TextToCAD
RU

ROADSTER ROCKET · C6I / V1 · DEV51-AIR-STATION-01

Technical and economic specifications

25 November 2026

R5 / C6I baseline and V1 planning case for one AIR vehicle within the existing envelope. DEV45 identifies V1 as the lead option for investigation. Each value carries a status and source.

73 / 73 AIR refill calculator AIR station options Download CSV
ParameterCurrent C6IPlanned V1
Dimensions and mass
Length × width × height 4590 × 2031 × 1328 mm CAD

Closed C6I body envelope. Roof height from nominal Z=0. Loaded height requires a separate check. Source ↗

4590 × 2031 × 1328 mm Requirement

Retain the C6I outer envelope with no external rotors. Source ↗

Wheelbase 3150 mm CAD

Difference between tyre-centre positions in static C6I VIEW. Source ↗

3150 mm Design estimate

Baseline geometry for the sensitivity calculation. Confirm after packaging. Source ↗

Front / rear track 1710 / 1690 mm CAD

From tyre bounding-box centres, with 1 mm mesh quantization. Source ↗

1710 / 1690 mm Design estimate

Baseline geometry for the sensitivity calculation. Confirm after packaging. Source ↗

Loaded ground clearance — mm Open

Measure at specified loads and tyre pressures with skirts stowed. Related task ↗

— mm Open

Measure at specified loads and tyre pressures with skirts stowed. Related task ↗

Dry mass 3194.8 kg Design estimate

Excludes compressed gas, operating fluids and driver. Includes allowances for unfinished parts. Source ↗

≤2 800 kg Requirement

V1 target · MAS-01. Source ↗

Dry mass range 2692.2–3963.9 kg Design estimate

Low and high ledger variants reflect composition and mass assumptions. Source ↗

— kg Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Operating mass without gas 3311.9 kg Design estimate

Includes operating fluids and an 85 kg modelled driver. Driver allowance spans 75–105 kg. Source ↗

2917.1 kg Design estimate

Estimate at 2,800 kg dry, retaining the baseline fluids, driver and AIR inventory where applicable. Source ↗

Operating mass without gas or driver 3226.9 kg Design estimate

Central operating estimate minus the 85 kg driver. Source ↗

2832.1 kg Design estimate

Estimate at 2,800 kg dry, retaining the baseline fluids, driver and AIR inventory where applicable. Source ↗

Charged mass · AIR launch 3557.2 kg Numerical result

Initial mass in the matched launch tests. The combined gas and line inventory adds 245.3 kg to the ledger. Source ↗

3162.4 kg Design estimate

Estimate at 2,800 kg dry, retaining the baseline fluids, driver and AIR inventory where applicable. Source ↗

Charged mass · N₂, DEV26 3531.8 kg Numerical result

At the start of B2 preparation, including the tank and circuit inventories. From simulation. Source ↗

— kg Open

The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗

Charged mass · AIR, DEV44 3971.0 kg Numerical result

Separate DEV44 packaging hypothesis with an additional reserve and ballast. Source ↗

— kg Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Maximum gross mass and payload — kg Open

Reconcile axle loads, tyre operating limits and structural capacity, then verify by weighing. Related task ↗

— kg Open

Reconcile axle loads, tyre operating limits and structural capacity, then verify by weighing. Related task ↗

Electric drive and battery
Traction battery nominal energy 62.208 kWh Design estimate

ENG62 design, based on nominal voltage and cell capacity. Source ↗

62.208 kWh Design estimate

ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗

Battery charge capacity 80 Ah Design estimate

216S16P, 3,456 cells in the design. Source ↗

80 Ah Design estimate

ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗

Voltage · nominal / fully charged 777.6 / 907.2 V Design estimate

ENG62 design values. Source ↗

777.6 / 907.2 V Design estimate

ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗

Battery model · continuous / peak power 400 / 550 kW Design estimate

R3 model limits. Peak limit applies for the first 10 s. SoC, temperature and cooling limits require validation. Source ↗

400 / 550 kW Design estimate

ENG62 is retained in the matched calculation. The new layout needs an energy, power and cooling balance. Source ↗

DEV44 auxiliary load 5.4 kW Design estimate

Assumed auxiliary load for the AIR flight calculations. Source ↗

— kW Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Usable battery energy — kWh Open

Measure between approved SoC limits at operating temperatures. Related task ↗

— kWh Open

Measure between approved SoC limits at operating temperatures. Related task ↗

Battery charge from 10% to 80% — min Open

Requires input-power profile, BMS limits and a run with installed cooling. Related task ↗

— min Open

Requires input-power profile, BMS limits and a run with installed cooling. Related task ↗

Wheel power and torque — kW, N·m Open

Measure the installed drivetrain over speed, SoC and temperature. Related task ↗

— kW, N·m Open

Measure the installed drivetrain over speed, SoC and temperature. Related task ↗

Gas and refilling
T400 internal volume 399.89 L Design estimate

Vessel input volume in the gas map, excluding pipes and adapters. Source ↗

399.89 L Design estimate

Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗

T400 initial AIR pressure 30.00 MPa abs. Numerical result

Map initial state at 20 °C. Vessel working pressure requires separate qualification. Source ↗

— MPa abs. Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

T200 internal volume 199.94 L Design estimate

Vessel input volume in the gas map, excluding pipes and adapters. Source ↗

199.94 L Design estimate

Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗

T200 initial AIR pressure 68.95 MPa abs. Numerical result

Map initial state at 20 °C. Vessel working pressure requires separate qualification. Source ↗

— MPa abs. Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Baseline total vessel volume 599.83 L Design estimate

T400 plus T200. The GX and backup maps reference the same T200. Source ↗

599.83 L Design estimate

Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗

Additional DEV43/44 AIR reserve 239.97 L CAD

Packaging screen for distributed vessels. Usable capacity and pressure depend on selected vessels. Source ↗

— L Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Modelled AIR inventory · T400 / T200 129.104 / 106.166 kg Numerical result

Inventory in initial maps at 20 °C. Whole-vehicle charge depends on configuration. Source ↗

129.104 / 106.166 kg Design estimate

Baseline vessels and charge in the mass sensitivity. The new V1 gas package is open. Source ↗

N₂ in T400 plus T200 after preparation 212.435 kg Numerical result

Playback time zero of the DEV26 coupled recording. Source ↗

— kg Open

The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗

Mean AIR refill rate 0.80 kg/min Design estimate

After one assisted launch. Illustrative station and tariff assumptions. Source ↗

0.80 kg/min Design estimate

Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗

Ready after AIR refill 66.7 min Design estimate

After one assisted launch. Illustrative station and tariff assumptions. Source ↗

66.7 min Design estimate

Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗

AIR station electricity per cycle 14.65 kWh Design estimate

After one assisted launch. Illustrative station and tariff assumptions. Source ↗

14.65 kWh Design estimate

Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗

AIR delivery time 41.7 min Design estimate

After one assisted launch. Illustrative station and tariff assumptions. Source ↗

41.7 min Design estimate

Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗

N₂ refill rate and duration — kg/min / min Open

Separate data for N₂ and its filling station are outstanding. Related task ↗

— kg/min / min Open

Separate data for N₂ and its filling station are outstanding. Related task ↗

Combined two-branch bench delivery — kg/s Open

Instrumented bench records for simultaneous delivery are outstanding. Related task ↗

≥165 kg/s Requirement

Expert screening target pending approval. Verify with both branches delivering together. Source ↗

Acceleration and ground operation
0–100 km/h · electric only 6.599 s Numerical result

Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust disabled. Source ↗

5.877 s Numerical result

Mass sensitivity at 2,800 kg dry. C6I drivetrain and gas map retained. Source ↗

0–100 km/h · electric + rear AIR 5.629 s Numerical result

Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust commanded from 0.10 to 0.85 s. Source ↗

4.908 s Numerical result

Mass sensitivity at 2,800 kg dry. C6I drivetrain and gas map retained. Source ↗

Rear AIR time saving in the matched calculation 0.970 / 14.7 s / % Numerical result

Difference in time to 100 km/h. Checked at two integration steps. Source ↗

0.969 / 16.5 s / % Numerical result

Rear AIR benefit in the V1 mass sensitivity. Source ↗

Rear-circuit AIR used in matched run 33.398 kg Numerical result

Total over the 8 s calculation, with one rear-thrust pulse. Source ↗

33.398 kg Numerical result

Baseline single rear AIR pulse in the V1 sensitivity. Source ↗

Maximum ground speed — km/h Open

Validate gearing, power, drag, stability and tyre speed capability. Related task ↗

>444.18 km/h Requirement

DEV45 level-A reference, pending drivetrain, tyre and aerodynamic validation. Source ↗

100–0 km/h braking distance — m Open

Fix surface, initial mass and tyre state. Measure repeated stops. Related task ↗

— m Open

Fix surface, initial mass and tyre state. Measure repeated stops. Related task ↗

EV energy consumption and range — kWh/100 km / km Open

Use a driving cycle and usable battery energy, with documented load and temperature. Related task ↗

— / >579.36 kWh/100 km / km Requirement

Provisional range reference. Energy consumption and a comparable cycle remain to be defined. Source ↗

0–60 mph · matched timing protocol — s Open

A common timing procedure is required for comparison with the demonstration. Related task ↗

≤0.648 s Requirement

+20% demonstration-reference target. The start convention must match. Source ↗

Flight and landing
N₂ ballistic hop · CoM rise 2.268 m Numerical result

DEV26 2 m benchmark. Peak above initial equilibrium; 2.232 m above liftoff and 2.694 m absolute. Source ↗

≥5 m Requirement

CoM rise in the official series. Landing is part of acceptance. Source ↗

Airborne time · N₂ DEV26 1.7045 s Numerical result

From liftoff to the first loaded FR tyre. Source ↗

— s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Horizontal displacement / path · N₂ DEV26 0.856 / 0.857 m Numerical result

Net displacement and projected CoM path length over the same interval. Source ↗

— m Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Mean airborne horizontal speed 0.503 m/s Numerical result

Projected path length divided by airborne time. Source ↗

— m/s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Peak airborne horizontal speed 2.109 m/s Numerical result

Peak across consecutive saved DEV26 samples. Source ↗

— m/s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Peak airborne 3D CoM speed 4.582 m/s Numerical result

Combines horizontal sample-to-sample speed and recorded vertical speed. Source ↗

— m/s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Vertical speed at touchdown -2.261 m/s Numerical result

DEV26. Negative values indicate descent. Source ↗

— m/s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

N₂ used by end of coupled run 110.811 kg Numerical result

Combined tank depletion from the saved calculation. Source ↗

— kg Open

The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗

Prelaunch preparation · DEV26 0.912 s Numerical result

Solver time to ready state. Refilling is a separate operation. Source ↗

— s Open

The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗

N₂ landing · FR load and peak rod 48.23 / 0.8787 kN / m/s Numerical result

DEV26 ended with one support and zero dwell at the skirt-rate limit. Source ↗

— kN / m/s Open

The planned V1 uses AIR. N₂ belongs to the R5 control configuration. Related task ↗

AIR · limited feed · CoM height 1.636 m Numerical result

Peak absolute CoM height in DEV44. Source ↗

— m Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

AIR · limited feed · airborne time 1.3635 s Numerical result

Liftoff to first contact. Source ↗

— s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

AIR · limited feed · AIR and electricity 98.423 / 2.3775 kg / Wh Numerical result

To the end of recording. Electricity for the 5.4 kW auxiliary bus. Source ↗

— kg / Wh Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

AIR · limited feed · dwell / peak rod speed 0.00 / 1.0502 s / m/s Numerical result

No sustained dwell before the RL rod limit. Source ↗

— s / m/s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

AIR · low return · CoM height 0.676 m Numerical result

Peak absolute CoM height in DEV44. Source ↗

— m Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

AIR · low return · airborne time 1.0835 s Numerical result

Liftoff to first contact. Source ↗

— s Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

AIR · low return · AIR and electricity 105.592 / 3.9698 kg / Wh Numerical result

To the end of recording. Electricity for the 5.4 kW auxiliary bus. Source ↗

— kg / Wh Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

AIR · low return · dwell / peak rod speed 0.50 / 0.7638 s / m/s Numerical result

Local dwell achieved at reduced height with no yaw command. Source ↗

≥0.50 / ≤1.00 s / m/s Requirement

Local landing must hold four supports under the limit for every rod. Source ↗

Local positioning · passed model runs 27 / 75 cases Numerical result

Local position, heading and landing limits in the DEV45-POS-01 grid. Source ↗

— cases Open

Verify on the equipped V1 in its own simulation or test. Related task ↗

Official 5 m CoM rise series 0 / 4 passed Numerical result

Nominal and adverse runs for AIR and N₂. Acceptance covers the full manoeuvre and landing. Source ↗

4 / 4 passed Requirement

Overall AIR/N₂ programme goal. A V1 trial covers its own AIR configuration. Source ↗

Hover and yaw objective 2.50 / 180 / 1.12 m / ° / s Requirement

CG world height, yaw change and turn time in the C6I upgrade. Source ↗

3.00 / 180 / ≤1.12 m / ° / s Requirement

+20% target. Height tolerance ±0.12 m and dwell ≥2.16 s. Intermediate turn at 2.50 m. Source ↗

Stable landing criterion 4 / ≥0.50 / ≤1.00 wheels / s / m/s Requirement

Four supports, uninterrupted dwell and a speed limit for every rod. Source ↗

4 / ≥0.60 / ≤0.80 wheels / s / m/s Requirement

+20% target. Working dwell and rod speed limits are 0.50 s and 1.00 m/s. Source ↗

Cost and operations
Prototype build cost — currency / vehicle Open

Complete BOM, supplier quotations, labour, tooling and initial acceptance. Related task ↗

— currency / vehicle Open

Complete BOM, supplier quotations, labour, tooling and initial acceptance. Related task ↗

Refill and charging station cost — currency Open

Quote equipment, installation, commissioning and monitoring. Related task ↗

— currency Open

Quote equipment, installation, commissioning and monitoring. Related task ↗

AIR replenishment cycle cost 146.52 RUB/cycle Design estimate

After one assisted launch. Illustrative station and tariff assumptions. Source ↗

146.52 RUB/cycle Design estimate

Same AIR use and station in the matched calculation. The link includes DEV44 sensitivity. Source ↗

Traction electricity cost — currency / 100 km Open

Energy drawn from the grid per 100 km × tariff, including charging losses. Related task ↗

— currency / 100 km Open

Energy drawn from the grid per 100 km × tariff, including charging losses. Related task ↗

Turnaround between attempts — min / cycle Open

AIR replenishment time is estimated separately. Confirm full turnaround using actual cooldown, checks and vehicle preparation. Related task ↗

— min / cycle Open

AIR replenishment time is estimated separately. Confirm full turnaround using actual cooldown, checks and vehicle preparation. Related task ↗

Cost per completed manoeuvre — currency / manoeuvre Open

Include gas, electricity, service and failed-attempt costs. Requires repeatability data and tariffs. Related task ↗

— currency / manoeuvre Open

Include gas, electricity, service and failed-attempt costs. Requires repeatability data and tariffs. Related task ↗

Vessel life and service interval — cycles / h Open

Qualified vessel data, cycle counting and inspection plan. Related task ↗

— cycles / h Open

Qualified vessel data, cycle counting and inspection plan. Related task ↗

Suspension, skirts and cable life — cycles Open

Cyclic durability programme with periodic checks and cost of replacement. Related task ↗

— cycles Open

Cyclic durability programme with periodic checks and cost of replacement. Related task ↗

Gas and energy per matched task — of reference Open

Common-protocol measurements of the original are outstanding. Related task ↗

≤80% of reference Requirement

Compare the completed manoeuvre at equivalent initial and replenished inventories. Source ↗