TEXTTOCADTeaching AI to make things
RU Graphite

TextToCAD engineering catalog

ARGON+

Ten engineering projects with CAD models, interactive showcases, and technical and economic parameters.

Configurations R07 ARGON V2 front three-quarter view with a transparent green body
V1 panel_fit / V2 rear_cover
10

offline showcasesOne per project. Opens from disk.

10

projects with point-to-point flightLLTV supports routes with 2–6 points and a final landing.

10

CAD atlases with recordsOverviews, sections, revisions and sources.

30

cost scenariosLow, base and high estimates for each project.

Showcases and CAD

Explore the projects

Technical and Economic Parameters

Download CSV

734 parameter rows across ten projects. Each entry gives the value, revision, conditions and sources.

RUB million · pre-tax target prices

Cost Estimate and Target Prices

Open Excel

The summary shows manufacturing, one-time preparation and target prices. Open a project’s cost breakdown to review line items, supplier prices, engineering estimates and assumptions. Quantity, margin and commission apply to all 30 scenarios.

Scenario settings

How the Price Is Calculated

Add the allocated preparation cost to the manufacturing cost per unit. Divide the total by the share of revenue remaining after margin and commission.

Cost estimate for ten projects in RUB million
Project and scopeUnit manufacturingOne-time preparationProgramme costTarget unit price

The main figure is the base scenario. The range in brackets gives the low and high estimates. DEMO denotes planning assumptions with open inputs. For historical reconstructions, see the supplied scope in each row.

Documents and Evidence

Documents and Materials

Showcase