TextToCAD

Roadster Rocket engineering and cost parameters

Current C6I, DEV49. CAD is model geometry. DEMO is a design estimate or numerical result. REQUIREMENT is a project criterion. PTS is video presentation time. OPEN requires evidence. N/A is inapplicable. AIR and N₂ results identify their scenarios.

Other vehicle specifications · TURBOLET R5

Dimensions and mass

ParameterValueStatusScope, limitations and source
Length × width × height4590 × 2031 × 1328 mmCADClosed C6I body envelope. Roof height from nominal Z=0. Loaded height requires a separate check. DEV49 evidence
Wheelbase3150 mmCADDifference between tyre-centre positions in static C6I VIEW. DEV49 evidence
Front / rear track1710 / 1690 mmCADFrom tyre bounding-box centres, with 1 mm mesh quantization. DEV49 evidence
Loaded ground clearance—OPENMeasure at specified loads and tyre pressures with skirts stowed. DEV49 register
Dry mass3194.8 kgDEMODesign estimate. Excludes compressed gas, operating fluids and driver. Includes allowances for unfinished parts. DEV49 evidence
Dry mass range2692.2–3963.9 kgDEMODesign estimate. Low and high ledger variants reflect composition and mass assumptions. DEV49 evidence
Operating mass without gas3311.9 kgDEMODesign estimate. Includes operating fluids and an 85 kg modelled driver. Driver allowance spans 75–105 kg. DEV49 evidence
Operating mass without gas or driver3226.9 kgDEMODesign estimate. Central operating estimate minus the 85 kg driver. DEV49 evidence
Charged mass · AIR launch3557.2 kgDEMONumerical result. Initial mass in the matched launch tests. The combined gas and line inventory adds 245.3 kg to the ledger. DEV49 evidence
Charged mass · N₂, DEV263531.8 kgDEMONumerical result. At the start of B2 preparation, including the tank and circuit inventories. From simulation. DEV49 evidence
Charged mass · AIR, DEV443971.0 kgDEMONumerical result. Separate DEV44 packaging hypothesis with an additional reserve and ballast. DEV49 register
Maximum gross mass and payload—OPENReconcile axle loads, tyre operating limits and structural capacity, then verify by weighing. DEV49 register
Measured empty and charged mass—OPENWeigh the same build with fluids, driver and gas charge recorded. DEV49 register

Electric drive and battery

ParameterValueStatusScope, limitations and source
Traction battery nominal energy62.208 kWhDEMODesign estimate. ENG62 design, based on nominal voltage and cell capacity. DEV49 evidence
Battery charge capacity80 AhDEMODesign estimate. 216S16P, 3,456 cells in the design. DEV49 evidence
Voltage · nominal / fully charged777.6 / 907.2 VDEMODesign estimate. ENG62 design values. DEV49 evidence
Battery model · continuous / peak power400 / 550 kWDEMODesign estimate. R3 model limits. Peak limit applies for the first 10 s. SoC, temperature and cooling limits require validation. DEV49 evidence
DEV44 auxiliary load5.4 kWDEMODesign estimate. Assumed auxiliary load for the AIR flight calculations. DEV49 evidence
Usable battery energy—OPENMeasure between approved SoC limits at operating temperatures. DEV49 register
Battery charge from 10% to 80%—OPENRequires input-power profile, BMS limits and a run with installed cooling. DEV49 register
Wheel power and torque—OPENMeasure the installed drivetrain over speed, SoC and temperature. DEV49 register

Gas and refilling

ParameterValueStatusScope, limitations and source
T400 internal volume399.89 LDEMODesign estimate. Vessel input volume in the gas map, excluding pipes and adapters. DEV49 evidence
T400 initial AIR pressure30.00 MPa abs.DEMONumerical result. Map initial state at 20 °C. Vessel working pressure requires separate qualification. DEV49 evidence
T200 internal volume199.94 LDEMODesign estimate. Vessel input volume in the gas map, excluding pipes and adapters. DEV49 evidence
T200 initial AIR pressure68.95 MPa abs.DEMONumerical result. Map initial state at 20 °C. Vessel working pressure requires separate qualification. DEV49 evidence
Baseline total vessel volume599.83 LDEMODesign estimate. T400 plus T200. The GX and backup maps reference the same T200. DEV49 evidence
Additional DEV43/44 AIR reserve239.97 LCADPackaging screen for distributed vessels. Usable capacity and pressure depend on selected vessels. DEV49 evidence
Modelled AIR inventory · T400 / T200129.104 / 106.166 kgDEMONumerical result. Inventory in initial maps at 20 °C. Whole-vehicle charge depends on configuration. DEV49 evidence
N₂ in T400 plus T200 after preparation212.435 kgDEMONumerical result. Playback time zero of the DEV26 coupled recording. DEV49 evidence
AIR and N₂ refill rate—OPENFor each gas, record delivered mass versus time on the actual station. Capture initial and final states. DEV49 evidence
Refill and ready-to-repeat time—OPENFrom connection through target charge, settling, leak check and clearance to repeat. DEV49 evidence
Station electricity per refill—OPENMeter the station with compression, drying and cooling inside the cycle boundary. DEV49 evidence
Combined two-branch bench delivery—OPENInstrumented bench records for simultaneous delivery are outstanding. DEV49 evidence
Certified vessel volume and working pressure—OPENSelected vessel certificates and verification of the installed architecture. DEV49 register
Liquid propulsion fuel—N/AThe C6I scenarios use electric drive and compressed AIR or N₂. DEV49 register

Acceleration and ground operation

ParameterValueStatusScope, limitations and source
0–100 km/h · electric only6.599 sDEMONumerical result. Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust disabled. DEV49 evidence
0–100 km/h · electric + rear AIR5.629 sDEMONumerical result. Standing start without rollout, 3,557.2 kg, same initial gas charge. Rear thrust commanded from 0.10 to 0.85 s. DEV49 evidence
Rear AIR time saving in the matched calculation0.970 / 14.7 s / %DEMONumerical result. Difference in time to 100 km/h. Checked at two integration steps. DEV49 evidence
Rear-circuit AIR used in matched run33.398 kgDEMONumerical result. Total over the 8 s calculation, with one rear-thrust pulse. DEV49 evidence
Maximum ground speed—OPENValidate gearing, power, drag, stability and tyre speed capability. DEV49 register
100–0 km/h braking distance—OPENFix surface, initial mass and tyre state. Measure repeated stops. DEV49 register
EV energy consumption and range—OPENUse a driving cycle and usable battery energy, with documented load and temperature. DEV49 register
0–60 mph · matched timing protocol—OPENA common timing procedure is required for comparison with the demonstration. DEV49 register
Measured 0–100 km/h—OPENInstrumented run with build, mass and initial conditions recorded. DEV49 register

Flight and landing

ParameterValueStatusScope, limitations and source
N₂ ballistic hop · CoM rise2.268 mDEMONumerical result. DEV26 2 m benchmark. Peak above initial equilibrium; 2.232 m above liftoff and 2.694 m absolute. DEV49 evidence
Airborne time · N₂ DEV261.7045 sDEMONumerical result. From liftoff to the first loaded FR tyre. DEV49 evidence
Horizontal displacement / path · N₂ DEV260.856 / 0.857 mDEMONumerical result. Net displacement and projected CoM path length over the same interval. DEV49 evidence
Mean airborne horizontal speed0.503 m/sDEMONumerical result. Projected path length divided by airborne time. DEV49 evidence
Peak airborne horizontal speed2.109 m/sDEMONumerical result. Peak across consecutive saved DEV26 samples. DEV49 evidence
Peak airborne 3D CoM speed4.582 m/sDEMONumerical result. Combines horizontal sample-to-sample speed and recorded vertical speed. DEV49 evidence
Vertical speed at touchdown-2.261 m/sDEMONumerical result. DEV26. Negative values indicate descent. DEV49 evidence
N₂ used by end of coupled run110.811 kgDEMONumerical result. Combined tank depletion from the saved calculation. DEV49 evidence
Prelaunch preparation · DEV260.912 sDEMONumerical result. Solver time to ready state. Refilling is a separate operation. DEV49 evidence
N₂ landing · FR load and peak rod48.23 / 0.8787 kN / m/sDEMONumerical result. DEV26 ended with one support and zero dwell at the skirt-rate limit. DEV49 register
AIR · limited feed · CoM height1.636 mDEMONumerical result. Peak absolute CoM height in DEV44. DEV49 evidence
AIR · limited feed · airborne time1.3635 sDEMONumerical result. Liftoff to first contact. DEV49 evidence
AIR · limited feed · AIR and electricity98.423 / 2.3775 kg / WhDEMONumerical result. To the end of recording. Electricity for the 5.4 kW auxiliary bus. DEV49 evidence
AIR · limited feed · dwell / peak rod speed0.00 / 1.0502 s / m/sDEMONumerical result. No sustained dwell before the RL rod limit. DEV49 evidence
AIR · low return · CoM height0.676 mDEMONumerical result. Peak absolute CoM height in DEV44. DEV49 evidence
AIR · low return · airborne time1.0835 sDEMONumerical result. Liftoff to first contact. DEV49 evidence
AIR · low return · AIR and electricity105.592 / 3.9698 kg / WhDEMONumerical result. To the end of recording. Electricity for the 5.4 kW auxiliary bus. DEV49 evidence
AIR · low return · dwell / peak rod speed0.50 / 0.7638 s / m/sDEMONumerical result. Local dwell achieved at reduced height with no yaw command. DEV49 evidence
Local positioning · passed model runs27 / 75 casesDEMONumerical result. Local position, heading and landing limits in the DEV45-POS-01 grid. DEV49 evidence
Official 5 m CoM rise series0 / 4 passedDEMONumerical result. Nominal and adverse runs for AIR and N₂. Acceptance covers the full manoeuvre and landing. DEV49 evidence
Hover and yaw objective2.50 / 180 / 1.12 m / ° / sREQUIREMENTCG world height, yaw change and turn time in the C6I upgrade. DEV49 register
Stable landing criterion4 / ≥0.50 / ≤1.00 wheels / s / m/sREQUIREMENTFour supports, uninterrupted dwell and a speed limit for every rod. DEV49 register
Actual airborne time and full cycle duration—OPENSynchronised liftoff, contact and support dwell. DEV49 register
Measured airborne speed and acceleration—OPENTrajectory telemetry and phase boundaries. DEV49 register
Continuous hover endurance and range—OPENRequires a tested profile. Modelled hops apply to individual runs. DEV49 register
Kickflip · presentation-time interval2.878–5.505 s PTSPTSFrame marks from a public clip. Physical flight time for C6I remains OPEN. PTS record

Cost and operations

ParameterValueStatusScope, limitations and source
Prototype build cost—OPENComplete BOM, supplier quotations, labour, tooling and initial acceptance. DEV49 register
Refill and charging station cost—OPENQuote equipment, installation, commissioning and monitoring. DEV49 register
Gas replenishment cost—OPENDelivered gas mass × gas tariff plus station electricity and service. Include station electricity for AIR compression. DEV49 register
Traction electricity cost—OPENEnergy drawn from the grid per 100 km × tariff, including charging losses. DEV49 register
Turnaround between attempts—OPENCritical path through refilling, cooldown, checks and clearance to repeat. DEV49 register
Cost per completed manoeuvre—OPENInclude gas, electricity, service and failed-attempt costs. Requires repeatability data and tariffs. DEV49 register
Vessel life and service interval—OPENQualified vessel data, cycle counting and inspection plan. DEV49 register
Suspension, skirts and cable life—OPENCyclic durability programme with periodic checks and cost of replacement. DEV49 register
Gas and energy per matched task—OPENCommon-protocol measurements of the original are outstanding. DEV49 register
Comparative R1 costing scope3 vehicles · 2 years · 60 attempts · 4.1916875 s per attemptDEMOCosting assumption, midpoint of the Kickflip presentation-time interval. Scenario dated 21 November 2026. Cost inputs
Russia · First unit with development82,453,101.55 RUBDEMOManufacturing and one-time development costs. R1 cost scenario
Russia · Programme operations15,286,768.80 RUBDEMOSum of fixed, initial and variable programme costs. R1 cost scenario
Russia · Cost per attempt3,122,054.56 RUBDEMOProgramme budget divided by attempt count. R1 cost scenario
Russia · Cost per assumed airborne second744,820.45 RUBDEMOAttempt cost divided by 4.1916875 s of assumed presentation time. Physical airborne second cost remains OPEN. R1 cost scenario
Texas · First unit with development2,043,075.38 USDDEMOManufacturing and one-time development costs. R1 cost scenario
Texas · Programme operations434,499.87 USDDEMOSum of fixed, initial and variable programme costs. R1 cost scenario
Texas · Cost per attempt73,527.43 USDDEMOProgramme budget divided by attempt count. R1 cost scenario
Texas · Cost per assumed airborne second17,541.25 USDDEMOAttempt cost divided by 4.1916875 s of assumed presentation time. Physical airborne second cost remains OPEN. R1 cost scenario
Germany · First unit with development1,828,764.08 EURDEMOManufacturing and one-time development costs. R1 cost scenario
Germany · Programme operations384,402.37 EURDEMOSum of fixed, initial and variable programme costs. R1 cost scenario
Germany · Cost per attempt66,161.51 EURDEMOProgramme budget divided by attempt count. R1 cost scenario
Germany · Cost per assumed airborne second15,783.98 EURDEMOAttempt cost divided by 4.1916875 s of assumed presentation time. Physical airborne second cost remains OPEN. R1 cost scenario