R10 advances the early XJ314 engineering branch from R9. Both check valves are revised; bright geometry of both Nene engines is preserved.

Central caseValue
First seat24.085 ms
Kinetic energy0.01171 J
Reverse over250ms5.137 g

Assumed source0.4MPa abs;500K;20L plenum;0.25kg/s each;failure decay tau20ms. These are calculation assumptions, not early aircraft test data.

Master at293K:F closed,R at14mm. New valve hardware has no historical attribution.

FreeCAD · STEP · Checklist

XJ314 · R10 · ENGINEERING

Seat and hot leakage

MetricR9R10
Crown radius,mm816
Nominal leakage,g/s0.0010510.000743
Cases exceeding0.1g/s137128

Comparison uses the same432-case grid:metal293/500/650K,differential10/100/300/500kPa,gap0.2/1/3um,gradient0/2/10/30K,compliance factor0.5/1/2. Nominal:650K,300kPa,1um,2K.

Sealing remains OPEN. An extra grid with proposed finishing gaps0.2/0.5/1um is a process assumption,not a measured surface.

Thermal calculation · Proposed finish

XJ314 · R10 · ENGINEERING

Dashpot debris protection

CaseSeat,msReverse,g
F3224.0855.137
one_port_blocked26.7376.052
blocked_meter41.43410.902
screen9544.40912.317

Four0.9mm ports,four0.6mm needles;guard48×0.5mm holes. Free area9.425mm2 versus meter2.545mm2. Cases cover one blocked port,three blocked ports plus50% guard blockage,and95% guard blockage.

Protection is coarse and conditional. Particles below0.5mm pass;guard rod clearance0.1mm;needle clearance0.15mm. Fibres,flakes and agglomeration require tests. Complete obstruction is not qualified.

Two series resistances use an approximate equivalent area;guard displaced volume and heat transfer are omitted.

XJ314 · R10 · ENGINEERING

Springs and impact

ParameterR9R10
Wire/mean diameter,mm0.9 /181.1 /22
Preload,N22.5
Rate,N/mm0.15468750.18906
Torsion,MPa280.31231.848
Margin to assumed allowable1.0891.316
Minimum hot turn gap,mm-0.309

G77GPa;7active turns;full-lift force and Wahl correction recalculated. Yield792.9MPa is a borrowed conservative718 screen;factor1.5 and shear criterion. Wire certificate,end coils,relaxation and fatigue remain OPEN.

Impact uses an elastic plate and assumed contact damping0.15. Hertz ring contact usesR16;local3D contact strength is not validated.

Strength · All dynamic cases

XJ314 · R10 · ENGINEERING

Verification and open work

CheckStatus
CAD objects/solids490 / 683
Overlaps0
Bright enginesShapes and RGB preserved
Thermal clearances81 combinations;positive
Hot sealingOPEN
Obstruction and service lifeOPEN

Native FeedBack and STEP are checked again. Dynamics uses uniform2.4m pipes without a measured compressor map. Numerical convergence does not establish physical accuracy.

Next:3D thermal/contact seat model,hot-leak and dirty-dashpot tests,piston/guard joint qualification and spring fatigue. Historical drawings and weight sheet remain open.