TextToCAD

TURBOLET R5 flight

Liftoff, hover, translation and landing. The 3D museum reconstruction follows simulated TextToCAD telemetry.

TURBOLET R5 point-to-point flight · Manual positioning

DEMO
Ground grid · 1 m

Telemetry over time

Simulation result

DEMO · Numbers describe the selected simulation. Actual hover endurance and range remain OPEN.

Evidence and files

R5 museum configuration

Monino, reference photograph from 30 May 2013. The static assembly includes strut boots and red exhibit pads; flight playback omits the pads.

Museum CAD envelope
10.000 × 10.000 × 3.821 m
Opposed strut axes in CAD
3.600 m
Installed engine record
RD‑9BP / BL · OPEN
R5 assembly
R5 assembly
R5 exploded view
R5 exploded view
Wiring and cable entries
Wiring and cable entries

Fuel endurance

Sustained hover time
OPEN
Fuel-limited range
OPEN
RD‑9BP/BL hover fuel flow
OPEN
Usable remaining fuel and reserve
OPEN

Published figures report 400 L total tank capacity and a 350 kg historic fuel load. R5 needs fuel flow and usable fuel remaining by phase of the same flight.

Flight overview video

Video of the nominal R1 simulation. The interactive timeline above displays simulated time.

Video · manual control and landing

Model scope and wiring

The trajectory assumes fixed mass and illustrative thrust and moment controls. CAD shows the temperature sensor wiring, cable entries and cockpit loom. Historical pin assignments and thermal characteristics remain OPEN.

Data and verification