ROADSTER ROCKET · C6I / V1 · DEV51-AIR-STATION-01
Technical and economic specifications
25 November 2026
R5 / C6I baseline and V1 planning case for one AIR vehicle within the existing envelope. DEV45 identifies V1 as the lead option for investigation. Each value carries a status and source.
| Parameter | Current C6I | Planned V1 |
|---|---|---|
| Dimensions and mass | ||
| Length × width × height |
4590 × 2031 × 1328 mm
CAD
Closed C6I body envelope. Roof height from nominal Z=0. Loaded height requires a separate check. Source ↗ |
4590 × 2031 × 1328 mm
Requirement
Retain the C6I outer envelope with no external rotors. Source ↗ |
| Wheelbase |
3150 mm
CAD
Difference between tyre-centre positions in static C6I VIEW. Source ↗ |
3150 mm
Design estimate
Baseline geometry for the sensitivity calculation. Confirm after packaging. Source ↗ |
| Front / rear track |
1710 / 1690 mm
CAD
From tyre bounding-box centres, with 1 mm mesh quantization. Source ↗ |
1710 / 1690 mm
Design estimate
Baseline geometry for the sensitivity calculation. Confirm after packaging. Source ↗ |
| Loaded ground clearance |
— mm
Open
Measure at specified loads and tyre pressures with skirts stowed. Related task ↗ |
— mm
Open
Measure at specified loads and tyre pressures with skirts stowed. Related task ↗ |
| Dry mass |
3194.8 kg
Design estimate
Excludes compressed gas, operating fluids and driver. Includes allowances for unfinished parts. Source ↗ |
≤2 800 kg
Requirement
V1 target · MAS-01. Source ↗ |
| Dry mass range |
2692.2–3963.9 kg
Design estimate
Low and high ledger variants reflect composition and mass assumptions. Source ↗ |
— kg
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Operating mass without gas |
3311.9 kg
Design estimate
Includes operating fluids and an 85 kg modelled driver. Driver allowance spans 75–105 kg. Source ↗ |
2917.1 kg
Design estimate
Estimate at 2,800 kg dry, retaining the baseline fluids, driver and AIR inventory where applicable. Source ↗ |
| Operating mass without gas or driver |
3226.9 kg
Design estimate
Central operating estimate minus the 85 kg driver. Source ↗ |
2832.1 kg
Design estimate
Estimate at 2,800 kg dry, retaining the baseline fluids, driver and AIR inventory where applicable. Source ↗ |
| Charged mass · AIR launch |
3557.2 kg
Numerical result
Initial mass in the matched launch tests. The combined gas and line inventory adds 245.3 kg to the ledger. Source ↗ |
3162.4 kg
Design estimate
Estimate at 2,800 kg dry, retaining the baseline fluids, driver and AIR inventory where applicable. Source ↗ |
| Charged mass · N₂, DEV26 |
3531.8 kg
Numerical result
At the start of B2 preparation, including the tank and circuit inventories. From simulation. Source ↗ |
— kg
Open
The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗ |
| Charged mass · AIR, DEV44 |
3971.0 kg
Numerical result
Separate DEV44 packaging hypothesis with an additional reserve and ballast. Source ↗ |
— kg
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Maximum gross mass and payload |
— kg
Open
Reconcile axle loads, tyre operating limits and structural capacity, then verify by weighing. Related task ↗ |
— kg
Open
Reconcile axle loads, tyre operating limits and structural capacity, then verify by weighing. Related task ↗ |
| Electric drive and battery | ||
| Traction battery nominal energy |
62.208 kWh
Design estimate
ENG62 design, based on nominal voltage and cell capacity. Source ↗ |
62.208 kWh
Design estimate
ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗ |
| Battery charge capacity |
80 Ah
Design estimate
216S16P, 3,456 cells in the design. Source ↗ |
80 Ah
Design estimate
ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗ |
| Voltage · nominal / fully charged |
777.6 / 907.2 V
Design estimate
ENG62 design values. Source ↗ |
777.6 / 907.2 V
Design estimate
ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗ |
| Battery model · continuous / peak power |
400 / 550 kW
Design estimate
R3 model limits. Peak limit applies for the first 10 s. SoC, temperature and cooling limits require validation. Source ↗ |
400 / 550 kW
Design estimate
ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗ |
| DEV44 auxiliary load |
5.4 kW
Design estimate
Assumed auxiliary load for the AIR flight calculations. Source ↗ |
— kW
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Usable battery energy |
— kWh
Open
Measure between approved SoC limits at operating temperatures. Related task ↗ |
— kWh
Open
Measure between approved SoC limits at operating temperatures. Related task ↗ |
| Battery charge from 10% to 80% |
— min
Open
Requires input-power profile, BMS limits and a run with installed cooling. Related task ↗ |
— min
Open
Requires input-power profile, BMS limits and a run with installed cooling. Related task ↗ |
| Wheel power and torque |
— kW, N·m
Open
Measure the installed drivetrain over speed, SoC and temperature. Related task ↗ |
— kW, N·m
Open
Measure the installed drivetrain over speed, SoC and temperature. Related task ↗ |
| Gas and refilling | ||
| T400 internal volume |
399.89 L
Design estimate
Vessel input volume in the gas map, excluding pipes and adapters. Source ↗ |
399.89 L
Design estimate
Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗ |
| T400 initial AIR pressure |
30.00 MPa abs.
Numerical result
Map initial state at 20 °C. Vessel working pressure requires separate qualification. Source ↗ |
— MPa abs.
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| T200 internal volume |
199.94 L
Design estimate
Vessel input volume in the gas map, excluding pipes and adapters. Source ↗ |
199.94 L
Design estimate
Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗ |
| T200 initial AIR pressure |
68.95 MPa abs.
Numerical result
Map initial state at 20 °C. Vessel working pressure requires separate qualification. Source ↗ |
— MPa abs.
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Baseline total vessel volume |
599.83 L
Design estimate
T400 plus T200. The GX and backup maps reference the same T200. Source ↗ |
599.83 L
Design estimate
Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗ |
| Additional DEV43/44 AIR reserve |
239.97 L
CAD
Packaging screen for distributed vessels. Usable capacity and pressure depend on selected vessels. Source ↗ |
— L
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Modelled AIR inventory · T400 / T200 |
129.104 / 106.166 kg
Numerical result
Inventory in initial maps at 20 °C. Whole-vehicle charge depends on configuration. Source ↗ |
129.104 / 106.166 kg
Design estimate
Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗ |
| N₂ in T400 plus T200 after preparation |
212.435 kg
Numerical result
Playback time zero of the DEV26 coupled recording. Source ↗ |
— kg
Open
The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗ |
| Mean AIR refill rate |
0.80 kg/min
Design estimate
After one assisted launch. Illustrative station and tariff assumptions. Source ↗ |
0.80 kg/min
Design estimate
Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗ |
| Ready after AIR refill |
66.7 min
Design estimate
After one assisted launch. Illustrative station and tariff assumptions. Source ↗ |
66.7 min
Design estimate
Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗ |
| AIR station electricity per cycle |
14.65 kWh
Design estimate
After one assisted launch. Illustrative station and tariff assumptions. Source ↗ |
14.65 kWh
Design estimate
Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗ |
| AIR delivery time |
41.7 min
Design estimate
After one assisted launch. Illustrative station and tariff assumptions. Source ↗ |
41.7 min
Design estimate
Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗ |
| N₂ refill rate and duration |
— kg/min / min
Open
Separate data for N₂ and its filling station are outstanding. Related task ↗ |
— kg/min / min
Open
Separate data for N₂ and its filling station are outstanding. Related task ↗ |
| Combined two-branch bench delivery |
— kg/s
Open
Instrumented bench records for simultaneous delivery are outstanding. Related task ↗ |
≥165 kg/s
Requirement
Expert screening target pending approval. Verify with both branches delivering together. Source ↗ |
| Acceleration and ground operation | ||
| 0–100 km/h · electric only |
6.599 s
Numerical result
Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust disabled. Source ↗ |
5.877 s
Numerical result
Mass sensitivity at 2,800 kg dry. C6I drivetrain and gas map retained. Source ↗ |
| 0–100 km/h · electric + rear AIR |
5.629 s
Numerical result
Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust commanded from 0.10 to 0.85 s. Source ↗ |
4.908 s
Numerical result
Mass sensitivity at 2,800 kg dry. C6I drivetrain and gas map retained. Source ↗ |
| Rear AIR time saving in the matched calculation |
0.970 / 14.7 s / %
Numerical result
Difference in time to 100 km/h. Checked at two integration steps. Source ↗ |
0.969 / 16.5 s / %
Numerical result
Rear AIR benefit in the V1 mass sensitivity. Source ↗ |
| Rear-circuit AIR used in matched run |
33.398 kg
Numerical result
Total over the 8 s calculation, with one rear-thrust pulse. Source ↗ |
33.398 kg
Numerical result
Baseline single rear AIR pulse in the V1 sensitivity. Source ↗ |
| Maximum ground speed |
— km/h
Open
Validate gearing, power, drag, stability and tyre speed capability. Related task ↗ |
>444.18 km/h
Requirement
DEV45 level-A reference, pending drivetrain, tyre and aerodynamic validation. Source ↗ |
| 100–0 km/h braking distance |
— m
Open
Fix surface, initial mass and tyre state. Measure repeated stops. Related task ↗ |
— m
Open
Fix surface, initial mass and tyre state. Measure repeated stops. Related task ↗ |
| EV energy consumption and range |
— kWh/100 km / km
Open
Use a driving cycle and usable battery energy, with documented load and temperature. Related task ↗ |
— / >579.36 kWh/100 km / km
Requirement
Provisional range reference. Energy consumption and a comparable cycle remain to be defined. Source ↗ |
| 0–60 mph · matched timing protocol |
— s
Open
A common timing procedure is required for comparison with the demonstration. Related task ↗ |
≤0.648 s
Requirement
+20% demonstration-reference target. The start convention must match. Source ↗ |
| Flight and landing | ||
| N₂ ballistic hop · CoM rise |
2.268 m
Numerical result
DEV26 2 m benchmark. Peak above initial equilibrium; 2.232 m above liftoff and 2.694 m absolute. Source ↗ |
≥5 m
Requirement
CoM rise in the official series. Landing is part of acceptance. Source ↗ |
| Airborne time · N₂ DEV26 |
1.7045 s
Numerical result
From liftoff to the first loaded FR tyre. Source ↗ |
— s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Horizontal displacement / path · N₂ DEV26 |
0.856 / 0.857 m
Numerical result
Net displacement and projected CoM path length over the same interval. Source ↗ |
— m
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Mean airborne horizontal speed |
0.503 m/s
Numerical result
Projected path length divided by airborne time. Source ↗ |
— m/s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Peak airborne horizontal speed |
2.109 m/s
Numerical result
Peak across consecutive saved DEV26 samples. Source ↗ |
— m/s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Peak airborne 3D CoM speed |
4.582 m/s
Numerical result
Combines horizontal sample-to-sample speed and recorded vertical speed. Source ↗ |
— m/s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Vertical speed at touchdown |
-2.261 m/s
Numerical result
DEV26. Negative values indicate descent. Source ↗ |
— m/s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| N₂ used by end of coupled run |
110.811 kg
Numerical result
Combined tank depletion from the saved calculation. Source ↗ |
— kg
Open
The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗ |
| Prelaunch preparation · DEV26 |
0.912 s
Numerical result
Solver time to ready state. Refilling is a separate operation. Source ↗ |
— s
Open
The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗ |
| N₂ landing · FR load and peak rod |
48.23 / 0.8787 kN / m/s
Numerical result
DEV26 ended with one support and zero dwell at the skirt-rate limit. Source ↗ |
— kN / m/s
Open
The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗ |
| AIR · limited feed · CoM height |
1.636 m
Numerical result
Peak absolute CoM height in DEV44. Source ↗ |
— m
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| AIR · limited feed · airborne time |
1.3635 s
Numerical result
Liftoff to first contact. Source ↗ |
— s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| AIR · limited feed · AIR and electricity |
98.423 / 2.3775 kg / Wh
Numerical result
To the end of recording. Electricity for the 5.4 kW auxiliary bus. Source ↗ |
— kg / Wh
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| AIR · limited feed · dwell / peak rod speed |
0.00 / 1.0502 s / m/s
Numerical result
No sustained dwell before the RL rod limit. Source ↗ |
— s / m/s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| AIR · low return · CoM height |
0.676 m
Numerical result
Peak absolute CoM height in DEV44. Source ↗ |
— m
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| AIR · low return · airborne time |
1.0835 s
Numerical result
Liftoff to first contact. Source ↗ |
— s
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| AIR · low return · AIR and electricity |
105.592 / 3.9698 kg / Wh
Numerical result
To the end of recording. Electricity for the 5.4 kW auxiliary bus. Source ↗ |
— kg / Wh
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| AIR · low return · dwell / peak rod speed |
0.50 / 0.7638 s / m/s
Numerical result
Local dwell achieved at reduced height with no yaw command. Source ↗ |
≥0.50 / ≤1.00 s / m/s
Requirement
Local landing must hold four supports under the limit for every rod. Source ↗ |
| Local positioning · passed model runs |
27 / 75 cases
Numerical result
Local position, heading and landing limits in the DEV45-POS-01 grid. Source ↗ |
— cases
Open
Verify on the equipped V1 in its own simulation or test. Related task ↗ |
| Official 5 m CoM rise series |
0 / 4 passed
Numerical result
Nominal and adverse runs for AIR and N₂. Acceptance covers the full manoeuvre and landing. Source ↗ |
4 / 4 passed
Requirement
Overall AIR/N₂ programme goal. A V1 trial covers its own AIR configuration. Source ↗ |
| Hover and yaw objective |
2.50 / 180 / 1.12 m / ° / s
Requirement
CG world height, yaw change and turn time in the C6I upgrade. Source ↗ |
3.00 / 180 / ≤1.12 m / ° / s
Requirement
+20% target. Height tolerance ±0.12 m and dwell ≥2.16 s. Intermediate turn at 2.50 m. Source ↗ |
| Stable landing criterion |
4 / ≥0.50 / ≤1.00 wheels / s / m/s
Requirement
Four supports, uninterrupted dwell and a speed limit for every rod. Source ↗ |
4 / ≥0.60 / ≤0.80 wheels / s / m/s
Requirement
+20% target. Working dwell and rod speed limits are 0.50 s and 1.00 m/s. Source ↗ |
| Cost and operations | ||
| Prototype build cost |
— currency / vehicle
Open
Complete BOM, supplier quotations, labour, tooling and initial acceptance. Related task ↗ |
— currency / vehicle
Open
Complete BOM, supplier quotations, labour, tooling and initial acceptance. Related task ↗ |
| Refill and charging station cost |
— currency
Open
Quote equipment, installation, commissioning and monitoring. Related task ↗ |
— currency
Open
Quote equipment, installation, commissioning and monitoring. Related task ↗ |
| AIR replenishment cycle cost |
146.52 RUB/cycle
Design estimate
After one assisted launch. Illustrative station and tariff assumptions. Source ↗ |
146.52 RUB/cycle
Design estimate
Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗ |
| Traction electricity cost |
— currency / 100 km
Open
Energy drawn from the grid per 100 km × tariff, including charging losses. Related task ↗ |
— currency / 100 km
Open
Energy drawn from the grid per 100 km × tariff, including charging losses. Related task ↗ |
| Turnaround between attempts |
— min / cycle
Open
AIR replenishment time is estimated separately. Confirm full turnaround using actual cooldown, checks and vehicle preparation. Related task ↗ |
— min / cycle
Open
AIR replenishment time is estimated separately. Confirm full turnaround using actual cooldown, checks and vehicle preparation. Related task ↗ |
| Cost per completed manoeuvre |
— currency / manoeuvre
Open
Include gas, electricity, service and failed-attempt costs. Requires repeatability data and tariffs. Related task ↗ |
— currency / manoeuvre
Open
Include gas, electricity, service and failed-attempt costs. Requires repeatability data and tariffs. Related task ↗ |
| Vessel life and service interval |
— cycles / h
Open
Qualified vessel data, cycle counting and inspection plan. Related task ↗ |
— cycles / h
Open
Qualified vessel data, cycle counting and inspection plan. Related task ↗ |
| Suspension, skirts and cable life |
— cycles
Open
Cyclic durability programme with periodic checks and cost of replacement. Related task ↗ |
— cycles
Open
Cyclic durability programme with periodic checks and cost of replacement. Related task ↗ |
| Gas and energy per matched task |
— of reference
Open
Common-protocol measurements of the original are outstanding. Related task ↗ |
≤80% of reference
Requirement
Compare the completed manoeuvre at equivalent initial and replenished inventories. Source ↗ |
No matching parameters. Adjust the filters.
