TURBOLET and Roadster Rocket
Two ways of leaving support. The historical test rig explored control in hover. The Roadster comparison uses observed Tesla stunts and separate Rocket simulations. Qualified cycle duration and cost per successful attempt remain OPEN.


Modes
State the contact and stable support criteria for each configuration. Keep first contact, stable dwell and visible ground roll as separate events.
Vertical takeoff and controlled hover
TURBOLET · flight trialsHistorical stability and control test rig. Tushino demonstration on 20 July 1958.
Weight and thrust apply to the stated historical data only. Duration, authority and attitude traces are OPEN. T01
Museum display on four supports
TURBOLET · Monino R5Both side panels are visible in the 30 May 2013 series. R5 wiring geometry and first opening were checked.
Flight state, mass, thrust and reference-date tail verification remain OPEN. T03
Airborne segment with visible rotation
Tesla · KickflipVisible clearance and rotation. The PTS bracket is 2.878–5.506 s at 1× playback.
Axis, thrust, cause of motion, capture speed, physical duration and touchdown loads are OPEN. R02
Coupled N₂ run, 2 m gate
Rocket · DEV25First contact at 1.770 s, 23.26°. The trace contains 29.5 ms after contact. Run stopped at the skirt speed limit.
The 0.5 s dwell on four wheels was not confirmed. The main 5 m series stands at 0/4. R03
Local mechanics in prescribed attitudes
Rocket · DEV25Four of five local mechanical trials met the 0.5 s dwell. Peak strut speed among those trials was 0.85671 m/s.
The dwell applies to the prescribed contact states. Transfer to the coupled mission remains open. R03
Physical cycle from liftoff to rest
Rocket · AIRDEV25 contains zero filled physical AIR state records. Successful duration and cost per second are OPEN.
The measurement matrix requires synchronized pressure, temperature, mass, volume and phase observation. R03
Forces and frames
Select a published thrust figure and mass for a static check. The figures omit installation losses, bleed, control, drag and reserves. Tesla observations are bounded on the clip playback timebase.
Static thrust-to-weight ratio
Simonov lists 2,150 and 2,835 kgf. Another publication cited in R4 gives 2,500 kgf. Rated, peak and limit figures retain their respective definitions. T04
Tesla frame timestamps
The selected frames bracket the observed interval. Smoke obscures Kickflip contact. Time refers to playback. Physical duration remains OPEN.
Technology
Vertical force and control
One vertical turbojet, exhaust vanes and tip jet channels.
Wheel, ramp and airborne phases have different force regimes. Video establishes visible motion.
Verification · Separate forces, moments and commands on one timebase.
Manoeuvre entry and support recovery
Vertical profile with support monitoring. Zero total reaction and clearance define liftoff.
Ramp includes approach and ramp contact. Kickflip and Encore show airborne rotation. Full landing telemetry is OPEN.
Verification · Rotation axis, first contact, strut speeds and stable support.
Repeatability
Configuration registry, measurement, phase criteria and independent force reference.
DEV25 links a repeat with common samples and records subsystem vetoes.
Verification · One case, two step sizes, first violated limit and a repeat with identical inputs.
Costs and files
Open the files locally. Full-cycle costs require an equivalent scope, initial and final state, rates by market and a count of accepted attempts. Unknown denominators leave cost per second and per success OPEN.
Sources
T01 · Simonov, Sikorsky Readings proceedings · Printed pp. 10–14, test rig, schematic and Tushino demonstration.
T02 · SU120735A1 patent · Figs. 1–4 and description. Jet controls and exhaust control elements.
T03 · R5 configuration and aerodynamic surfaces evidence · Monino on 30 May 2013, P04, P05 and harness entries, linked to the final FCStd checksum.
T04 · R4 registry, thrust and engine variant · E01, E05, E17, E20. The 2,500 and 2,835 kgf values come from different publications.
R01 · Tesla Roadster product page · Manufacturer statements and separate Rocket trim. Test signals and conditions remain open.
R02 · Tesla Kickflip and local frame marks · The release data records presentation timestamps and the local copy checksum.
R03 · Roadster Rocket DEV25 · 21 Nov 2026. Coupled 2 m N₂ run, main 5 m series, local mechanics and AIR.
R04 · R07 native CAD views manifest · Frozen layout for figures. The public demonstrator has a separate configuration.
M01 · Methodology from the LLTV chat · LLTV-RRK-20261121 guide. Steps and checks were adapted to R5.
