30,750 before VAT. Booster, fixtures and commissioning are provisional tender allowances. Freight, duties, VAT and major site work are outside the estimate. Pressure Point Germany · 132-3100

Time and cost per replenishment

Cycle and AIR replenishedS1S2
C6I launch · T200
33.398 kg
99.2 min to ready74.2 min delivery · 14.65 kWh · 146.52 RUB62.1 min to ready37.1 min delivery · 14.65 kWh · 146.52 RUB
V1 launch · T200
33.398 kg
99.2 min to ready74.2 min delivery · 14.65 kWh · 146.52 RUB62.1 min to ready37.1 min delivery · 14.65 kWh · 146.52 RUB
DEV44 low return · T400 and reserve
105.592 kg
259.6 min to ready234.6 min delivery · 34.41 kWh · 344.14 RUB142.3 min to ready117.3 min delivery · 34.41 kWh · 344.14 RUB
V1 return · hypothetical 20% reduction
84.474 kg
212.7 min to ready187.7 min delivery · 27.66 kWh · 276.57 RUB118.9 min to ready93.9 min delivery · 27.66 kWh · 276.57 RUB

S0 covers the T400 rig only. Full-cycle rows apply to S1 and S2. DEV44 replenishes 88.113 kg in T400 and 17.478 kg in the reserve. The V1 row assumes both drop by 20% as a sensitivity; production V1 packaging is still open.

The comparison assumes 0.32 kWh/kg for T400 and reserve and 0.42 kWh/kg for T200. Modelled delivery time is increased by a 25 min allowance for connection, settling and release. Standby is 1.5 kW and the illustrative tariff is RUB 10/kWh. Fixed specific energy makes S2 faster while the modelled electricity cost stays equal to S1. U.S. DOE · Sourcebook

Bench test requirements

Open the S1 acceptance criteria for T400 and T200

ST-01 · Confirm the package before procurement

Obtain written confirmation of dry AIR service, inlet and outlet operating envelopes, upper-end delivery and duty limits. Request startup electrical data, heat rejection, supply scope and price.

ST-02 · Freeze gas configuration and stand release

Record T400, T200 and reserve separately. Use a qualified stand with approved fixtures. The approved programme sets the operating limits and readiness condition for the actual vessels and fittings. The DEV44 adapter path still needs verification.

ST-03 · Measure flow, temperature, mass and electricity

Synchronise inlet and outlet pressure and temperature for each branch, delivered flow, independent mass, mains power and stop events. Include startup, steady delivery and the end of replenishment. Meter station buffer replenishment separately, where used.

ST-04 · Verify repeatability and balance

Proposed gate: three consecutive cycles for each claimed operating mode. The lowest mean delivered flow after allowing for uncertainty must cover 0.45 kg/min for S1 or 0.90 kg/min for S2. Reconcile integrated flow with independent mass within agreed expanded uncertainty.

ST-05 · Check abort behaviour and actual readiness

Verify the safe state on loss of power, communications, cooling or a sensor signal and on branch unavailability under the approved test plan. Mark readiness after mass restoration, settling, leak checks and release. Compare worst observed time and energy with the budget and record causes of deviations.

ST-06 · Release a C6I and V1 test record

Record station and vehicle revisions, calibration, raw traces, integrals, ranges and scatter, phase energy and release authorisation. Qualify a separate V1 refill profile after configuration freeze.

The figures support station screening and requests for quotation. Bench acceptance and approval for use are governed by a separate release record.

DEV44 · AIR_BENCH · DEV51 · JSON