IMPULSE · R11B/R06
Technical and economic data
IMPULSE AWD and RWD parameters for revision R06, flight scenarios and costs. A dash means that the value is unavailable or undefined for that variant.
HOLD Stock R06 stays on its wheels. The 5 m / 25 m profile and flight to a point are conditional calculations.
Reading the status labels
- R06 CAD
- Geometry or labels in the saved assembly.
- R06 calculation
- Inputs or results from an R06 model or check.
- Conditional case
- Result under stated assumptions.
- R11B archive
- An earlier calculation or cost estimate.
- Open
- Pending input or verification.
Showing 116 of 116
No matches. Change the search or filters.
Scroll the table right for status and sources.
| Parameter | Unit | AWD | RWD | Status | Scope and sources |
|---|---|---|---|---|---|
| Geometry and running gear | |||||
| Length | mm | 4 294 | 4 294 | R06 CAD | Envelope of 257 exterior BReps and four tyres in their neutral position. |
| Width | mm | 1 950 | 1 950 | R06 CAD | Envelope of 257 exterior BReps and four tyres in their neutral position. |
| Height | mm | 1 093 | 1 093 | R06 CAD | Envelope of 257 exterior BReps and four tyres in their neutral position. |
| Wheelbase | mm | 2 700 | 2 700 | R06 CAD | Nominal tyre centre spacing. |
| Front track | mm | 1 640 | 1 640 | R06 CAD | Nominal tyre centre spacing. |
| Rear track | mm | 1 640 | 1 640 | R06 CAD | Nominal tyre centre spacing. |
| Front track in the sweep | mm | 1640 / 1648 | 1640 / 1648 | R06 calculation | Two checked track settings. |
| Tyre outside diameter × width | mm | 650 × 210 / 650 × 210 | 650 × 210 / 650 × 210 | R06 CAD | Front / rear, neutral CAD envelope. |
| Checked front suspension travel | mm | −210…+40 | −210…+40 | R06 calculation | Discrete tyre positions in the landing-package check. |
| Checked front wheel steering angle | ° | ±18 | ±18 | R06 calculation | Extremes of the checked grid. |
| Smallest checked static landing-package clearance | mm | 4.22 | 4.22 | R06 calculation | To a nearby fixed part in the checked sample. |
| Loaded ground clearance | mm | — | — | Open | Requires the loaded ride state and a measurement. |
| Mass and centre of gravity | |||||
| Estimated mass without driver or nitrogen | kg | 2 091.04 | 1 991.57 | R06 calculation | R06 budget inherited from R05. Other included components and allowances stay in the budget. |
| Estimated fully charged mass without driver | kg | 2 229.05 | 2 129.58 | R06 calculation | R06 budget inherited from R05. Other included components and allowances stay in the budget. |
| Model start mass with nitrogen and driver | kg | 2 327.05 | 2 227.58 | R06 calculation | R06 reference case used for weight and calculated trajectories. |
| Driver allowance | kg | 98 | 98 | R06 calculation | Source ledger allowance used by the model. |
| Nitrogen in the start mass budget | kg | 138.01 | 138.01 | R06 calculation | 125 kg in the original vessel allowance plus 13.01 kg in the nose bank. |
| Weight force at model start | kN | 22.82 | 21.85 | R06 calculation | Reference case. |
| CG X, forward | mm | −176.2 | −244.0 | R06 calculation | Relative to the R06 origin. |
| CG Y, left | mm | −6.2 | −6.5 | R06 calculation | Relative to the R06 origin. |
| CG Z, up | mm | 352.9 | 353.6 | R06 calculation | Relative to the R06 origin. |
| Measured mass and axle loads | kg | — | — | Open | Requires a weighed prototype with a recorded charge state. |
| Electrical power and range | |||||
| Nominal battery energy on CAD label | kWh | 30 | 30 | R06 CAD | BatteryCase label. Cell selection and specification are open. |
| Battery voltage on CAD label | V | 800 | 800 | R06 CAD | CAD label nominal. |
| Usable battery energy in R11B range study | kWh | 24 | — | R11B archive | Earlier AWD central assumption. The adverse case used 21 kWh. |
| Traction motors | count | 4 | 2 | R06 CAD | RWD traction hardware is on the rear axle. |
| Shaft power cap in the R11B EV case | kW | 921.2 | — | R11B archive | Assumption of the earlier central AWD model. |
| Range at 60 km/h with fans off | km | 130.93 | — | R11B archive | Earlier AWD, assumed 24 kWh usable and steady speed. |
| Range at 60 km/h with continuous downforce | km | 21.25 | — | R11B archive | Earlier AWD, assumed 24 kWh usable and steady speed. |
| Downforce in central / adverse cases | kN | 48.50 / 34.23 | — | R11B archive | Steady leakage and fan model at a 0.75 mm gap. |
| R06 available peak / continuous electrical power | kW | — | — | Open | Requires selected cells and current, temperature and voltage maps under load. |
| Validated R06 nominal / usable battery energy | kWh | — | — | Open | Requires the selected pack specification and usable-energy measurement over a defined SOC range. |
| Battery recharge time and DC power | min / kW | — | — | Open | Requires a defined SOC band, charge profile and cooling test. |
| Acceleration and ground dynamics | |||||
| 0–100 km/h on EV power · R06 | s | 2.89 / 4.23 | 4.34 / 6.74 | Conditional case | Base / adverse cases. Standing start with fans off. |
| 0–100 km/h on EV power with rear boost · R06 | s | 2.56 / 3.86 | 3.88 / 6.17 | Conditional case | Base / adverse cases. Standing start with fans off. |
| Sprint model start mass | kg | 2 318.45 | 2 218.97 | Conditional case | 98 kg driver. Stock nitrogen mass from Span at 49.05 MPa and 20 °C. |
| Wheel power cap in the sprint | kW | 894 | 485 | Conditional case | Base case. Assumed electrical supply, motor ratings and 97% gear efficiency. |
| Distance to 100 km/h on EV power | m | 40.3 / 59.1 | 60.6 / 94.6 | Conditional case | Base / adverse cases. Standing start with fans off. |
| Distance to 100 km/h with rear boost | m | 38.9 / 58.0 | 59.3 / 93.5 | Conditional case | Base / adverse cases. Standing start with fans off. |
| Initial HP-A rear thrust | kN | 16.78 / 11.75 | 16.78 / 11.75 | Conditional case | Base / adverse cases. Four rear nozzles assumed. |
| Rear boost duration | s | 0.584 / 0.600 | 0.584 / 0.600 | Conditional case | Base / adverse cases. Ends at 0.6 s or the 25 MPa model cutoff. |
| HP-A nitrogen used per sprint | kg | 11.62 / 8.86 | 11.62 / 8.86 | Conditional case | Base / adverse cases. Standing start with fans off. |
| 0–100 km/h on EV power · earlier AWD | s | 2.89 / 4.23 | — | R11B archive | Central / adverse calculations over 0–100 km/h. |
| 0–100 km/h with rear boost · earlier AWD | s | 2.51 / 3.68 | — | R11B archive | Central / adverse calculations over 0–100 km/h. |
| 0–100 km/h with boost and fans · earlier AWD | s | 1.41 / 2.32 | — | R11B archive | Central / adverse calculations over 0–100 km/h. |
| Nitrogen used by the earlier rear boost | kg | 12.88 | — | R11B archive | Earlier AWD central case. |
| R06 top speed | km/h | — | — | Open | Requires a power and drag map. |
| R06 drive-cycle electrical consumption | kWh/100 km | — | — | Open | Requires a defined cycle for each drive and a record of fan use. |
| Stopping distance from 100 km/h | m | — | — | Open | Requires defined tyres, surface and load. |
| Nitrogen, vessels and refilling | |||||
| Stock HP-A nominal volume | L | 130 | 130 | R06 calculation | T101/T102/T201/T202 model inputs: 65 / 65 / 100 / 50 L. |
| Stock HP-B nominal volume | L | 150 | 150 | R06 calculation | T101/T102/T201/T202 model inputs: 65 / 65 / 100 / 50 L. |
| Four stock vessels, nominal total | L | 280 | 280 | R06 calculation | T101/T102/T201/T202 model inputs: 65 / 65 / 100 / 50 L. |
| Nose bank internal volume | L | 31.29 | 31.29 | R06 calculation | Two added vessels. The collector is outside this volume. |
| Stock nominal plus nose internal volume | L | 311.29 | 311.29 | R06 calculation | Geometric sum. Circuit availability is handled separately. |
| Calculated initial pressure | MPa | 49.05 | 49.05 | R06 calculation | Nitrogen model at 20 °C initial temperature. |
| Assumed inventory cutoff pressure | MPa | 25 | 25 | R06 calculation | Parameter of the usable inventory calculation. |
| Nitrogen in fully charged nose bank | kg | 13.01 | 13.01 | R06 calculation | At the model initial charge. |
| Usable nose bank nitrogen to cutoff | kg | 2.80 | 2.80 | R06 calculation | Calculated down to 25 MPa. Collector outlets are capped. |
| Combined calculated inventory to cutoff | kg | 27.83 | 27.83 | Conditional case | Assumes pooled storage in the check. |
| Initial stock HP-B discharge | kg/s | 30.91 | 30.91 | R06 calculation | Aggregate PR case at Cd = 0.95. Discharge for thrust. |
| Average nitrogen refill rate · scenarios | kg/min | 0.5 / 1.0 / 2.0 | 0.5 / 1.0 / 2.0 | Conditional case | Slow / base / fast scenarios. Assumed average net flow into the vessels. |
| HP-A refill time after one sprint | min | 23.2 / 11.6 / 5.8 | 23.2 / 11.6 / 5.8 | Conditional case | Base boosted run. Values at 0.5 / 1 / 2 kg/min. Gas-transfer time. |
| 280 L refill time from 25 to 49.05 MPa | min | 85.5 / 42.8 / 21.4 | 85.5 / 42.8 / 21.4 | Conditional case | Initial and final states at 20 °C. Values at 0.5 / 1 / 2 kg/min. |
| Nitrogen to top up the stock 280 L | kg | 42.75 | 42.75 | Conditional case | Mass difference between 25 and 49.05 MPa, both at 20 °C, with the Span EOS. |
| Full nitrogen mass in stock 280 L from Span | kg | 116.40 | 116.40 | Conditional case | At 49.05 MPa and 20 °C. The original vehicle mass ledger uses a separate 125 kg allowance. |
| Nose bank top-up time on a separate bench | min | 9.6 / 4.8 / 2.4 | 9.6 / 4.8 / 2.4 | Conditional case | 25 to 49.05 MPa at 20 °C, 0.5 / 1 / 2 kg/min. CAD collector ports are capped. |
| Candidate HP-A refill station | Hydro-Pac LX C12-40-10500LX | Hydro-Pac LX C12-40-10500LX | Conditional case | Stationary package for vendor quotation. The booster chart lists 83 scfm N₂ at 2,000 psig suction. | |
| Required net flow into HP-A | kg/min | 2.40 | 2.40 | Conditional case | Quote target. Average through restoration of full inventory after a base pulse. |
| Gas-transfer time after a base pulse | min | 4.84 | 4.84 | Conditional case | 11.62 kg at 2.40 kg/min. Cooling and leak check are in the full cycle below. |
| Cooling and stabilisation allowance | min | 6 | 6 | Conditional case | Assumption for both vessels. At 2.40 kg/min the 20-minute limit allows 7.16 min. |
| HP-A leak-check allowance | min | 4 | 4 | Conditional case | Budget for a validated between-run check. Method and sensitivity require approval. |
| HP-A recovery after sprint · total cycle | min | 18.84 | 18.84 | Conditional case | At 2.40 kg/min, 6 min cooling and 4 min leak check. Includes return, connection and release. |
| Margin to 20 minutes | min | 1.16 | 1.16 | Conditional case | Margin for the budgeted cycle. The slow-cooling case takes 28.96 min. |
| Readiness limit for each scored cycle | min | 20 | 20 | Conditional case | Target for 10 out of 10 attempts. Includes return, cooling, leak check and release. |
| Physical HP-A bench attempts | of 10 | 0 | 0 | Open | Bench programme prepared. Scored measurements are pending. |
| Measured HP-A recovery time across the series | min | — | — | Open | Requires ten raw attempt records, signed approval and the acceptance decision. |
| Measured refill rate and turnaround | kg/min · min | — | — | Open | Requires a selected station and measurements of net flow, thermal stability and leak-check time. |
| Vessel working pressure and life | MPa / cycles | — | — | Open | Requires an approved vessel specification and life validation. |
| Liftoff, flight and touchdown | |||||
| Initial stock lift thrust | kN | 21.13 | 21.13 | R06 calculation | Reference R06, PR / Cd 0.95. |
| Stock thrust minus weight | kN | −1.69 | −0.71 | R06 calculation | Lift force minus weight. Negative values prevent liftoff. |
| CG hop height from level ground, stock | m | 0 | 0 | R06 calculation | The reference model remains grounded. |
| Stock airborne time | s | 0 | 0 | R06 calculation | The reference model remains grounded. |
| Stock airborne distance from rest | m | 0 | 0 | R06 calculation | The reference model remains grounded. |
| Height in the ideal sensitivity run | mm | 0.000 | 0.389 | Conditional case | Independent paths, Cd = 1. Small-model CG rise for RWD in this sensitivity run. |
| Time in the ideal sensitivity run | s | 0.000 | 0.123 | Conditional case | Independent paths, Cd = 1. Wheel contact dynamics are outside the model. |
| Ballistic hop off a ramp or obstacle | m | — | — | Open | Requires the profile, entry speed, contact and attitude model. |
| Stock airborne speed | km/h | — | — | Open | The reference model remains grounded. Airspeed is undefined. |
| Target CG rise | m | 5.0 | 5.0 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Target distance | m | 25.0 | 25.0 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Airborne time in the target profile | s | 2.646 | 2.646 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Horizontal speed in the 3D replay | km/h | 34.01 | 34.01 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Vertical touchdown speed downward | m/s | 2.50 | 2.50 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Initial ascent thrust | kN | 45.64 | 43.69 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Flow at the end of braking | kg/s | 73.15 | 70.03 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Calculated nitrogen use over the manoeuvre | kg | 89.19 | 85.38 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Landing demand with 15% reserve | kg | 40.83 | 39.08 | Conditional case | 5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed. |
| Touchdown after an imposed 5 m apex | m/s | 7.02 | 6.88 | R06 calculation | Vertical speed downward for the best tested single pulse in the existing path. |
| Residual pressure inventory ceiling / flow floor | MPa | 5.20 / 13.46 | 5.88 / 12.68 | Conditional case | Inventory ceiling / flow floor. Limits do not overlap at F/ṁ = 690 m/s and Cd = 1. |
| Free-flight gate | HOLD | HOLD | Open | Flow, attitude, landing bank retention and contact remain open. | |
| Point flight | |||||
| Manoeuvre time from rest | s | 6.939 | 6.939 | Conditional case | Separate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply. |
| X at the support plane | m | 25.00 | 25.00 | Conditional case | Separate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply. |
| Trajectory apex | m | 5.00 | 5.00 | Conditional case | Separate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply. |
| Downward speed at the support plane | m/s | 0.645 | 0.645 | Conditional case | Separate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply. |
| Peak requested total force | kN | 32.09 | 30.71 | Conditional case | Separate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply. |
| Equivalent nitrogen use | kg | 253.61 | 242.77 | Conditional case | Separate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply. |
| Cost and operations | |||||
| Hardware, Russia central estimate | RUB mn | 53.88 | 47.41 | R11B archive | 14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration. |
| Tooling, Russia central estimate | RUB mn | 4.42 | 4.42 | R11B archive | 14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration. |
| Bench equipment, Russia central estimate | RUB mn | 1.32 | 1.32 | R11B archive | 14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration. |
| Hardware plus tooling, Russia central estimate | RUB mn | 58.30 | 51.84 | R11B archive | 14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration. |
| Hardware, tooling and bench, Russia estimate | RUB mn | 59.62 | 53.16 | R11B archive | 14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration. |
| Hardware and tooling, Russia low / high estimate | RUB mn | 25.87 / 90.73 | 22.29 / 81.38 | R11B archive | Source cost bands for supplier and fabrication choices in the earlier quote set. |
| R06 build cost | RUB mn | — | — | Open | Requires an approved R06 BOM, labour and supplier quotations. |
| Development and testing | RUB mn | — | — | Open | Estimate follows the agreed bench, test and qualification programme. |
| Gas and electricity cost per cycle | RUB/cycle | — | — | Open | Requires actual consumption, tariffs, preparation losses and cycle definition. |
| Maintenance and replacement interval | cycles / h | — | — | Open | Requires life tests of vessels, valves, battery and running gear. |
| Cost per verified run | RUB/run | — | — | Open | Requires programme costs, operating costs and the repeat-run success rate. |