VEKTOR E-26 · TextToCAD

Documents and work

31 material records and a full file inventory from the release snapshot. Filter by category and relevance.

31 / 31

Parameters and calculations

Current release · R11P–R13

Performance and cost passport

86 rows including 23 R13 entries, with conditions and outstanding measurements.

Historical release · R12E

Lift-off and first contact

Original separately released flight calculation.

Historical release · R12E

Landing and skirt contact

Initial landing contact study.

Historical release · R12F · HOLD

Landing revision R12F

Skirt and suspension travel.

Historical release · R12G · HOLD

Landing revision R12G

Load-path design and Ø28 pins.

Historical release · R12H · HOLD

Landing revision R12H

Axial pin retention, struts and mounts.

Historical release · R12I · HOLD

Landing revision R12I

Rear pivot, vibration and load transfer.

CAD and atlases

Revision-specific evidence · R12J

Seat and native geometry baseline

Seat layout, CAD and a 24-sheet engineering atlas.

Demonstrations

Current release · R12A–R13

Showcase overview

Entry point for current demos, documents and releases.

Revision-specific evidence · R12E–R12I

3D flight and landing replays

26 historical scenarios in the current interface.

Revision-specific evidence · R12J

3D component inspection

Component selection, zoom and highlighting.

Revision-specific evidence · R12A / R11P

Ground scenarios and servicing

Four ground scenarios and service modes.

AIR and engineering checks

Revision-specific evidence · R12E

AIR R01: cartridge removal and tool access

Removal and refitting checked against a 0.50 mm budget. Physical validation is open.

Historical release · R12B

AIR R01 · R12B

Incremental development of ducting, removal path or hardware.

Historical release · R12C

AIR R01 · R12C

Incremental development of ducting, removal path or hardware.

Historical release · R12D

AIR R01 · R12D

Incremental development of ducting, removal path or hardware.

Specification, experts and economics

Revision-specific evidence · R11P · 14.11.2026

Russia and Texas estimates

R11P regional estimate. Full R13 programme cost remains open.

Reference · R02

Expert questions and responses

Questionnaire, register, coverage and evidence matrix.

Reference · V01

Options-based specification and plan

Candidate targets and acceptance conditions.

Media and publications

Revision-specific evidence · R12E / R12F · RU/EN

Videos

Flight, touchdown, landing and comparison footage.

Conversation history

Archives and QA