R5 / C6I_VIEW
Full vehicle assembly for FreeCAD. The archived first-open check recorded 140 visible parts and 3,456 resolved battery links.
Download modelThe vehicle assembly, component documents and numerical records behind the five project priorities.
Full vehicle assembly for FreeCAD. The archived first-open check recorded 140 visible parts and 3,456 resolved battery links.
Download modelInner frame in chassis coordinates. Reimport verified the geometry of 17 solids. Fits, tolerances and welding still require qualification.
Digital fixture for studying deployment, leakage and cable retention. Inspect the configurations in FreeCAD.
Download modelThe native R10 source covers the entire cabin. This library includes the verified exchange file for the left frame. The receipt identifies the original R10 file, its STEP export and the C6I_VIEW assembly by checksum. CAD · JSON
Requirement IDs, definitions and acceptance criteria in the original Russian.
The N₂ 2 m calculation recorded support only at the front right wheel. Four-wheel dwell was 0 s. The main 5 m series stands at 0 of 4.
DEV26
Compare the tyre and strut maps with measured responses and track load sharing through a continuous 0.5 s dwell.
The FL_W0/W1 fixture passed 198 digital interface checks over three poses. S1–S4 physical data intake contains zero samples.
DEV28
Capture synchronised stroke, force, leakage and retention data and tie the evidence to the four suction zones.
The two R10 door frames add 45.25 g to the central estimate relative to the R08 pair. This is the contribution of those two replacements.
Mass statement
Reconcile mass, centre of gravity, inertia, power and heat loads on one vehicle configuration.
R5 has a numerical front right contact record. Earlier ground runs apply to the R4 configuration.
DEV27
Check tyre, steering, strut and brake maps and verify ground and failure scenarios on R5.
The R10 left inner door frame passed a STEP exchange check for 17 solids. R11 has a separate latch clearance study.
STEP check
Verify load-carrying joints, anchors and emergency exit in the equipped cabin.
Each extract preserves selected source fields and the SHA-256 of its original record. Conclusions apply within the stated scope.
The coupled N₂ 2 m replay matched the original trace. First contact occurred at 1.770 s. Only FR supported the vehicle before the skirt-rate stop.
JSONThe post-contact record spans 31 samples over 29.5 ms. Only FR exceeded the wheel reaction threshold of 100 N.
JSONPeak modelled FR loads were 48.23 kN normal to the tyre and 26.86 kN along the mount axis. The skirt record covers S1–S4 and three control channels.
JSONThe linked run stopped before contact. Its first 726 records matched the reference. A separate local FR replay covered 29.5 ms from prescribed contact.
JSONAll three runs reached the in-flight cutoff at 0.5 s. At 0.49 s tilt reached 5.48305° in the control, 5.19848° with a changed command period and 5.47120° with a changed gas integration step.
JSONOn 22 November the intake contained zero physical AIR states and zero measured skirt samples. Both AIR branches remain MODEL_OPEN.
JSON