TextToCAD

IMPULSE · R11B/R06

Technical and economic data

IMPULSE AWD and RWD parameters for revision R06, flight scenarios and costs. A dash means that the value is unavailable or undefined for that variant.

HOLD Stock R06 stays on its wheels. The 5 m / 25 m profile and flight to a point are conditional calculations.

Reading the status labels
R06 CAD
Geometry or labels in the saved assembly.
R06 calculation
Inputs or results from an R06 model or check.
Conditional case
Result under stated assumptions.
R11B archive
An earlier calculation or cost estimate.
Open
Pending input or verification.
Showing 116 of 116

Scroll the table right for status and sources.

ParameterUnitAWDRWDStatusScope and sources
Geometry and running gear
Lengthmm4 2944 294R06 CADEnvelope of 257 exterior BReps and four tyres in their neutral position.
Widthmm1 9501 950R06 CADEnvelope of 257 exterior BReps and four tyres in their neutral position.
Heightmm1 0931 093R06 CADEnvelope of 257 exterior BReps and four tyres in their neutral position.
Wheelbasemm2 7002 700R06 CADNominal tyre centre spacing.
Front trackmm1 6401 640R06 CADNominal tyre centre spacing.
Rear trackmm1 6401 640R06 CADNominal tyre centre spacing.
Front track in the sweepmm1640 / 16481640 / 1648R06 calculationTwo checked track settings.
Tyre outside diameter × widthmm650 × 210 / 650 × 210650 × 210 / 650 × 210R06 CADFront / rear, neutral CAD envelope.
Checked front suspension travelmm−210…+40−210…+40R06 calculationDiscrete tyre positions in the landing-package check.
Checked front wheel steering angle°±18±18R06 calculationExtremes of the checked grid.
Smallest checked static landing-package clearancemm4.224.22R06 calculationTo a nearby fixed part in the checked sample.
Loaded ground clearancemm——OpenRequires the loaded ride state and a measurement.
Mass and centre of gravity
Estimated mass without driver or nitrogenkg2 091.041 991.57R06 calculationR06 budget inherited from R05. Other included components and allowances stay in the budget.
Estimated fully charged mass without driverkg2 229.052 129.58R06 calculationR06 budget inherited from R05. Other included components and allowances stay in the budget.
Model start mass with nitrogen and driverkg2 327.052 227.58R06 calculationR06 reference case used for weight and calculated trajectories.
Driver allowancekg9898R06 calculationSource ledger allowance used by the model.
Nitrogen in the start mass budgetkg138.01138.01R06 calculation125 kg in the original vessel allowance plus 13.01 kg in the nose bank.
Weight force at model startkN22.8221.85R06 calculationReference case.
CG X, forwardmm−176.2−244.0R06 calculationRelative to the R06 origin.
CG Y, leftmm−6.2−6.5R06 calculationRelative to the R06 origin.
CG Z, upmm352.9353.6R06 calculationRelative to the R06 origin.
Measured mass and axle loadskg——OpenRequires a weighed prototype with a recorded charge state.
Electrical power and range
Nominal battery energy on CAD labelkWh3030R06 CADBatteryCase label. Cell selection and specification are open.
Battery voltage on CAD labelV800800R06 CADCAD label nominal.
Usable battery energy in R11B range studykWh24—R11B archiveEarlier AWD central assumption. The adverse case used 21 kWh.
Traction motorscount42R06 CADRWD traction hardware is on the rear axle.
Shaft power cap in the R11B EV casekW921.2—R11B archiveAssumption of the earlier central AWD model.
Range at 60 km/h with fans offkm130.93—R11B archiveEarlier AWD, assumed 24 kWh usable and steady speed.
Range at 60 km/h with continuous downforcekm21.25—R11B archiveEarlier AWD, assumed 24 kWh usable and steady speed.
Downforce in central / adverse caseskN48.50 / 34.23—R11B archiveSteady leakage and fan model at a 0.75 mm gap.
R06 available peak / continuous electrical powerkW——OpenRequires selected cells and current, temperature and voltage maps under load.
Validated R06 nominal / usable battery energykWh——OpenRequires the selected pack specification and usable-energy measurement over a defined SOC range.
Battery recharge time and DC powermin / kW——OpenRequires a defined SOC band, charge profile and cooling test.
Acceleration and ground dynamics
0–100 km/h on EV power · R06s2.89 / 4.234.34 / 6.74Conditional caseBase / adverse cases. Standing start with fans off.
0–100 km/h on EV power with rear boost · R06s2.56 / 3.863.88 / 6.17Conditional caseBase / adverse cases. Standing start with fans off.
Sprint model start masskg2 318.452 218.97Conditional case98 kg driver. Stock nitrogen mass from Span at 49.05 MPa and 20 °C.
Wheel power cap in the sprintkW894485Conditional caseBase case. Assumed electrical supply, motor ratings and 97% gear efficiency.
Distance to 100 km/h on EV powerm40.3 / 59.160.6 / 94.6Conditional caseBase / adverse cases. Standing start with fans off.
Distance to 100 km/h with rear boostm38.9 / 58.059.3 / 93.5Conditional caseBase / adverse cases. Standing start with fans off.
Initial HP-A rear thrustkN16.78 / 11.7516.78 / 11.75Conditional caseBase / adverse cases. Four rear nozzles assumed.
Rear boost durations0.584 / 0.6000.584 / 0.600Conditional caseBase / adverse cases. Ends at 0.6 s or the 25 MPa model cutoff.
HP-A nitrogen used per sprintkg11.62 / 8.8611.62 / 8.86Conditional caseBase / adverse cases. Standing start with fans off.
0–100 km/h on EV power · earlier AWDs2.89 / 4.23—R11B archiveCentral / adverse calculations over 0–100 km/h.
0–100 km/h with rear boost · earlier AWDs2.51 / 3.68—R11B archiveCentral / adverse calculations over 0–100 km/h.
0–100 km/h with boost and fans · earlier AWDs1.41 / 2.32—R11B archiveCentral / adverse calculations over 0–100 km/h.
Nitrogen used by the earlier rear boostkg12.88—R11B archiveEarlier AWD central case.
R06 top speedkm/h——OpenRequires a power and drag map.
R06 drive-cycle electrical consumptionkWh/100 km——OpenRequires a defined cycle for each drive and a record of fan use.
Stopping distance from 100 km/hm——OpenRequires defined tyres, surface and load.
Nitrogen, vessels and refilling
Stock HP-A nominal volumeL130130R06 calculationT101/T102/T201/T202 model inputs: 65 / 65 / 100 / 50 L.
Stock HP-B nominal volumeL150150R06 calculationT101/T102/T201/T202 model inputs: 65 / 65 / 100 / 50 L.
Four stock vessels, nominal totalL280280R06 calculationT101/T102/T201/T202 model inputs: 65 / 65 / 100 / 50 L.
Nose bank internal volumeL31.2931.29R06 calculationTwo added vessels. The collector is outside this volume.
Stock nominal plus nose internal volumeL311.29311.29R06 calculationGeometric sum. Circuit availability is handled separately.
Calculated initial pressureMPa49.0549.05R06 calculationNitrogen model at 20 °C initial temperature.
Assumed inventory cutoff pressureMPa2525R06 calculationParameter of the usable inventory calculation.
Nitrogen in fully charged nose bankkg13.0113.01R06 calculationAt the model initial charge.
Usable nose bank nitrogen to cutoffkg2.802.80R06 calculationCalculated down to 25 MPa. Collector outlets are capped.
Combined calculated inventory to cutoffkg27.8327.83Conditional caseAssumes pooled storage in the check.
Initial stock HP-B dischargekg/s30.9130.91R06 calculationAggregate PR case at Cd = 0.95. Discharge for thrust.
Average nitrogen refill rate · scenarioskg/min0.5 / 1.0 / 2.00.5 / 1.0 / 2.0Conditional caseSlow / base / fast scenarios. Assumed average net flow into the vessels.
HP-A refill time after one sprintmin23.2 / 11.6 / 5.823.2 / 11.6 / 5.8Conditional caseBase boosted run. Values at 0.5 / 1 / 2 kg/min. Gas-transfer time.
280 L refill time from 25 to 49.05 MPamin85.5 / 42.8 / 21.485.5 / 42.8 / 21.4Conditional caseInitial and final states at 20 °C. Values at 0.5 / 1 / 2 kg/min.
Nitrogen to top up the stock 280 Lkg42.7542.75Conditional caseMass difference between 25 and 49.05 MPa, both at 20 °C, with the Span EOS.
Full nitrogen mass in stock 280 L from Spankg116.40116.40Conditional caseAt 49.05 MPa and 20 °C. The original vehicle mass ledger uses a separate 125 kg allowance.
Nose bank top-up time on a separate benchmin9.6 / 4.8 / 2.49.6 / 4.8 / 2.4Conditional case25 to 49.05 MPa at 20 °C, 0.5 / 1 / 2 kg/min. CAD collector ports are capped.
Candidate HP-A refill stationHydro-Pac LX C12-40-10500LXHydro-Pac LX C12-40-10500LXConditional caseStationary package for vendor quotation. The booster chart lists 83 scfm N₂ at 2,000 psig suction.
Required net flow into HP-Akg/min2.402.40Conditional caseQuote target. Average through restoration of full inventory after a base pulse.
Gas-transfer time after a base pulsemin4.844.84Conditional case11.62 kg at 2.40 kg/min. Cooling and leak check are in the full cycle below.
Cooling and stabilisation allowancemin66Conditional caseAssumption for both vessels. At 2.40 kg/min the 20-minute limit allows 7.16 min.
HP-A leak-check allowancemin44Conditional caseBudget for a validated between-run check. Method and sensitivity require approval.
HP-A recovery after sprint · total cyclemin18.8418.84Conditional caseAt 2.40 kg/min, 6 min cooling and 4 min leak check. Includes return, connection and release.
Margin to 20 minutesmin1.161.16Conditional caseMargin for the budgeted cycle. The slow-cooling case takes 28.96 min.
Readiness limit for each scored cyclemin2020Conditional caseTarget for 10 out of 10 attempts. Includes return, cooling, leak check and release.
Physical HP-A bench attemptsof 1000OpenBench programme prepared. Scored measurements are pending.
Measured HP-A recovery time across the seriesmin——OpenRequires ten raw attempt records, signed approval and the acceptance decision.
Measured refill rate and turnaroundkg/min · min——OpenRequires a selected station and measurements of net flow, thermal stability and leak-check time.
Vessel working pressure and lifeMPa / cycles——OpenRequires an approved vessel specification and life validation.
Liftoff, flight and touchdown
Initial stock lift thrustkN21.1321.13R06 calculationReference R06, PR / Cd 0.95.
Stock thrust minus weightkN−1.69−0.71R06 calculationLift force minus weight. Negative values prevent liftoff.
CG hop height from level ground, stockm00R06 calculationThe reference model remains grounded.
Stock airborne times00R06 calculationThe reference model remains grounded.
Stock airborne distance from restm00R06 calculationThe reference model remains grounded.
Height in the ideal sensitivity runmm0.0000.389Conditional caseIndependent paths, Cd = 1. Small-model CG rise for RWD in this sensitivity run.
Time in the ideal sensitivity runs0.0000.123Conditional caseIndependent paths, Cd = 1. Wheel contact dynamics are outside the model.
Ballistic hop off a ramp or obstaclem——OpenRequires the profile, entry speed, contact and attitude model.
Stock airborne speedkm/h——OpenThe reference model remains grounded. Airspeed is undefined.
Target CG risem5.05.0Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Target distancem25.025.0Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Airborne time in the target profiles2.6462.646Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Horizontal speed in the 3D replaykm/h34.0134.01Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Vertical touchdown speed downwardm/s2.502.50Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Initial ascent thrustkN45.6443.69Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Flow at the end of brakingkg/s73.1570.03Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Calculated nitrogen use over the manoeuvrekg89.1985.38Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Landing demand with 15% reservekg40.8339.08Conditional case5 m / 25 m profile. Thrust cap 2× weight, F/ṁ = 600 m/s. Initial horizontal speed is prescribed.
Touchdown after an imposed 5 m apexm/s7.026.88R06 calculationVertical speed downward for the best tested single pulse in the existing path.
Residual pressure inventory ceiling / flow floorMPa5.20 / 13.465.88 / 12.68Conditional caseInventory ceiling / flow floor. Limits do not overlap at F/ṁ = 690 m/s and Cd = 1.
Free-flight gateHOLDHOLDOpenFlow, attitude, landing bank retention and contact remain open.
Point flight
Manoeuvre time from rests6.9396.939Conditional caseSeparate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply.
X at the support planem25.0025.00Conditional caseSeparate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply.
Trajectory apexm5.005.00Conditional caseSeparate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply.
Downward speed at the support planem/s0.6450.645Conditional caseSeparate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply.
Peak requested total forcekN32.0930.71Conditional caseSeparate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply.
Equivalent nitrogen usekg253.61242.77Conditional caseSeparate from-rest model, X=25 m, Y=0, height 5 m, heading 0°. Assumes sufficient supply.
Cost and operations
Hardware, Russia central estimateRUB mn53.8847.41R11B archive14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration.
Tooling, Russia central estimateRUB mn4.424.42R11B archive14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration.
Bench equipment, Russia central estimateRUB mn1.321.32R11B archive14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration.
Hardware plus tooling, Russia central estimateRUB mn58.3051.84R11B archive14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration.
Hardware, tooling and bench, Russia estimateRUB mn59.6253.16R11B archive14 Nov 2026, 188 items. Second variant is RWD_GAS 01.3. Earlier release configuration.
Hardware and tooling, Russia low / high estimateRUB mn25.87 / 90.7322.29 / 81.38R11B archiveSource cost bands for supplier and fabrication choices in the earlier quote set.
R06 build costRUB mn——OpenRequires an approved R06 BOM, labour and supplier quotations.
Development and testingRUB mn——OpenEstimate follows the agreed bench, test and qualification programme.
Gas and electricity cost per cycleRUB/cycle——OpenRequires actual consumption, tariffs, preparation losses and cycle definition.
Maintenance and replacement intervalcycles / h——OpenRequires life tests of vessels, valves, battery and running gear.
Cost per verified runRUB/run——OpenRequires programme costs, operating costs and the repeat-run success rate.