R5 engineering and cost parameters
Monino 2013 · museum reconstruction. CAD is model geometry. HISTORICAL is published test-rig data. DEMO is a modelled scenario. OPEN requires evidence. N/A is inapplicable to the documented architecture.
Other vehicle specifications · Roadster Rocket C6I
No matching rows.
Dimensions and layout
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| R5 length × width × height | 10.000 × 10.000 × 3.821 m | CAD | Extents of the visible assembly in X × Y × Z, including museum wheel pads. STEP bounds |
| Opposing landing gear axes | 3.6 m | CAD | Centre-to-centre spacing in CAD. Atlas |
| Boom span and rig height | 10 m / 3.8 m | HISTORICAL | Published value for the historical test rig. Simonov, p. 10 |
| Gear spacing and leg count | 3.6 m / 4 | HISTORICAL | Four-leg configuration. Simonov, p. 10 |
| Measured museum dimensions | — | OPEN | Requires a survey with physical reference points. Atlas |
Mass and balance
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| Actual empty mass | — | OPEN | Requires weighing and an equipment manifest. R1 report |
| Takeoff mass with liquid fuel | 2,340 kg | HISTORICAL | At a 350 kg fuel load. Maximum permitted takeoff mass remains OPEN. Simonov, p. 10 |
| Gas-charged mass | — | N/A | The documented control system is fed by the engine compressor. Simonov, p. 11 |
| Assumed empty mass | 2,050 kg | DEMO | Includes the engine. Scenario mass breakdown. DEMO inputs |
| Assumed flight mass | 2,300 kg | DEMO | Assumed input held constant through the simulation. DEMO inputs |
| Pilot and liquids in the model | 80 kg / 170 kg | DEMO | Assumed input held constant through the simulation. DEMO inputs |
| Centre of gravity, inertia and payload | — | OPEN | Requires wheel-load weighing, configuration and allowable CG limits. R1 report |
Engine, fuel and jet controls
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| Engine in the historical account | RD‑9BL | HISTORICAL | Designation in Simonov. The museum engine record and RD‑9BP/BL identification remain OPEN. Simonov, p. 10 |
| Engine thrust, nominal / maximum | 2,150 / 2,835 kgf | HISTORICAL | Values reported historically. Installed thrust with bleed in a defined flight phase remains OPEN. Simonov, p. 10 |
| Liquid fuel tanks | 2 tanks · 400 L total | HISTORICAL | Published capacity. Individual volumes and usable fuel remain OPEN. Simonov, p. 10 |
| Historical fuel load | 350 kg | HISTORICAL | Condition for the quoted historical takeoff mass. Simonov, p. 10 |
| Remaining, usable and reserve fuel | — | OPEN | Requires load and residual measurements for the same sortie. Fuel evidence |
| Fuel flow in hover and translation | — | OPEN | Requires measured kg/h in each phase with known bleed and mass. Fuel evidence |
| Liquid refuelling rate | — | OPEN | Supply rate in L/min and total fill time remain unverified. Fuel evidence |
| Jet-control medium and supply | Engine compressor bleed air | HISTORICAL | Fed to the jet controls at four boom tips. Simonov, p. 11 |
| Control cylinder count, volume and pressure | — | N/A | The documented control system is fed by the engine compressor. Simonov, p. 11 |
| Gas refill rate and turnaround time | — | N/A | The documented control system is fed by the engine compressor. Simonov, p. 11 |
| Jet pressure, air flow and control force | — | OPEN | Requires measurements by phase and outlet branch. The air source is documented. CAD actuator sites |
| Exhaust jet vanes | 2 vanes · 120 × 430 mm | HISTORICAL | Chord × span. Published adjustable travel limit from ±5° to ±15°. Actual museum setting remains OPEN. Simonov, p. 11 |
| Tip outlet openings in R5 CAD | 10 | CAD | Count of geometric openings in the CAD map. CAD actuator sites |
| Installed thrust and control response | — | OPEN | Requires rig measurements with operating conditions and configuration recorded. Engine section |
Flight and landing
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| Free-flight sortie duration | ≈ 6 min | HISTORICAL | 1957 series, whole sortie. Continuous hover endurance remains OPEN. Simonov, p. 13 |
| Historical flight height | typically up to 3 m · about 80 m once | HISTORICAL | Conditions of the historical campaign. Service ceiling remains OPEN. Simonov, p. 13 |
| Acceleration and time to target speed | — | OPEN | Requires time-synchronised speed measurements for a defined manoeuvre. R1 report |
| Airspeed, ground speed and maximum speed | — | OPEN | Requires a transfer track, wind data and measurement conditions. R1 report |
| Climb rate, service ceiling and wind limit | — | OPEN | Requires flight measurements and a tested operating envelope. R1 report |
| Continuous hover endurance | — | OPEN | Requires hover fuel flow, usable fuel and reserve. Fuel evidence |
| Fuel-limited range | — | OPEN | Requires speed and fuel flow for the same translation regime. Fuel evidence |
| Airborne time, reference R1 | 47.57 s | DEMO | Reference R1 run. This value applies to that scenario. R1 report |
| Simulated centre-of-mass rise | 1.808 m | DEMO | Reference R1 run. This value applies to that scenario. R1 report |
| Net horizontal displacement / path length | 2.242 m / 3.131 m | DEMO | Reference R1 run. This value applies to that scenario. Fuel budget |
| Peak horizontal ground speed | 0.414 m/s | DEMO | Peak √(Vx² + Vy²) during the nominal airborne phase. R1 telemetry |
| Peak horizontal acceleration | 0.221 m/s² | DEMO | Centred XY velocity difference over 0.02 s within the airborne phase. R1 telemetry |
| Peak climb speed | 0.435 m/s | DEMO | Reference R1 run. This value applies to that scenario. R1 telemetry |
| Peak modelled thrust | 23.154 kN | DEMO | Reference R1 run. This value applies to that scenario. R1 report |
| Airborne time, manual command | 47.45 s | DEMO | Manual pulse followed by autopilot. Liftoff to first contact. Manual run verification |
| Touchdown miss / vertical velocity | 0.115 m / -0.190 m/s | DEMO | Manual example, W4 makes first contact. Manual run verification |
| Stable four-point support | 54.67 s | DEMO | Elapsed from start of the manual run until the dwell criterion was met. Positioning |
| Actual landing limits, service life and reliability | — | OPEN | Requires gear tests, inspections and logs of repeated cycles. Acceptance plan |
Manufacturing and operations
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| DEMO programme scope | 3 machines · 2 years · 60 attempts · 8 s airborne per attempt | DEMO | The cost-per-second denominator comes from the costing scenario. Scenario inputs |
| Russia · First unit with development | 49,342,433.99 RUB | DEMO | Manufacturing plus one-time development costs. Cost summary |
| Russia · Programme operations | 10,902,909.60 RUB | DEMO | Fixed, initial and variable operations across the scenario. Cost summary |
| Russia · Cost per attempt | 1,855,876.86 RUB | DEMO | Full programme budget divided by attempt count. Cost summary |
| Russia · Cost per airborne second | 231,984.61 RUB | DEMO | Attempt cost divided by the assumed 8 s airborne costing window. Cost summary |
| Texas · First unit with development | 1,244,251.46 USD | DEMO | Manufacturing plus one-time development costs. Cost summary |
| Texas · Programme operations | 310,980.54 USD | DEMO | Fixed, initial and variable operations across the scenario. Cost summary |
| Texas · Cost per attempt | 44,739.58 USD | DEMO | Full programme budget divided by attempt count. Cost summary |
| Texas · Cost per airborne second | 5,592.45 USD | DEMO | Attempt cost divided by the assumed 8 s airborne costing window. Cost summary |
| Germany · First unit with development | 1,112,339.26 EUR | DEMO | Manufacturing plus one-time development costs. Cost summary |
| Germany · Programme operations | 274,991.88 EUR | DEMO | Fixed, initial and variable operations across the scenario. Cost summary |
| Germany · Cost per attempt | 40,187.36 EUR | DEMO | Full programme budget divided by attempt count. Cost summary |
| Germany · Cost per airborne second | 5,023.42 EUR | DEMO | Attempt cost divided by the assumed 8 s airborne costing window. Cost summary |
| Build, procurement and test quotes | — | OPEN | Requires a bill of materials, labour rates, supplier and test-site quotes. Calculator |
| Actual operating costs and turnaround | — | OPEN | Requires cycle consumption, maintenance labour, preparation time and site rates. Calculator |
| Actual cost per attempt and airborne second | — | OPEN | Requires costs, measured attempts and airborne seconds for one profile. Calculator |
