Roadster Rocket engineering and cost parameters
Current C6I, DEV49. CAD is model geometry. DEMO is a design estimate or numerical result. REQUIREMENT is a project criterion. PTS is video presentation time. OPEN requires evidence. N/A is inapplicable. AIR and N₂ results identify their scenarios.
Other vehicle specifications · TURBOLET R5
No matching rows.
Dimensions and mass
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| Length × width × height | 4590 × 2031 × 1328 mm | CAD | Closed C6I body envelope. Roof height from nominal Z=0. Loaded height requires a separate check. DEV49 evidence |
| Wheelbase | 3150 mm | CAD | Difference between tyre-centre positions in static C6I VIEW. DEV49 evidence |
| Front / rear track | 1710 / 1690 mm | CAD | From tyre bounding-box centres, with 1 mm mesh quantization. DEV49 evidence |
| Loaded ground clearance | — | OPEN | Measure at specified loads and tyre pressures with skirts stowed. DEV49 register |
| Dry mass | 3194.8 kg | DEMO | Design estimate. Excludes compressed gas, operating fluids and driver. Includes allowances for unfinished parts. DEV49 evidence |
| Dry mass range | 2692.2–3963.9 kg | DEMO | Design estimate. Low and high ledger variants reflect composition and mass assumptions. DEV49 evidence |
| Operating mass without gas | 3311.9 kg | DEMO | Design estimate. Includes operating fluids and an 85 kg modelled driver. Driver allowance spans 75–105 kg. DEV49 evidence |
| Operating mass without gas or driver | 3226.9 kg | DEMO | Design estimate. Central operating estimate minus the 85 kg driver. DEV49 evidence |
| Charged mass · AIR launch | 3557.2 kg | DEMO | Numerical result. Initial mass in the matched launch tests. The combined gas and line inventory adds 245.3 kg to the ledger. DEV49 evidence |
| Charged mass · N₂, DEV26 | 3531.8 kg | DEMO | Numerical result. At the start of B2 preparation, including the tank and circuit inventories. From simulation. DEV49 evidence |
| Charged mass · AIR, DEV44 | 3971.0 kg | DEMO | Numerical result. Separate DEV44 packaging hypothesis with an additional reserve and ballast. DEV49 register |
| Maximum gross mass and payload | — | OPEN | Reconcile axle loads, tyre operating limits and structural capacity, then verify by weighing. DEV49 register |
| Measured empty and charged mass | — | OPEN | Weigh the same build with fluids, driver and gas charge recorded. DEV49 register |
Electric drive and battery
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| Traction battery nominal energy | 62.208 kWh | DEMO | Design estimate. ENG62 design, based on nominal voltage and cell capacity. DEV49 evidence |
| Battery charge capacity | 80 Ah | DEMO | Design estimate. 216S16P, 3,456 cells in the design. DEV49 evidence |
| Voltage · nominal / fully charged | 777.6 / 907.2 V | DEMO | Design estimate. ENG62 design values. DEV49 evidence |
| Battery model · continuous / peak power | 400 / 550 kW | DEMO | Design estimate. R3 model limits. Peak limit applies for the first 10 s. SoC, temperature and cooling limits require validation. DEV49 evidence |
| DEV44 auxiliary load | 5.4 kW | DEMO | Design estimate. Assumed auxiliary load for the AIR flight calculations. DEV49 evidence |
| Usable battery energy | — | OPEN | Measure between approved SoC limits at operating temperatures. DEV49 register |
| Battery charge from 10% to 80% | — | OPEN | Requires input-power profile, BMS limits and a run with installed cooling. DEV49 register |
| Wheel power and torque | — | OPEN | Measure the installed drivetrain over speed, SoC and temperature. DEV49 register |
Gas and refilling
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| T400 internal volume | 399.89 L | DEMO | Design estimate. Vessel input volume in the gas map, excluding pipes and adapters. DEV49 evidence |
| T400 initial AIR pressure | 30.00 MPa abs. | DEMO | Numerical result. Map initial state at 20 °C. Vessel working pressure requires separate qualification. DEV49 evidence |
| T200 internal volume | 199.94 L | DEMO | Design estimate. Vessel input volume in the gas map, excluding pipes and adapters. DEV49 evidence |
| T200 initial AIR pressure | 68.95 MPa abs. | DEMO | Numerical result. Map initial state at 20 °C. Vessel working pressure requires separate qualification. DEV49 evidence |
| Baseline total vessel volume | 599.83 L | DEMO | Design estimate. T400 plus T200. The GX and backup maps reference the same T200. DEV49 evidence |
| Additional DEV43/44 AIR reserve | 239.97 L | CAD | Packaging screen for distributed vessels. Usable capacity and pressure depend on selected vessels. DEV49 evidence |
| Modelled AIR inventory · T400 / T200 | 129.104 / 106.166 kg | DEMO | Numerical result. Inventory in initial maps at 20 °C. Whole-vehicle charge depends on configuration. DEV49 evidence |
| N₂ in T400 plus T200 after preparation | 212.435 kg | DEMO | Numerical result. Playback time zero of the DEV26 coupled recording. DEV49 evidence |
| AIR and N₂ refill rate | — | OPEN | For each gas, record delivered mass versus time on the actual station. Capture initial and final states. DEV49 evidence |
| Refill and ready-to-repeat time | — | OPEN | From connection through target charge, settling, leak check and clearance to repeat. DEV49 evidence |
| Station electricity per refill | — | OPEN | Meter the station with compression, drying and cooling inside the cycle boundary. DEV49 evidence |
| Combined two-branch bench delivery | — | OPEN | Instrumented bench records for simultaneous delivery are outstanding. DEV49 evidence |
| Certified vessel volume and working pressure | — | OPEN | Selected vessel certificates and verification of the installed architecture. DEV49 register |
| Liquid propulsion fuel | — | N/A | The C6I scenarios use electric drive and compressed AIR or N₂. DEV49 register |
Acceleration and ground operation
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| 0–100 km/h · electric only | 6.599 s | DEMO | Numerical result. Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust disabled. DEV49 evidence |
| 0–100 km/h · electric + rear AIR | 5.629 s | DEMO | Numerical result. Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust commanded from 0.10 to 0.85 s. DEV49 evidence |
| Rear AIR time saving in the matched calculation | 0.970 / 14.7 s / % | DEMO | Numerical result. Difference in time to 100 km/h. Checked at two integration steps. DEV49 evidence |
| Rear-circuit AIR used in matched run | 33.398 kg | DEMO | Numerical result. Total over the 8 s calculation, with one rear-thrust pulse. DEV49 evidence |
| Maximum ground speed | — | OPEN | Validate gearing, power, drag, stability and tyre speed capability. DEV49 register |
| 100–0 km/h braking distance | — | OPEN | Fix surface, initial mass and tyre state. Measure repeated stops. DEV49 register |
| EV energy consumption and range | — | OPEN | Use a driving cycle and usable battery energy, with documented load and temperature. DEV49 register |
| 0–60 mph · matched timing protocol | — | OPEN | A common timing procedure is required for comparison with the demonstration. DEV49 register |
| Measured 0–100 km/h | — | OPEN | Instrumented run with build, mass and initial conditions recorded. DEV49 register |
Flight and landing
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| N₂ ballistic hop · CoM rise | 2.268 m | DEMO | Numerical result. DEV26 2 m benchmark. Peak above initial equilibrium; 2.232 m above liftoff and 2.694 m absolute. DEV49 evidence |
| Airborne time · N₂ DEV26 | 1.7045 s | DEMO | Numerical result. From liftoff to the first loaded FR tyre. DEV49 evidence |
| Horizontal displacement / path · N₂ DEV26 | 0.856 / 0.857 m | DEMO | Numerical result. Net displacement and projected CoM path length over the same interval. DEV49 evidence |
| Mean airborne horizontal speed | 0.503 m/s | DEMO | Numerical result. Projected path length divided by airborne time. DEV49 evidence |
| Peak airborne horizontal speed | 2.109 m/s | DEMO | Numerical result. Peak across consecutive saved DEV26 samples. DEV49 evidence |
| Peak airborne 3D CoM speed | 4.582 m/s | DEMO | Numerical result. Combines horizontal sample-to-sample speed and recorded vertical speed. DEV49 evidence |
| Vertical speed at touchdown | -2.261 m/s | DEMO | Numerical result. DEV26. Negative values indicate descent. DEV49 evidence |
| N₂ used by end of coupled run | 110.811 kg | DEMO | Numerical result. Combined tank depletion from the saved calculation. DEV49 evidence |
| Prelaunch preparation · DEV26 | 0.912 s | DEMO | Numerical result. Solver time to ready state. Refilling is a separate operation. DEV49 evidence |
| N₂ landing · FR load and peak rod | 48.23 / 0.8787 kN / m/s | DEMO | Numerical result. DEV26 ended with one support and zero dwell at the skirt-rate limit. DEV49 register |
| AIR · limited feed · CoM height | 1.636 m | DEMO | Numerical result. Peak absolute CoM height in DEV44. DEV49 evidence |
| AIR · limited feed · airborne time | 1.3635 s | DEMO | Numerical result. Liftoff to first contact. DEV49 evidence |
| AIR · limited feed · AIR and electricity | 98.423 / 2.3775 kg / Wh | DEMO | Numerical result. To the end of recording. Electricity for the 5.4 kW auxiliary bus. DEV49 evidence |
| AIR · limited feed · dwell / peak rod speed | 0.00 / 1.0502 s / m/s | DEMO | Numerical result. No sustained dwell before the RL rod limit. DEV49 evidence |
| AIR · low return · CoM height | 0.676 m | DEMO | Numerical result. Peak absolute CoM height in DEV44. DEV49 evidence |
| AIR · low return · airborne time | 1.0835 s | DEMO | Numerical result. Liftoff to first contact. DEV49 evidence |
| AIR · low return · AIR and electricity | 105.592 / 3.9698 kg / Wh | DEMO | Numerical result. To the end of recording. Electricity for the 5.4 kW auxiliary bus. DEV49 evidence |
| AIR · low return · dwell / peak rod speed | 0.50 / 0.7638 s / m/s | DEMO | Numerical result. Local dwell achieved at reduced height with no yaw command. DEV49 evidence |
| Local positioning · passed model runs | 27 / 75 cases | DEMO | Numerical result. Local position, heading and landing limits in the DEV45-POS-01 grid. DEV49 evidence |
| Official 5 m CoM rise series | 0 / 4 passed | DEMO | Numerical result. Nominal and adverse runs for AIR and N₂. Acceptance covers the full manoeuvre and landing. DEV49 evidence |
| Hover and yaw objective | 2.50 / 180 / 1.12 m / ° / s | REQUIREMENT | CG world height, yaw change and turn time in the C6I upgrade. DEV49 register |
| Stable landing criterion | 4 / ≥0.50 / ≤1.00 wheels / s / m/s | REQUIREMENT | Four supports, uninterrupted dwell and a speed limit for every rod. DEV49 register |
| Actual airborne time and full cycle duration | — | OPEN | Synchronised liftoff, contact and support dwell. DEV49 register |
| Measured airborne speed and acceleration | — | OPEN | Trajectory telemetry and phase boundaries. DEV49 register |
| Continuous hover endurance and range | — | OPEN | Requires a tested profile. Modelled hops apply to individual runs. DEV49 register |
| Kickflip · presentation-time interval | 2.878–5.505 s PTS | PTS | Frame marks from a public clip. Physical flight time for C6I remains OPEN. PTS record |
Cost and operations
| Parameter | Value | Status | Scope, limitations and source |
|---|---|---|---|
| Prototype build cost | — | OPEN | Complete BOM, supplier quotations, labour, tooling and initial acceptance. DEV49 register |
| Refill and charging station cost | — | OPEN | Quote equipment, installation, commissioning and monitoring. DEV49 register |
| Gas replenishment cost | — | OPEN | Delivered gas mass × gas tariff plus station electricity and service. Include station electricity for AIR compression. DEV49 register |
| Traction electricity cost | — | OPEN | Energy drawn from the grid per 100 km × tariff, including charging losses. DEV49 register |
| Turnaround between attempts | — | OPEN | Critical path through refilling, cooldown, checks and clearance to repeat. DEV49 register |
| Cost per completed manoeuvre | — | OPEN | Include gas, electricity, service and failed-attempt costs. Requires repeatability data and tariffs. DEV49 register |
| Vessel life and service interval | — | OPEN | Qualified vessel data, cycle counting and inspection plan. DEV49 register |
| Suspension, skirts and cable life | — | OPEN | Cyclic durability programme with periodic checks and cost of replacement. DEV49 register |
| Gas and energy per matched task | — | OPEN | Common-protocol measurements of the original are outstanding. DEV49 register |
| Comparative R1 costing scope | 3 vehicles · 2 years · 60 attempts · 4.1916875 s per attempt | DEMO | Costing assumption, midpoint of the Kickflip presentation-time interval. Scenario dated 21 November 2026. Cost inputs |
| Russia · First unit with development | 82,453,101.55 RUB | DEMO | Manufacturing and one-time development costs. R1 cost scenario |
| Russia · Programme operations | 15,286,768.80 RUB | DEMO | Sum of fixed, initial and variable programme costs. R1 cost scenario |
| Russia · Cost per attempt | 3,122,054.56 RUB | DEMO | Programme budget divided by attempt count. R1 cost scenario |
| Russia · Cost per assumed airborne second | 744,820.45 RUB | DEMO | Attempt cost divided by 4.1916875 s of assumed presentation time. Physical airborne second cost remains OPEN. R1 cost scenario |
| Texas · First unit with development | 2,043,075.38 USD | DEMO | Manufacturing and one-time development costs. R1 cost scenario |
| Texas · Programme operations | 434,499.87 USD | DEMO | Sum of fixed, initial and variable programme costs. R1 cost scenario |
| Texas · Cost per attempt | 73,527.43 USD | DEMO | Programme budget divided by attempt count. R1 cost scenario |
| Texas · Cost per assumed airborne second | 17,541.25 USD | DEMO | Attempt cost divided by 4.1916875 s of assumed presentation time. Physical airborne second cost remains OPEN. R1 cost scenario |
| Germany · First unit with development | 1,828,764.08 EUR | DEMO | Manufacturing and one-time development costs. R1 cost scenario |
| Germany · Programme operations | 384,402.37 EUR | DEMO | Sum of fixed, initial and variable programme costs. R1 cost scenario |
| Germany · Cost per attempt | 66,161.51 EUR | DEMO | Programme budget divided by attempt count. R1 cost scenario |
| Germany · Cost per assumed airborne second | 15,783.98 EUR | DEMO | Attempt cost divided by 4.1916875 s of assumed presentation time. Physical airborne second cost remains OPEN. R1 cost scenario |