TextToCAD

TURBOLET R5 engineering atlas

Museum reconstruction of the flying test rig. Assembly views, systems and verifiable data for one R5 assembly.

TURBOLET R5 assemblyTURBOLET R5 assembly

Assembly views

TextToCADTURBOLET / R5 / 01

Front three-quarter view

CAD R5 · 01
Front three-quarter viewFront three-quarter view

The museum assembly rests on four supports. The vertical engine, cockpit, truss, tail and red display pads are visible.

TextToCADTURBOLET / R5 / 02

Rear three-quarter view

CAD R5 · 02
Rear three-quarter viewRear three-quarter view

The fin, tailplane and side surfaces are shown in R5 CAD. Historical tail contours and incidence angles remain OPEN.

TextToCADTURBOLET / R5 / 03

Plan and layout axes

CAD R5 · 03
Plan and layout axesPlan and layout axes

Top view. X points toward the cockpit and Y points left. The visible CAD plan envelope is 10,000 × 10,000 mm.

TextToCADTURBOLET / R5 / 04

Profile and support span

CAD R5 · 04
Profile and support spanProfile and support span

The visible museum CAD assembly is 3,820.809 mm high including the pads. Opposed strut axes are 3,600 mm apart. Museum measurements remain OPEN.

Assembly structure

TextToCADTURBOLET / R5 / 05

Assembly build-up

CAD R5 · 05
Truss and booms
Truss and boomsTruss and booms
Equipment and supports
Equipment and supportsEquipment and supports
Complete R5 assembly
Complete R5 assemblyComplete R5 assembly

The truss, main equipment and complete assembly share one orthographic camera. The sequence explains how the assembly is organised.

TextToCADTURBOLET / R5 / 06

Subsystem exploded view

CAD R5 · 06
Subsystem exploded viewSubsystem exploded view

Offsets for the engine, cockpit, tanks, supports, tail, tip nozzles and wiring are recorded. The separation explains layout; the removal sequence remains OPEN.

Sections and details

TextToCADTURBOLET / R5 / 07

Longitudinal assembly section

CAD R5 · 07
Longitudinal assembly sectionLongitudinal assembly section

Native FreeCAD view clipped at Y = 0 mm, retaining Y ≥ 0. The plane passes through the engine axis and the cockpit longitudinal plane.

TextToCADTURBOLET / R5 / 08

Engine exterior and section

CAD R5 · 08
Exterior
ExteriorExterior
Section Y = 0 mm
Section Y = 0 mmSection Y = 0 mm

Both views use the same part selection and scale. The right view is clipped at Y = 0 mm, retaining Y ≥ 0. Internal geometry is reconstructed; the RD‑9BP/BL engine record remains OPEN.

RD‑9 colour cutaway in museum R5
Engine components highlighted by colour
Blue denotes inlet and compressor. Orange denotes the combustion chamber. Purple denotes the turbine. See the sheet for the complete legend.

Annotated sheet (RU) · FreeCAD record · R5 report

DEMO R5 manual control and landing

OPEN · Vane angles and effectiveness, nozzle operation, gas and fuel flow, hover endurance and range.

DEMO · R5 manual control and landing · Video in the HTML atlas
00:13 Jet vanes · 00:21 Front boom nozzle · 00:29 Side boom nozzle · 00:44 Approach and landing
OPEN · Vane angles and effectiveness, nozzle operation, gas and fuel flow, hover endurance and range.

TextToCADTURBOLET / R5 / 09

Tanks and fuel supply

CAD R5 · 09
Tanks and fuel supplyTanks and fuel supply

Tank bodies and modelled fuel lines are shown. Published historical tank capacity is 400 L. Usable fuel, remaining fuel and reserve for R5 remain OPEN.

TextToCADTURBOLET / R5 / 10

W2 support and display details

CAD R5 · 10
W2 strut
W2 strutW2 strut
Boot, wheel and pad
Boot, wheel and padBoot, wheel and pad

The boot, wheel and red pad are shown in the neutral pose. The W2 axis is unchanged. The detail view uses its own scale.

TextToCADTURBOLET / R5 / 11

Sensor run and connection

CAD R5 · 11
Isolated instrument run
Isolated instrument runIsolated instrument run
Probe and coupling
Probe and couplingProbe and coupling

The exhaust-temperature signal runs from EGTProbe through the cable and junction to the instrument. R5 models three loom cores and fittings. Pin assignments, wire sizes and thermal rating remain OPEN.

TextToCADTURBOLET / R5 / 12

Tip nozzle and exhaust vanes

CAD R5 · 12
W2 nozzle assembly
W2 nozzle assemblyW2 nozzle assembly
Engine exit and exhaust vanes
Engine exit and exhaust vanesEngine exit and exhaust vanes

Close-ups show the W2 tip assembly and the control elements by the engine. Actual control response and bleed flow remain OPEN.

Evidence and checks

TextToCADTURBOLET / R5 / 13

Monino on 30 May 2013

PHOTO · 13
Monino on 30 May 2013Monino on 30 May 2013

Museum reference photograph. Clemens Vasters, Vasters 2200, CC BY 2.0. Metric checks need a reference scale in each datum plane.

TextToCADTURBOLET / R5 / 14

Simulated flight cycle

DEMO · 14
Simulated flight cycleSimulated flight cycle

DEMO R5 Flight R1. Liftoff at 4.98 s and contact at 52.55 s. Airborne for 47.57 s with a peak rise of 1.808 m. The curves come from the saved telemetry.

Nominal case video
TextToCADTURBOLET / R5 / 15

Fuel, hover and range

OPEN · 15

Historical publications

Total tank volume
400 L
Historical fuel load
350 kg
Free sortie in the 1957 series
about 6 min

R5

Hover fuel flow
OPEN
Usable fuel and reserve
OPEN
Sustained hover duration
OPEN
Fuel-limited range
OPEN

Hover fuel flow, usable remaining fuel, endurance and range for R5 remain OPEN. The published historical fuel load is 350 kg; its corresponding remaining fuel is unknown.

TextToCADTURBOLET / R5 / 16

First open and CAD files

CAD R5 · 16
First open and CAD filesFirst open and CAD files

Captured in a separate FreeCAD process before camera or visibility settings were changed. Both themes show the saved state of the same model.

TextToCADTURBOLET / R5 / 17

Simulated flows and forces

DEMO · 17
Flows
FlowsFlows
Forces
ForcesForces

The saved DEMO R1 diagrams relate the main flow, bleed air, thrust and support reactions. Branch flow rates and thermal conditions remain OPEN.

TextToCADTURBOLET / R5 / 18

Programme costs

DEMO · 18

DEMO

RegionPrototype and developmentProgramme operationsPer attemptPer airborne second
Russia · RUB49,342,43410,902,9101,855,877231,985
Texas · USD1,244,251310,98144,7405,592
Germany · EUR1,112,339274,99240,1875,023

Cost DEMO from 21 November 2026 in local currencies. The per-second cost uses the airborne phase of the cost scenario. Site quotes, labour hours and measured operating expenses remain OPEN.

Models and files

First open and STEP were checked for the same saved model. Engineering acceptance is tracked separately. Acceptance plan